Public facilities items in Wake County Public School System
72 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
What these items are about
The subjects carried by every item this filter selects, not just the ones shown below. Each one narrows the list further.
Show these numbers as a table
| Subject | Items |
|---|---|
| Public facilities | 72 |
| Schools and education | 71 |
| Contracts and procurement | 24 |
| Bonds and debt | 2 |
| Budget and appropriations | 2 |
| Intergovernmental agreements | 2 |
| Stormwater and flooding | 2 |
| Broadband and technology | 1 |
| Elections and districts | 1 |
| Land conversion and large development | 1 |
| Litigation and settlements | 1 |
| Parks and recreation | 1 |
-
A resolution reallocating funding within the 2013 capital improvement program and changing the plan of record for the 2013 and continuous building programs.
-
An update on emergency structural repairs at Creech Road Elementary, Davis Drive Elementary and Durant Road Elementary. The district publishes no document for this item.
-
Bids for replacing the fire alarm at Oak Grove Elementary.
-
Add service requests 12 through 16 on the Felton Grove High project, H-12.
-
Change order 1 on the heating, ventilation and air conditioning renovation at Wakefield Middle.
-
The second guaranteed maximum price on the North Garner Middle project.
-
First reading of policy 8350 on bidding for construction or repair work.
-
First reading of policy 7262 on prequalifying bidders for construction projects.
-
Policy 8350 on bidding for construction or repair work.
-
Policy 7262 on prequalifying bidders for construction projects.
-
The superintendent's update on the status of construction and the contracts behind it.
-
Bids for roof and exterior wall repair at Davis Drive Middle.
-
The second amendment to the design contract for Broughton High.
-
The schematic design for Ligon Middle School.
-
The annual report on disposing of district property.
-
Appropriating fund balance for property insurance claims.
-
Insurance for owned and leased real and personal property, boiler and machinery, and musical instruments.
-
The status of repairs at Creech Road Elementary, Davis Drive Elementary and other schools.
-
Bids for a partial roof replacement and building enclosure repairs at East Wake High.
-
Land the school system and the county might dispose of, which is where the two bodies decide whether a surplus site is sold, traded or held.
-
The 2026 schools bond. County staff put the combined school and community college question at $829.1 million for the November ballot, at an estimated half-cent tax impact levied in 2027-28.
-
An operations update.
-
Utilisation at Hilburn Drive Academy's middle grades programme, meaning how the building's capacity compares with its enrolment.
-
The schematic design for Ligon Middle School.
-
An update on the design and construction programme, covering the PRIMP and SNAP renovation schemes and mobile classrooms.
-
Bids for a partial roof replacement and building enclosure repairs at East Wake High, pulled from the agenda and taken on 18 August instead.
-
Bids for the parking lot at Timber Drive Elementary.
-
The first design phase change order at Joyner Elementary.
-
Dedicating a temporary construction easement to the City of Raleigh at Millbrook High School.
-
A job order contract for maintenance and operations with Environmental Holdings Group.
-
A maintenance and operations service agreement for portable toilets.
-
The third amendment on the Paramount Parkway site for Wake Early College of Information and Biotechnology.
-
The 2025-26 facility needs survey the state requires, which is the document a school construction bond case is built on.
-
Authorising the superintendent to execute emergency construction and related contracts for repairs, without each one returning to the board.
-
A topographic survey and easement mapping of sewer routes at Marshburn Road Elementary.
-
The capital improvement programme report on what school construction is costing.
-
A construction manager at risk contract for Briarcliff Elementary.
-
A resolution on using construction management at risk for coming projects.
-
Utilisation concerns, meaning schools whose enrolment and capacity are out of step.
-
Temporary construction and permanent drainage easements granted to a developer.
-
A report on the settlement of a condemnation action against a private property owner. The owner is not named here.
-
A report on settling a condemnation action against a property owner at the Felton Grove site.
-
CONSTRUCTION MANAGER AT RISK SELECTION AND AGREEMENT: ATHENS DRIVE MAGNET HIGH RENOVATION / ADDITIONSelecting a construction manager at risk for the Athens Drive Magnet High renovation.
-
The schematic design for Marshburn Road Elementary.
-
The schematic design for Wake Early College of Information and Biotechnologies and for Parkside.
Download these items as CSV Where else this comes up
Follow this
These links carry the filters above. Put one in a feed reader or a calendar and it keeps answering the same question as new meetings are collected — no account, and nothing about you is stored.