Public facilities items in Orange County
133 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
What these items are about
The subjects carried by every item this filter selects, not just the ones shown below. Each one narrows the list further.
Show these numbers as a table
| Subject | Items |
|---|---|
| Public facilities | 133 |
| Health and human services | 37 |
| Budget and appropriations | 33 |
| Bonds and debt | 24 |
| Contracts and procurement | 21 |
| Schools and education | 21 |
| Historic preservation | 18 |
| Police and public safety | 15 |
| Tax rate and revaluation | 12 |
| Environment and sustainability | 10 |
| Housing and affordability | 9 |
| Parks and recreation | 9 |
-
Draws $376,666 in lottery repair money toward the $984,500 Culbreth Middle School roof replacement.
-
The commission reviews an application for a certificate of appropriateness for exterior and interior renovation of the Murphey School, a designated historic landmark.
-
Staff report on a security consultant's visit to the Historic Courthouse and proposed interim landscaping.
-
Revises the site agreement with the neighboring owner, Capkov Ventures, after the entrance road moved. The county reimburses up to $50,000 for erosion control and may stockpile soil on Capkov's lot.
-
The acting parks superintendent is introduced to the council.
-
A resolution commending the late Commissioner Jamezetta Bedford, who died on 21 June, and naming the county's Crisis Diversion Facility for her.
-
A professional services contract with Timmons Group for special inspections during construction of the Crisis Diversion Facility, the building being named for Commissioner Bedford earlier in the same meeting.
-
New concepts for renovating a county historic landmark, brought for future consideration for a certificate of appropriateness.
-
6.a (updates) Montrose landmark processThe Montrose landmark process; complaints about the historic courthouse's appearance alongside a court security study; renovation progress and a possible new tenant at Twin Creeks; National Register projects; a ground penetrating radar survey of the Poor House Cemetery; a donation project at Harvey's Chapel cemetery;…
-
Next meeting 23 September 2026.
-
A revised process for how the county disposes of land and buildings it owns. The only item on the regular agenda.
-
Naming the county's Crisis Diversion Facility. A resolution commending the late Commissioner Bedford and naming the facility for her comes back on the 1 September agenda.
-
Sale of a 1.24-acre county parcel in Hillsborough.
-
20.51 acres from agricultural residential to a non-residential conditional district, applied for by the Orange County ABC Board so it can build a store. The site is previously disturbed land that held a nursery and landscaping store, sits at a heavily trafficked intersection the ordinance treats as an industrial node,…
-
Final financing resolution for the Crisis Diversion Center, authorizing up to $27,000,000 in 2026B installment purchase financing to pay for its construction.Adopted unanimously.
-
Whether to solicit offers to buy county land at 6823 Millhouse Road.Approved 4-1. Portie-Ascott opposed, saying the county has a practice of selling land well below market value. Another commissioner noted the board can stop negotiations at any point, and a member as…
-
A delay in funding architectural planning for the historic courthouse, and the court staff security requirements bearing on it.
-
The 2026-36 capital investment plan with county, proprietary and school capital projects for the coming year.Accepted 5-1, McKee opposed over total borrowing and the tax burden he expects it to create over the next decade.Staff or committee report Bonds and debtBudget and appropriationsPublic facilitiesSchools and education
-
Final design and guaranteed maximum price for the Crisis Diversion Facility, an amendment to the Gilbane construction manager-at-risk contract, and the budget amendment raising capital authority to match.Approved unanimously. The financing resolution for it, up to $27 million, followed on 9 July.
-
An amendment to the county's 2022 public-private broadband contract, extending service to another 105 unserved households. The original roughly $10 million deal aimed at about 6,370 passings, was cut back to 5,852 homes in autumn 2025, and has paid Lumos $9.2 million with about $800,000 in ARPA money left. 5,859 locat…Approved unanimously.
-
An update on county climate action work.Received.
-
How much of a tax increase to levy for schools. Three increases were on the table.0.81 cents failed 3-4; 0.47 cents passed 4-3.
-
Asset management services, community relations, finance and administrative services, human resources, information technologies and non-departmental.
-
Up to $32,000,000 of installment financing for capital investment projects and equipment, from a preliminary determination of about $60.8 million made at a hearing on 5 May. The finance officer said the 5 percent planning rate stands and the county's credit profile means no significant budgetary impact from Treasury r…
-
Minutes from three April meetings, the tax collector's partial FY 2025-26 settlement through March 31, an excise tax overpayment refund, renewal of the health services agreement for medical care at the county detention center, EMS Week and Heat Awareness Week proclamations, a household hazardous waste contract, budget…
-
The ten-year plan, in which parks and environment projects had been deferred behind school bond and renovation funding.
-
Financing contracts for up to about $60.8 million for the year's capital projects and equipment, with a resolution supporting the county's application to the state Local Government Commission. Staff recommended splitting the package in two, closing in June and in late July or early August, with financing and transacti…
-
The county manager's recommended capital investment plan and updates on ongoing projects. School capital funding was eventually set at $112,524,049.
-
Montrose tour logistics; preservation issues at Hughes Academy and the Cameron Ice House; revised cost estimates in the historic courthouse phase one report; developments for a joint town and county event on 4 July marking the nation's 250th anniversary; the book project; membership; and a marker subcommittee meeting…
-
A one-year moratorium on large-scale data centres as a land use, explicitly covering artificial intelligence data centres, cryptocurrency mining facilities, data processing facilities and similar uses. Directed on 5 March, presented on 17 March, and heard here, with staff simultaneously drafting ordinance amendments t…Approved unanimously
-
A $1.7 million loan for capital improvements at Rocky Ridge Fire Station 2, converting a garage structure into a working fire station with living quarters, office space and kitchen facilities, with the county including the amount in its spring financing. A commissioner noted greater county involvement may bring more s…
-
The ten-year plan as recommended, before the board's amendments on 4 June.
-
Durham Technical Community College president JB Buxton told the board the school hit its 2021 enrollment and completion goals and is building affordable housing in Durham, about a quarter of which will house students. Its Orange County campus addition is due to open in January 2027.
-
The board approved most of a 17-item consent agenda in one vote, including tax releases, proclamations, a server-licensing contract, solar-project funding and a shelter-contract renewal. It pulled a $1.7 million loan for an Orange Grove Fire District fire station after a resident raised transparency concerns, and vote…
-
4-11 Director's ReportStaff updates including interviews for a Seymour Center evening facility manager, a three-day annual monitoring visit from the regional area agency on aging, the hundredth Aging Well Together radio show, an AARP series featuring Chapel Hill, the county government academy, free tax preparation through April 15, Senior…
-
OWASA's annual update to the county commissioners on the utility's recent activities and finances, presented by its board chair, secretary and executive director.
-
Results of the 2025 Longtime Homeowner Assistance programme, which gives low-income county homeowners a discount or rebate on their property tax bill. Staff ran a five-month campaign to raise applications above 2024: a programme flyer with the August tax bills, work with the Jackson Center, Homeowners United and Justi…
-
4-13 Director's ReportStaff updates including the posted Seymour Center evening facility manager position, the regional area agency on aging's monitoring visit rescheduled to March by weather, restoration at the Passmore Center after a water event, work with partners serving unsheltered residents including cold weather cots at the Seymour…Staff or committee report Faith and cultural communitiesHealth and human servicesHousing and affordabilityPublic facilities
-
6.b Condominium Agreement with the Town of Carrboro for the Operation of the Drakeford Library ComplexFinal condominium documents putting the Drakeford Library Complex under shared county and town ownership, replacing a temporary memorandum of understanding from January 2025. Changes since July grow the executive board from two members to four, add mediation for unresolved disputes, bar any charge for library patron p…Approved unanimously, with clarification
-
Thirteen items approved together: five sets of minutes; motor vehicle and property tax releases for eighteen taxpayers; sixteen late exemption applications; a March 25 tax lien advertisement date; the 2026 listing period extended to February 13; budget amendment #6; ordinance execution for the impervious surface, wate…Approved unanimously
-
The January operating model shows a $21.5 million gap for FY 2026-27, rising to $37.6 million and $53.6 million in the two years after. One cent on the tax rate is worth about $3.37 million against a $33.9 billion base, so the gap is about seven cents. Revenue assumptions include 2 percent natural growth worth $4.3 mi…
-
The Seymour Center's evening facility manager was promoted to facility manager, and a request to fill the evening position awaits the county manager's approval to post.
-
Moving the Efland precinct's election day polling place from the Efland Ruritan Club to the Efland-Cheeks Community Center, about 1.8 miles away, on grounds of facility consistency, cost savings, voter familiarity and logistics, with turnout comparisons showing the community center can handle the volume. Voters will b…Approved unanimously, effective immediately
-
The committee has ten members against a maximum of fourteen. Applications arrive but candidates stop responding once they learn 32 hours of training is required. Its quarterly meeting was that evening, reviewing the past quarter's facility visits.
-
The Seymour Center facility manager position is posted, with an internal candidate of interest.Staff or committee report Public facilities
-
Staff described the situation at the Seymour Center and a possible bag policy developed with the library and the county attorney. The county's street outreach team, now back at full staffing, offered training for center staff and will be at the centers the first and third Saturday of each month in 2026. The building a…
-
One facility is developing a new rehabilitation hallway with six tracheostomy ventilator beds, which would be the only such beds in Orange County. Another is offering a $3,250 resident referral payment, taken out of the resident's bill.
-
Moving the Efland election day site from the privately owned Efland Ruritan Club to the county-owned Efland-Cheeks Community Center, already an early voting location, to cut costs, reduce voter confusion and consolidate operations at one familiar public site. Turnout data showed the community center handles a comparab…
-
Six early voting sites: Orange Works at Hillsborough Commons, the Drakeford Library in Carrboro, Chapel Hill Library, Chapel of the Cross, the Seymour Senior Center and the Efland-Cheeks Community Center. Hours run February 12 through 28, weekdays 8 a.m. to 7:30 p.m., the first and last Saturdays 8 a.m. to 3 p.m., Sun…Adopted unanimously
-
The behavioral health committee heard about the county's planned crisis and diversion facility, combining a behavioral health urgent care for acute crisis with a facility-based crisis center offering up to two weeks of care, developed with multiple mental health and community partners. Members framed it as a way to ke…Staff or committee report Health and human servicesPolice and public safetyPublic facilitiesWater and sewer
-
A special use permit for a care facility use on part of a 9.67-acre parcel where a farm-based mental health day program already operates. The permit allows a fire inspection previously refused because of the site's bona fide farm status, which in turn allows licensure and facility-based insurance billing, including Me…Approved unanimously, with a 30-day appeal window
-
Two new staff introduced: a wellness program assistant and an evening facility manager assistant at the Seymour Center.Staff or committee report Public facilities
-
The State Board of Elections randomly selected the OWASA and Town Hall precincts for the sample audit count, to be conducted by bipartisan election officials on November 10.
-
Reduced-cost design options, after the original $28.2 million design exceeded budget, range from a stripped-down 10,080-square-foot version to fuller options preserving a 16-bed detox unit and 12-bay behavioral health urgent care.Board selected Option C, with a friendly amendment to evaluate natural-light features, and directed staff to finalize design for a guaranteed maximum price; unanimous
-
Draft agreement establishing a joint county-schools "Core Team" to oversee major school construction and renovation projects, including a proposed $250,000 project threshold and quarterly public reporting.No vote; board gave feedback and sent staff back to revise the draft, including possibly removing the dollar threshold
-
A construction contract with Brady Services to replace chiller equipment at the Whitted Building.Approved as part of the consent agenda
-
A construction contract with Williams Paving to resurface and seal county parking lots.Approved as part of the consent agenda
-
County staff and both districts discussed a draft interlocal agreement governing bond-funded school construction. Orange County Schools outlined a new elementary school on the Gravelly Hill Middle School site (targeting fall 2029), and Chapel Hill-Carrboro described an on-site replacement of Carrboro Elementary School…
-
Staff showed revised elevation options for a rear addition to the county Board of Education Building after Hillsborough's Historic District Commission denied a certificate of appropriateness for an initial design that copied the original 1980s building. The county commission's own role was to review the options, not t…
-
UNC offered the county a rent-free, up-to-ten-year ground lease on an underused building for a cold weather shelter and a future integrated day center serving unhoused residents; the county would bear renovation and maintenance costs, estimated at $80,000-plus for initial compliance work and $750,000 to $1.25 million…Approved unanimously: authorized negotiation of the lease and a budget amendment for a compliance and design study
-
A review of design options for the county's planned Crisis Diversion Facility.Procedural Public facilities
-
Authorization of the Construction Manager at Risk project delivery method for a new Sheriff's Office evidence storage facility and renovations to the John M. Link, Jr. Government Services Center.Approved as part of the consent agenda
-
The board finalized plans for an October 14 community meeting at the RENA Community Center in Chapel Hill, assigning members to present, greet, staff a resource table and handle other logistics.
-
The director reported that soccer goals for Fairview Park should arrive soon and that the mountain bike skills course at Little River Regional Park is set to open by month's end. The county has also received a petition to name a field at Cedar Grove Park after a local leader, and disc golf course design revisions are…Staff or committee report Public facilities
-
HUD approved technical assistance on the Continuum of Care's governance structure and coordinated entry; a public town hall kicks off the process September 11 at the Drakeford Library Complex.
-
Chapel Hill Retirement Residence LLC contests the county's $28,805,000 value on 700 N. Estes Drive, arguing for a reduction on an income and cost approach. The county proposed no change.No change, value held at $28,805,000, decided 2-1
-
The board reviewed a condominium agreement and memorandum of understanding with Carrboro for operating the shared Drakeford Library Complex, but postponed action after raising questions about dispute resolution and reserves.Postponed to a future date, unanimous
-
A ten-year plan summarised at $75,322,781, built on assumptions of 2 percent property tax growth and 4 percent sales tax growth, with many projects relying on debt. First-year funding covers $38,035,068 in county projects, $33,543,419 in school projects and $3,744,294 in proprietary projects.Accepted unanimously
-
Removed from the agenda
-
Seventeen items, including the HOME 2025-29 consolidated plan and 2025 annual action plan, an audit contract with Mauldin & Jenkins, ElectionWare election management software, an amendment to the purchase agreement for the crisis diversion facility site, contract renewals for courier services, parking deck security an…Approved unanimously
-
A modification to the 2020 special use permit for a recreational facility on Old Greensboro Road and Holly Creek Lane, changing the conditions on seasonal play and revising the site plan to add accessory structures for maintenance and on-site services. The board spent its first hour on standing: of eleven people signe…Permit modification approved unanimously, with an added condition that practices and play go no further than sunset
-
A private gift of about $125,000 will pay for the work. A consultant is coming to scope it; lighting, curtains and flooring are the priorities.
-
The ten-year capital plan, of which only the first year commits money. The board worked down a list of amendments: deferrals on several projects, $100,000 for public EV chargers and $50,000 every other year, $1.8 million of solar over ten years, a climate resilience item aimed at heat as the leading weather-related ki…Ten-year plan accepted; first-year funding of $75,322,781 approved
-
Orange County chose the more structured of the two spending frameworks and receives $12,296,286 over eighteen years; the state keeps 15 percent of North Carolina's settlement and the 100 counties share 85. Five programmes are funded for 2025-26 from fourteen applications, up from four, starting 1 July. The department…
-
IX.A Media ItemsA behavioural health urgent care and crisis diversion facility under development; an emergency preparedness tabletop exercise; a Parents Medical Bill of Rights before the legislature, which members were urged to oppose; a $25,000 grant to animal services for low-cost spay and neuter and pet food pantries; and two arti…
-
The clinic is beyond capacity, with significant vacancies against a surge in maternal health patients; staff are steering out-of-county residents to their own health departments. A capacity assessment is being procured from four bidders and money is set aside for a future clinic expansion. Members discussed the nation…
-
Health claim counts are flat, with a few high claimants moving the totals. Decommissioned software was described as having no consequence for service.
-
A proposed healthcare expansion in the ten-year capital plan is on hold under a chair's amendment while all departments are reviewed. Staff want a consultant to assess whether more staff and exam rooms would let the department serve more people. Medicaid money can only be spent on the programmes it came from. New dent…
-
The north-south bus rapid transit has its final corridor design packet and is preparing for a federal risk workshop, a precondition of final grading, while negotiating property access for stations. The transit director went to Washington to meet both senators' offices. A cost-sharing agreement near the I-40 interchang…Staff or committee report Contracts and procurementHousing and affordabilityPublic facilitiesRoads and transportationTransit
-
From August, 15-minute all-day service on two routes and 30-minute Sunday service across the four core routes. A bus facility at Raleigh Union Station opens in July. The transit assistance programme is refining how discounts are allocated by disability and eligibility. A new chief executive starts in June and a three-…
-
Up to $78,000,000 in installment financing for the year's capital projects and equipment, secured by a collateral package of about $160 million including the Whitted Building, the Hillsborough library, Blackwood Farm Park, Ephesus Elementary, Culbreth Middle, Orange Middle, New Hope, Pathways and Orange High. Interest…Adopted unanimously
-
Reports on mental health training, volunteer recruitment, information hubs at the Efland Cheeks and Cedar Grove community centers, and UNC students translating equipment guides and programme materials into Mandarin and Spanish. On housing: the 2025 senior housing guide is in design, staff are working with DHIC on liva…Staff or committee report Health and human servicesHousing and affordabilityPublic facilitiesRoads and transportation
-
The statutory hearing on financing up to $78 million for capital projects and equipment already approved by the board, secured by a collateral package worth about $160 million.No speakers; resolution to the Local Government Commission adopted unanimously
-
The county has contracted JKOA to assess the project's scope and produce firmer cost estimates. Photogrammetry for rectified photographs and CAD drawings begins 7 May. The building's future use is undecided.
-
A project-by-project review of the county and proprietary capital plans, plus debt service and debt capacity for the general fund, water and sewer, solid waste and the Sportsplex. Commissioners questioned scheduled electrical replacements at West Campus and the Passmore Center, the size of a planned evidence storage b…
-
A five-acre parcel off Waterstone Drive near UNC Hospital in Hillsborough, bought from Capkov Ventures for $1,350,000 with $25,000 earnest money and closing by 30 June, extendable twice by 30 days at $10,000 each. It is already zoned for hospital use under the developer's approved master plan. The capital plan carries…Approved unanimously
-
3.c Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion FacilityConstruction manager at risk services selected from eight responses to a January request for qualifications, with a budget amendment releasing $179,000 so work can start immediately.Approved 5-1
-
A $200,000 grant will put solar on the Cedar Grove Community Center. Trails plan workshops are set for 18 and 21 May, and the county photo contest closes 31 May with few youth entries.
-
The 34-acre complex beside Gravelly Hill Middle School on West Ten Road took 474 reservations and nearly 155,000 visits in FY2023-24, on revenue of $205,362 against direct costs of $238,743, or $408,406 with personnel. The Visitors Bureau put the 2024 showcase tournaments at $3.3 million in total business sales. Field…
-
All facility evaluations are complete and some facilities have made improvements, including installing lifts.
-
A ten-year plan covering county, school and proprietary projects. Its tax increase estimates use the FY2025-26 valuation from the revaluation rather than the current one, it assumes 2 percent property tax and 4 percent sales tax growth, and it depends substantially on debt. Only the first year is committed by approval.
-
Library and social services staff reported on the complex's first year. New library card registrations exceeded staff expectations. The NC Works career center on site runs adult, dislocated worker and youth employment programmes, plus training aimed at people receiving food and nutrition benefits, with Durham Tech as…
-
A mobile crisis team is a prerequisite for the planned crisis diversion facility and may eventually operate from it. A funding request for next year awaits approval.
-
The county split the architectural and engineering contract into two phases, beginning with a full assessment to produce accurate scope and cost estimates. Photo-documentation starts in April. The commission's book carries over 600 photographs and permissions have been slow.
-
Funds for four elections between October 2025 and May 2026, plus recounts, and a building expansion with security upgrades and a new loading dock.
-
A program management director who has handled about $2.7 billion of school capital work in four districts distinguished program management across multiple projects from project management on each job. The county and both districts have not settled which model to use for the bond programme.Direction given to staff; no decision
-
A resident-developed plan for Fairview Park, worked up with a UNC research collaborative. Priorities are soccer in the baseball outfield, improvements near the Dorothy Johnson Community Center, and expanded walking trails connecting to the neighbourhood. Permanent changes depend on the state's landfill remediation rep…
-
Hillsborough's train station funds may be redirected to a multimodal facility and the project is delayed by railroad approvals. The Ridgewalk greenway seeks $2 million over five years. Chapel Hill asked for six DC fast chargers for seven electric buses arriving in FY26. The group agreed transit connectivity must be de…
-
The Drakeford Center library ribbon cutting was set for 21 February. End-of-year arts fundraising netted about $30,000.
-
Carrboro reported progress on the Morgan Creek Greenway and the South Greensboro Street sidewalk, with an NCDOT meeting to come on SDS Drive bicycle and pedestrian improvements. GoTriangle reported its bus facility construction on schedule and on budget, with the CRX rerouting there from Raleigh Station in August 2025…Staff or committee report Budget and appropriationsParks and recreationPublic facilitiesRoads and transportationTransit
-
The school is now listed on the National Register, but needs deteriorated siding repaired, the roof tightened and the exterior painted before a dedication. Staff will pursue a Covington Foundation grant, possibly a challenge grant, and possibly county funding in 2025, and may hold a ceremony on the grant and place the…
-
The county and the courts have started planning an expansion of the justice facility on its current downtown site. Staff told members it will affect the historic courthouse and the new courthouse square master plan, and may have archaeological consequences. Options are still open.
-
The planning team interviewed the top two of five firms that answered the county's request for qualifications and finished its evaluations. A selection is due in early 2025.
-
Three new Seymour Center staff were introduced: an evening facility manager, an evening front desk assistant and a program coordinator assistant. The outreach coordinator and the employment services coordinator are both leaving, with discussions on the future of each position set for January.
-
County managers and the aging director met Mebane's interim town manager about serving older residents there. Mebane already holds service agreements with other agencies and is exploring one with the Department on Aging and possibly Orange County Public Transportation. Mebane is in the Triad Area Agency on Aging rathe…
-
Communications reported an equity and inclusion database compatible with the department's email software, two volunteer spotlight videos, and staff tabling at four events in English, Spanish and Chinese reaching more than 170 people. Community support reported two Mandarin speakers checking in on Mandarin-speaking Mea…
-
Quarterly facility visits are happening. The committee will meet Chatham County's to discuss recruitment and community involvement next year.
-
The annual report and work plan every county advisory board files with commissioners. The main new project for 2025 is the county trails plan, with this council as its steering committee. Members discussed the new recreation center in the capital investment plan and soccer field capacity. Staff will circulate a final…Approved unanimously
-
Gensler has been selected as consultant for the county trails plan, which will synchronize the existing trail networks and plan future connections. Dual tennis and pickleball courts are coming at Fairview Park, Perry Hills mini park finishes in early 2025, and the mountain bike skills course at Little River Regional P…Staff or committee report Public facilities
-
Approved unanimously. It released motor vehicle property tax values for four taxpayers and property tax values for four more, allowed eleven untimely applications for exemption or exclusion from ad valorem taxation for the 2024 tax year, authorized the construction manager at risk delivery method for the Orange County…Approved unanimously
-
UNC athletics presented seven options for the Smith Center: repair and maintain at a twenty-year cost of $150 million, renovate, or build new at one of five sites, being the current location, two other main-campus options, the Bowles parking lot, Odum Village, or satellite locations at the Friday Center, which would b…
-
Matrix Consulting Group's independent staffing and efficiency analysis of the Orange County Detention Center, commissioned on a commissioner's petition. Six findings: the sheriff's office should finish moving to a supervision model matched to the new podular facility rather than the linear indirect model used in the o…
-
A memorandum on the UNC cogeneration facility and its air quality permit modification, and the first quarter FY 2024-25 American Rescue Plan update and financial report.Staff or committee report Budget and appropriationsEnvironment and sustainabilityGrants and outside fundingPublic facilities
-
The board went into closed session at 8:39 p.m. under NCGS 143-318.11(a)(5) to instruct the manager and attorney on negotiating terms of a contract to purchase real property, and to approve closed session minutes. It reconvened at 9:11 p.m.Entered and reconvened unanimouslyClosed session Public facilities
-
Turnout was 77 percent, 88,217 ballots from 114,899 eligible registered voters. The director reconciled voter history against ballots cast at every location and explained each mismatch: provisional ballots at Efland, White Cross, Carrboro Town Hall and Efland Cheeks, a ballot jam at Orange Grove caused by the ballot b…
-
The board named the 203 Greensboro project the Drakeford Library Complex, after Robert Drakeford, Carrboro's first Black mayor.Approved as part of the consent agenda, unanimous.Resolution Public facilities
-
The board approved a contract with Siemens Industry to replace the fire alarm system at the Justice Facility and authorized the county manager to sign it.Approved as part of the consent agenda, unanimous.
-
The county received five proposals from architecture firms for preservation work on the historic courthouse and courthouse square. Interviews are set for November 21, with a contract targeted this fall.
-
The county continues sourcing white oak logs to restore historic log structures, including the barn housing the Davis Cotton Gin. A local carpenter will salvage logs donated from a log house near White Cross that is slated for demolition.
-
Durham Tech's Small Business Center added space at the Innovate Carolina Junction, alongside its main location at the Chesterfield Building, to work more closely with UNC.Staff or committee report Public facilities
-
6.a Durham Tech Orange County Campus Expansion Sustainability Enhancements and Budget Amendment #2-AThe board added $275,000 in debt financing, raising the campus expansion's budget to $11,275,000, to fund an all-electric heat pump system and LED lighting conversion at Durham Tech's Orange County campus. Commissioner Fowler moved approval, seconded by Commissioner McKee.Approved unanimously
-
The board accepted the County Manager's recommendation to name the project the Drakeford Library Complex, ahead of a formal naming resolution planned for November 7.Approved as part of consent agenda (unanimous)Other Public facilities
-
The board awarded a construction contract to Landmark Management Partners, LLC for the community center renovation.Approved as part of consent agenda (unanimous)
-
The board approved a contract with Sound Advice of Eastern NC to upgrade the audio/visual system at the Bonnie B. Davis Environmental and Agricultural Center.Approved as part of consent agenda (unanimous)
-
The board approved leasing part of the Bonnie B. Davis Environmental and Agricultural Center to the North Carolina Forest Service and authorized the manager to sign it.Approved unanimously as part of the consent agendaConsent agenda Public facilities
-
The board approved renewing the county's lease of office space for the Public Defender's Office at 115 East King Street, Hillsborough.Approved unanimously as part of the consent agendaConsent agenda Public facilities
-
The board awarded a construction contract to Hamlett Associates to install automatic transfer switches and generators at the Motor Pool, Public Transportation building and Maintenance Shop.Approved unanimously as part of the consent agenda
-
The board renewed, for five years, the naming rights agreement with Sports Endeavors, Inc. for the county's Soccer.com Center soccer facility on West Ten Road.Approved unanimously as part of the consent agenda
-
County Manager Travis Myren presented the county's new bond education website for a schools facilities bond; staff said they and the bond education committee can present facts but not advocate for the bond with public funds. Commissioners noted endorsements from the Orange County Democratic Party and the Northern Oran…
-
Staff recapped a visit to Ann Arbor, Michigan, on collaborating versus competing with other economic development agencies, the roughly $1 million annual cost of public restrooms, and modular restroom units.
-
Members gave updates on fall festivals and bookings, an ArtsCenter fundraiser, and the Paint It Orange Plein Air event; one member asked about Chapel Hill's Dean Dome relocation talks, which staff said are still in the focus-group stage.
Download these items as CSV Where else this comes up
Follow this
These links carry the filters above. Put one in a feed reader or a calendar and it keeps answering the same question as new meetings are collected — no account, and nothing about you is stored.