Public facilities items in City of Durham

113 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.

Search and filter
Clear
What these items are about

The subjects carried by every item this filter selects, not just the ones shown below. Each one narrows the list further.

Ranked bar chart of the 12 subjects these items carry. Public facilities leads with 113.
Show these numbers as a table
Subjects carried by these items
SubjectItems
Public facilities113
Contracts and procurement36
Transit9
Water and sewer9
Land conversion and large development8
Fire and EMS7
Intergovernmental agreements6
Roads and transportation6
Housing and affordability5
Parks and recreation5
Police and public safety5
Bonds and debt4
  1. Thu, Nov 19 City of Durham · Durham City Council Work Session
    A second price amendment with Samet Corporation, up to $1.5 million in construction, would raise the Station 19 contract to $24,914,773. The contingency rises by $15,315 to $767,107, and all modifications are capped at $25,681,880.
  2. Mon, Nov 16 City of Durham · Regular City Council Meeting
    Interlocal and joint use agreements with Durham County to design, build and run a new emergency operations center, with backup 911 and sheriff's call centers. It sets up a $26,213,600.77 construction fund and a $1,786,399.23 contingency, capped at $28 million.
  3. Mon, Nov 16 City of Durham · Regular City Council Meeting
    A resolution to lease Suite 103 of the Morgan Rigsbee garage to Downtown Durham, Inc. The agenda gives no rent or term.
    Resolution Public facilities
  4. Thu, Nov 5 City of Durham · Durham City Council Work Session
    Agreements with Durham County to design, build and run a new Emergency Operations Center at 2422 Broad Street, holding emergency management and backup 911 and sheriff's call centers. The city would set up a $26.2 million construction fund and a $1.8 million contingency, capped at $28 million.
  5. Thu, Nov 5 City of Durham · Durham City Council Work Session
    A resolution to lease Suite 103 of the Morgan Rigsbee parking garage, 105 W. Morgan Street, to Downtown Durham, Inc.
    Contract or award Public facilities
  6. Mon, Nov 2 City of Durham · Regular City Council Meeting
    A five-year, $760,374.48 lease for office space and memberships at 411 W. Chapel Hill Street, Suite C2, for the Office of Economic and Workforce Development.
    Contract or award Public facilities
  7. Thu, Oct 22 City of Durham · Durham City Council Work Session
    A five-year lease with Provident1898 LLC, worth $760,374.48, would cover office space and memberships at 411 W. Chapel Hill Street, Suite C2. The manager would also be authorized to sign later amendments, extensions and renewals.
  8. Mon, Oct 19 City of Durham · Regular City Council Meeting
    A $547,698 construction contract with The Daniele Company L.L.C., plus an $83,000 contingency, would reconfigure space in City Hall. The council heard a progress report at its October 8 work session.
  9. Mon, Oct 19 City of Durham · Regular City Council Meeting
    A $5,162,857 amendment would have McKim & Creed, Inc. finish design, permitting and bidding for tertiary filter replacement at the South Durham Water Reclamation Facility. The contract would rise to $6,688,857, and to $7,205,143 with contingency.
  10. Thu, Oct 8 City of Durham · Durham City Council Work Session
    A progress presentation and a construction contract of up to $547,698, plus $83,000 contingency, for reconfiguring City Hall.
    Contract or award Public facilities
  11. Thu, Oct 8 City of Durham · Durham City Council Work Session
    Adds $5,162,857 for final design, permitting and bidding of the South Durham plant's filter replacement, raising the contract to $6,688,857 and its cap to $7,205,143.
  12. Mon, Oct 5 City of Durham · Regular City Council Meeting
    Adds $143,800 to Kimley-Horn's design contract for structural repairs to city parking decks, raising it to $815,600, with a $43,300 contingency.
  13. Thu, Sep 24 City of Durham · Durham City Council Work Session
    A $143,800 amendment to the Kimley-Horn design agreement for structural maintenance of parking facilities, taking the contract to $815,600 with a ceiling of $858,900.
  14. Thu, Sep 17 City of Durham · Regular City Council Meeting
    Roof and envelope repairs at the Environmental and Street Services administration building, awarded to H. M. Kern Corporation for up to $1,380,000 with a $345,000 contingency, capped at $1,725,000.
  15. Thu, Sep 17 City of Durham · Regular City Council Meeting
    A $7,129,066 amendment to the design contract with Teeple Architects for the Junction Road paratransit facility and the Fay Street transportation renovation, raising the contract to $9,520,956 and the ceiling with contingency to $10,330,602.
    Contract or award Public facilitiesTransit
  16. Thu, Sep 17 City of Durham · Regular City Council Meeting
    A guaranteed maximum price amendment with LeChase Construction for HVAC work at City Hall and the annex, plus generator and controls, with construction not to exceed $2,410,548 and the revised contract at $7,327,211. The ceiling with contingency is $8,242,292.
  17. Thu, Sep 17 City of Durham · Regular City Council Meeting
    Resolutions finding construction manager at risk delivery to be in the city's interest and approving the prequalification process, and a preconstruction services contract with The Christman Company for up to $326,444.
  18. Thu, Sep 10 City of Durham · Durham City Council Work Session
    Roof and building envelope repairs at $1,380,000, with a $345,000 contingency the manager may spend without coming back, to a ceiling of $1,725,000.
  19. Thu, Sep 10 City of Durham · Durham City Council Work Session
    A $7,129,066 amendment to the design contract for the Junction Road paratransit facility and the Fay Street renovation, taking the total to $9,520,956 from roughly $2.4 million. The contingency rises to $809,646, and the whole authorization reaches $10,330,602.
    Contract or award Public facilitiesTransit
  20. Thu, Sep 10 City of Durham · Durham City Council Work Session
    Sets a guaranteed maximum price for HVAC work at City Hall and the annex, plus a generator and controls project, with construction capped at $2,410,548 and the whole construction manager at risk contract at $8,242,292.
  21. Thu, Sep 10 City of Durham · Durham City Council Work Session
    Construction of the East End and Longmeadow parks, capped at $2,228,822, with the full contract reaching $2,831,536 including contingency.
    Contract or award Public facilities
  22. Thu, Sep 10 City of Durham · Durham City Council Work Session
    Finds construction manager at risk delivery to be in the city's interest under state law, approves the prequalification process, and hires The Christman Company for preconstruction at up to $326,444.
    Contract or award Public facilitiesTransit
  23. Thu, Sep 10 City of Durham · Durham City Council Work Session
    Declares two city parcels at 700 Colfax Street surplus and accepts offers totalling $4,692, subject to the state's upset bid procedure before the deed is signed.
    Resolution Public facilities
  24. Mon, Aug 17 City of Durham · Regular City Council Meeting
    Adds $861,244 to RND Architects' design contract for roof and envelope repairs, for a total of $1,196,519.
  25. Mon, Aug 17 City of Durham · Regular City Council Meeting
    Adds $300,000 to the contingency for the Durham Station rebuild, capping the contract at $23,212,553.
    Contract or award Public facilitiesTransit
  26. Mon, Aug 17 City of Durham · Regular City Council Meeting
    An interlocal agreement for the partnership's raw water intake facility. The agenda gives no cost.
  27. Mon, May 4 City of Durham · Regular City Council Meeting
    The city sets up a design-build contract, worth up to about $1.4 million with contingency, to upgrade HVAC systems at the Durham Armory.
  28. Mon, May 4 City of Durham · Regular City Council Meeting
    A hearing on a incentive agreement of up to $150,000 for a building-renovation project at 2919 Fayetteville Street.
  29. Mon, May 4 City of Durham · Regular City Council Meeting
    A hearing on an incentive agreement of up to $115,000 for a building-renovation project at 1004 Morning Glory Avenue.
  30. Mon, Apr 20 City of Durham · Regular City Council Meeting
    Ceremonial proclamation marking the Carolina Theatre's 100th anniversary.
    Proclamation or recognition Public facilities
  31. Mon, Apr 20 City of Durham · Regular City Council Meeting
    Authorizes a 10-year lease with Liberty Arts, Inc. for the Liberty Arts Pavilion on Rigsbee Avenue.
    Contract or award Public facilities
  32. Mon, Apr 20 City of Durham · Regular City Council Meeting
    Authorizes an interlocal agreement with Durham County to jointly plan, design, and share a fire/EMS station in southern Durham County.
  33. Mon, Apr 20 City of Durham · Regular City Council Meeting
    Adopts a grant project ordinance for FY2025-26 FTA bus and bus facility funding.
  34. Mon, Mar 16 City of Durham · Regular City Council Meeting
    Ceremonial proclamation honoring the Carolina Theatre.
    Proclamation or recognition Public facilities
  35. Mon, Mar 16 City of Durham · Regular City Council Meeting
    Adds $15,500 to a design contract with CMTA of Kentucky for the City Hall and Annex HVAC project.
    Contract or award AnnexationPublic facilities
  36. Mon, Mar 16 City of Durham · Regular City Council Meeting
    Awards a contract up to about $4.8 million with contingency to Fred Smith Company for repairs and upgrades at the yard waste facility.
  37. Mon, Mar 16 City of Durham · Regular City Council Meeting
    Extends the city's Golden Belt office lease five years for $2.2 million, with an option for a further five-year extension at $2.78 million.
    Contract or award Public facilities
  38. Tue, Jan 20 City of Durham · Regular City Council Meeting
    Authorizes up to $2,000,000 to Durham Tech for street and right-of-way improvements near its new Health Sciences Building.
  39. Tue, Jan 20 City of Durham · Regular City Council Meeting
    Sets a guaranteed maximum price of up to $24,181,880 with Samet Corporation for construction of Fire/EMS Station 19, including contingency funds.
  40. Dec 15, 2025 City of Durham · Regular City Council Meeting
    A five-year land lease, with a five-year renewal option, for city property at 4238 University Drive.
    Resolution Public facilities
  41. Dec 15, 2025 City of Durham · Regular City Council Meeting
    A $1.9 million contract amendment for engineering, permitting, and design work on rehabilitation of the Brown Water Treatment Plant's terminal reservoir dam, bringing the contract total to about $3.96 million.
  42. Dec 1, 2025 City of Durham · Regular City Council Meeting
    Proposal to designate 500 West Main Street as the permanent home for the Museum of Durham History.
    Referred back to staff.
  43. Nov 17, 2025 City of Durham · Regular City Council Meeting
    Consent approval of a design-build contract with Brady Trane Service for Carolina Theatre HVAC upgrades, with total costs including contingency not to exceed $5,860,000.
    Consent agenda Public facilities
  44. Oct 20, 2025 City of Durham · Regular City Council Meeting
    Design-build contracts with ReNu Energy Solutions for a rooftop solar array project on city buildings, up to $2.37 million combined.
  45. Oct 20, 2025 City of Durham · Regular City Council Meeting
    A $95,463 amendment to the citywide window washing services contract with DeWhit Facility Services, bringing the total to $125,449.
    Contract or award Public facilities
  46. Sep 15, 2025 City of Durham · Regular City Council Meeting
    The council considered a $2.1 million amendment to the architect's agreement for the Public Works Operations Center renovation, bringing the total contract to nearly $3.2 million including contingency.
    Contract or award Public facilities
  47. Sep 15, 2025 City of Durham · Regular City Council Meeting
    The council considered a use agreement with the West End Community Foundation for the recreation center at 1309 Halley Street.
  48. Aug 4, 2025 City of Durham · Regular City Council Meeting
    The consent agenda included a lease agreement with NCDOT for portions of the Durham & South Carolina Railroad corridor for use as a public recreational trail or alternative transportation facility.
  49. Aug 4, 2025 City of Durham · Regular City Council Meeting
    The consent agenda included a $1,397,700 amendment to the Turner & Townsend Heery program management contract for the Water Management Facility Expansion project, for a revised total not to exceed $4,328,700 plus a $250,000 contingency.
  50. Aug 4, 2025 City of Durham · Regular City Council Meeting
    A public hearing was scheduled on amendments to Durham's stormwater performance standards and Stormwater Facility Replacement Fund ordinances, including a new section on refunds of payments into the fund.
  51. Jun 16, 2025 City of Durham · Regular City Council Meeting
    The city's whole budget in one item. It adopts the operating budget, raises every pay plan — open range, step, fire and police — by 1.45 percent, lifts part-time starting rates by the same and widens the step spreads from 3 to 5 percent, and adopts six capital project ordinances covering general, water and wastewater,…
  52. Jun 16, 2025 City of Durham · Regular City Council Meeting
    Contract or award Fire and EMSPublic facilities
  53. Jun 16, 2025 City of Durham · Regular City Council Meeting
  54. Jun 16, 2025 City of Durham · Regular City Council Meeting
  55. Jun 2, 2025 City of Durham · Regular City Council Meeting
  56. Jun 2, 2025 City of Durham · Regular City Council Meeting
  57. Jun 2, 2025 City of Durham · Regular City Council Meeting
  58. May 19, 2025 City of Durham · Regular City Council Meeting
  59. May 19, 2025 City of Durham · Regular City Council Meeting
  60. May 19, 2025 City of Durham · Regular City Council Meeting
  61. May 8, 2025 City of Durham · City Council Work Session
  62. May 8, 2025 City of Durham · City Council Work Session
  63. May 8, 2025 City of Durham · City Council Work Session
  64. Apr 7, 2025 City of Durham · Regular City Council Meeting
    A resolution approving a multifamily housing facility.
  65. Apr 7, 2025 City of Durham · Regular City Council Meeting
  66. Mar 3, 2025 City of Durham · Regular City Council Meeting
    Construction to renovate the public works operations centre.
  67. Mar 3, 2025 City of Durham · Regular City Council Meeting
  68. Mar 3, 2025 City of Durham · Regular City Council Meeting
  69. Mar 3, 2025 City of Durham · Regular City Council Meeting
  70. Mar 3, 2025 City of Durham · Regular City Council Meeting
  71. Feb 17, 2025 City of Durham · Regular City Council Meeting
    Work on solid waste transfer station building 1.
  72. Jan 6, 2025 City of Durham · Regular City Council Meeting
    Structural maintenance construction on parking facilities.
  73. Dec 2, 2024 City of Durham · Regular City Council Meeting
    Acceptance of $297,140 from the Department of Energy to install rooftop solar at the W.D. Hill Recreation Center, with a capital improvement ordinance amendment.
  74. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A guaranteed maximum price amendment with Samet Corporation and W.C. Construction Company, a joint venture, capping construction at $21,860,400 for a revised construction manager at risk contract of $21,950,402, with $962,151 in contingency and a modification ceiling of $22,912,553.
  75. Nov 18, 2024 City of Durham · Regular City Council Meeting
    Purchase of about 12.2 acres at 730, 734 and 740 Junction Road from Omni Builder Group Corp. and Home-Kim/HK Windows, Inc. for $2,000,000, for a GoDurham Access maintenance facility.
    Contract or award Public facilitiesTransit
  76. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A finding that design-build is in the city's interest for a columbarium at Beechwood Cemetery, a $17,500 preliminary design and preconstruction contract, and authority to amend for construction up to $157,500, for $175,000 in all with $5,000 contingency and a $180,000 ceiling.
  77. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A janitorial contract for the Durham Armory with Top Notch Carpet & Upholstery Cleaning, LLC, not to exceed $129,000.
  78. Oct 21, 2024 City of Durham · Regular City Council Meeting
    Authorizes a $190,786.28 contract with Brightly Software for a computerized maintenance management system.
  79. Oct 21, 2024 City of Durham · Regular City Council Meeting
    Accepts streets and infrastructure for city maintenance across nine developments, including Creekside Commons, Croasdaile Farm North and the Meadows at Southpoint.
  80. Oct 21, 2024 City of Durham · Regular City Council Meeting
    Authorizes a $197,305.08 contract with TT FASTER LLC to upgrade Fleet Management's FASTER software system.
  81. Oct 21, 2024 City of Durham · Regular City Council Meeting
    Raises the income cutoff for the city's low-income parking discount to 80% of area median income, lifts the discount to 75% off, and adopts a parking facility fee ordinance effective November 1.
  82. Sep 16, 2024 City of Durham · Regular City Council Meeting
    The council will hold a quasi-judicial hearing on three permits for Lyons Farm Elementary School: a major special use permit, a transportation special use permit and a major site plan amendment.
  83. Sep 3, 2024 City of Durham · Regular City Council Meeting
    It authorized a five-year PlotBox Inc. software-as-a-service contract, not to exceed $79,500.
  84. Aug 19, 2024 City of Durham · Regular City Council Meeting
    The council adopts a resolution backing up to $29,000,000 in multifamily housing revenue bonds for a project called 500 East Main.
  85. Jun 3, 2024 City of Durham · Regular City Council Meeting
    The council would approve a contract with Mosca Design, Inc., of up to $100,000, to restore banners at the Corcoran Street parking garage.
  86. May 20, 2024 City of Durham · Durham City Council
  87. Mar 18, 2024 City of Durham · Durham City Council
  88. May 15, 2023 City of Durham · Durham City Council
    A proclamation for national public works week.
    Proclamation or recognition Public facilities
  89. Feb 20, 2023 City of Durham · Durham City Council
    The council considers a design contract with DTW Architects & Planners, Ltd. for the up-fit of the former Wheels Skating Center.
  90. Dec 5, 2022 City of Durham · Regular City Council Meeting
    The council would authorize a contract with Cyber Synergy Consulting Group, LLC to finish last-mile fiber connections at four city facilities, not to exceed $78,021.30, with an $11,700 contingency and an $89,721.30 cap.
  91. Dec 5, 2022 City of Durham · Regular City Council Meeting
    A parallel contract with Lexair Electronics Sales Corporation would connect five more city facilities, not to exceed $51,374.95, with a $7,706 contingency and a $59,080.95 cap.
  92. Dec 5, 2022 City of Durham · Regular City Council Meeting
    A third contract, with G & S Communications and Technical Services, Inc., would connect eight facilities, not to exceed $98,985, with a $14,850 contingency and a $113,835 cap.
  93. Nov 21, 2022 City of Durham · Regular City Council Meeting
    The council would receive an update on the disposition and redevelopment of 505 W. Chapel Hill Street and authorize a $175,000 consulting contract with HR&A Advisors, Inc. Staff previously presented on the project at the November 10 work session.
  94. Nov 21, 2022 City of Durham · Regular City Council Meeting
    The council would authorize a ten-year amendment to the license agreement with American Towers, LLC for the city's emergency communications equipment at Parkwood Tower.
  95. Nov 21, 2022 City of Durham · Regular City Council Meeting
    The council would find that a design-build method serves the city's interest for Fire and EMS Station 19 and authorize a design and pre-construction contract with Monteith Construction Corp. not to exceed $1,051,150, plus a $200,000 contingency for a total of $1,251,150.
    Contract or award Fire and EMSPublic facilities
  96. Nov 7, 2022 City of Durham · Regular City Council Meeting
    The council would adopt a resolution approving the Cedar Trace Apartments multifamily housing project and financing it with revenue bonds of up to $22,000,000.
  97. Oct 17, 2022 City of Durham · Regular City Council Meeting
    The council would authorize a $9,000 agreement with the Town of Cary to run a bench and pilot testing study at the Cary/Apex Water Treatment Facility.
  98. Aug 1, 2022 City of Durham · Regular City Council Meeting
    Would appoint Ari S. Medoff as the mayor's appointee to the Durham Convention Center Authority, succeeding Lewis H. Myers.
  99. Aug 1, 2022 City of Durham · Regular City Council Meeting
    Would approve a multifamily housing project called 300 East Main and its financing with up to $22,500,000 in multifamily housing revenue bonds.
  100. Aug 1, 2022 City of Durham · Regular City Council Meeting
    Would authorize a $190,594 change order with Incline Construction for the Durham Convention Center repair project, raising the contract to $670,548.85. A $20,000 contingency would bring the cap to $690,548.85.
  101. Aug 1, 2022 City of Durham · Regular City Council Meeting
    Would amend a geotechnical engineering contract with A1 Consulting for Fire and EMS Station 18, raising it to $67,380. A $15,000 contingency would bring the cap to $82,380.
    Contract or award Fire and EMSPublic facilities
  102. Aug 1, 2022 City of Durham · Regular City Council Meeting
    Would modify the design-build agreement with Monteith Construction Corp. for Fire and EMS Station 18. It would raise the guaranteed maximum price to $6,867,922 and the total agreement cap to $7,438,991.
    Contract or award Fire and EMSPublic facilities
  103. Aug 1, 2022 City of Durham · Regular City Council Meeting
    Would receive an update on redeveloping 505 W. Chapel Hill Street and reject all proposals from the city's February 2022 request for proposals on the property.
  104. Jun 6, 2022 City of Durham · Regular City Council Meeting
    The council would authorize a $2,104,751 contract with Owens Roofing, Inc. for roof repairs at Department of Water Management buildings, plus a $210,475 contingency fund, for a total not to exceed $2,315,226.
  105. May 16, 2022 City of Durham · Regular City Council Meeting
    The council would accept streets and infrastructure for city maintenance in ten developments, including Copley Farms, Davis Park Townhomes, Page Park Townhomes II and 300 Chandler Road.
  106. Mar 7, 2022 City of Durham · Regular City Council Meeting
    The council would award a five-year janitorial services contract for the Public Works Operations Facility to Dynamic Cleaning and Maintenance Company, not to exceed $785,703 over the term.
  107. Jan 18, 2022 City of Durham · Regular City Council Meeting- Virtual
    The council would authorize a design-build amendment with Dewberry Design-Builders for the Durham Bulls Athletic Park boiler replacement, up to $273,215, raising the contract to $294,335, with authority to modify it up to $315,355.
    Contract or award Public facilities
  108. Jan 3, 2022 City of Durham · Regular City Council Meeting- Virtual
    A resolution would approve the Hardee Street Apartments multifamily housing project and let it be financed with up to $17,000,000 in multifamily housing revenue bonds.
  109. Jan 3, 2022 City of Durham · Regular City Council Meeting- Virtual
    A contract with CDM Smith, Inc. would pay $4,004,498 plus a $400,450 contingency for preliminary engineering on the Western Intake Partnership's regional water treatment facility, with authority for the city manager to negotiate amendments up to $4,404,948 total.
  110. Dec 6, 2021 City of Durham · Regular City Council Meeting
    The council would authorize a three-year janitorial contract with TopNotch Carpet & Upholstery Cleaning, LLC for the Durham Armory at about $40,000 a year.
  111. Nov 1, 2021 City of Durham · Regular City Council Meeting - Virtual Meeting
    The council considers a furniture and workstation purchase contract with PMC Commercial Interiors for the Department of Water Management Facility Complex, capped at $1,375,000 including a $125,000 contingency.
    Contract or award Public facilities
  112. Nov 1, 2021 City of Durham · Regular City Council Meeting - Virtual Meeting
    The council considers a $571,379 contract with Brady Integrated Security for access-control and security equipment at the Department of Water Management Facility Complex, with a $57,121 contingency.
  113. Nov 1, 2021 City of Durham · Regular City Council Meeting - Virtual Meeting
    The council considers a public-engagement and conceptual-planning contract with Ratio States-NC for outdoor aquatics projects, capped at $336,930 including a $30,630 contingency.