Work Session
Town of Cary ·
Town Council
Tuesday, October 27, 2026 at 5:30 pm · Herbert C Young Community Center, 101 Wilkerson Avenue, Cary, NC 27513
Agenda document Meeting page Watch Meeting recap
What's on this agenda
A stormwater utility fee is the one topic on this work session's agenda, listed as a discussion of a council priority. The one-page agenda attaches no staff memo, so it gives no fee amount, rate structure or timeline.
The council also reviews its upcoming meeting schedule, hears the town manager's update and goes into closed session; the agenda does not give a reason for the closed session. Cary's work sessions take no public comment.
Summarized from the published agenda. Read the agenda itself before acting on it.
Meeting recap
What happened, drawn from the records published after the meeting. Recording
This account comes from the meeting recording. The council heard its first briefing on a possible stormwater utility fee and made no decision; staff said none was being asked for. The town manager opened by saying media reports had misdescribed the session as a water and sewer rate discussion. The assistant town manager said the fee work is part of an update to the 2014 stormwater master plan, which staff expect to bring through a public hearing and the Planning and Zoning Board in time for adoption around fall 2027. Cary pays for stormwater from the general fund, averaging about $4.3 million a year, and has no dedicated fee.
A consultant from Corvias Infrastructure Solutions presented four funding scenarios, from the federal and state minimum to an expanded capital program. He recommended billing by impervious surface, using a 4,000-square-foot equivalent residential unit, or a tiered version of it, over a flat fee. As heard on the recording, the scenario that adds about $4 million a year of capital work came to roughly $8 a month per typical property under that method, or about $11 as a flat fee. A School of Government finance specialist described how about 100 North Carolina utilities charge such fees, and said the school takes no position. Council members asked what each funding level would buy, whether decks and patios count as impervious, whether nonprofits would pay (staff said they would; only government parcels are excluded), and whether hardship relief like the town's water bill assistance could apply. Staff will come back with timelines for the legal, billing and public engagement work. In the manager's update, the mayor reported on the council recommendations committee, whose draft policies were to return to the full council at the November 16 work session, and the manager said there was no closed session.
Full transcript
Automatic captions from the recording, "Cary Council Work Session – October 27, 2026". Runs 1 hr 40 min. These are machine transcriptions, not a court record. They misrender names and figures — "Kildaire" comes through as "kill dare", and case numbers arrive as noise. Each timestamp opens the video at that moment, which is how a passage here gets checked against what was said.
Read the transcript (49 passages)
Mhm.
We'll call to order this October 27th work session of the Cary Town Council and I'll turn it over to our town
manager,
Russ Overton.
Thank you, Mayor. All right, so I'll go through the quick agenda. Um we're going to review with Ginny the upcoming meeting schedule. Then our real main topic tonight is um discussion around stormwater, stormwater master plan, and we'll touch on um what [snorts] a utility fee might look like. Uh a few updates, and I don't think there's a closed session, Lisa.
[snorts]
Ginny?
All right, so this is our upcoming um work session and regular meeting schedule. And our quarterly will happen November the 5th.
Next week?
Yes, next week. I can't believe it's November, yes.
It sneaks up.
And then um no questions about that. There is a handout at your desk, which is the draft 2027 meeting schedule. Um I appreciate council's feedback. last work session about kind of the um dates that we were scheduling around. And then also we've created this and sent it out to you as well. The quarterlies are already on your calendar, and from the looks of your town calendar, it looks like everybody is here. We checked uh calendars. And as well, um January-March 2027 has already been adopted, but then we'll re-adopt them at the December 7th um regular meeting. I'm sorry, that should be December um December 10th regular meeting.
[snorts]
So, Ginny, if there's any dates we know right now that we can't make, this is the time to tell you.
Um that or send me an email, cuz it's still in draft.
Okay, I can do that.
Um and then we can bring it up here, and also, you know, it's if you wanted to talk to council about moving dates that potentially you wouldn't be at, then that would um we could bring it back to the work session and talk through it.
Okay.
I'm good.
All right. All right. So, I'm going to um kick it over to Assistant Manager Dana Windmar to start us off in the conversation and maybe I'll um don't want to repeat what Dana's going to say, but I may frame this as there was some um media attention to this um topic tonight. And just Dana's going to go over this too, but just to make sure it's very clear that it's a a stormwater discussion, not a utility fee discussion um water thank your water and sewer bill or rate discussion regarding that. So, I just want to make that clear as we start the topic as may have been misreported um earlier today. And Dana's going to talk about what stormwater actually is and isn't. So,
Thank you for that. And uh before I jump into it, I'm really happy to be back here. Uh it's a really cool topic. You have to get into some detail today that is not as cool as the topic itself, but that's okay. Uh and uh and the actual portion of this that is relates to the stormwater utility was something that was rated high on your priority list um recently when when everybody gave their kind of things that that were their highest priorities and this is one of the items that that rated high. So, just a few things that I would like you to be able to take away from this today is first of all, um Cary Stormwater Department implements state and federal mandates. Meaning uh a lot of times we like to talk about the fun and cool stuff, the the pond at downtown park, and it is fun and it is cool. Uh at the same time, we are it we're obligated to do various things. Uh and we're going to just kind of touch on that ever so briefly to refresh everybody's memory about that. Um the second thing that I'm hoping you'll take away is that uh although the focus today is on the on the stormwater utility aspect of it
because that topic is so rich. Um this is actually part of a bigger effort, which is a stormwater master plan update. And uh and that will be mo- moving through the normal approval process over the next year. So you'll see it at a town council um public hearing, and then it'll go to planning and zoning, and so the normal process will be uh um coming forward on that. And then the third bullet point really is the majority of what we are going to talk about here today. And that is um exploring the strategies that are associated with implementing a stormwater utility. Uh and I would like to underscore it takes years to do this. So I'll go through a little bit of history to see to to let you know where how we've gotten to where we are today. Um but it you know, I mean, it's not like next year we would have a stormwater utility if we if there was a um uh uh a desire to move forward. There would be more studies, et cetera. Um and part of this very importantly is your discussion is extremely important to us. So that we can hear your thoughts, um understand your questions. You do not need to make a decision today. You are not making a decision to move forward with a stormwater utility. That would require additional studies that would need to be funded, things like that. Uh so really your questions, your discussion is the most important thing. And um we have experts here, much like when we had Ty, that can answer a lot of questions for you if you have them. So So what is stormwater? Um most importantly, I want to make sure it's essentially what happens after rain falls from the sky. Now, I use the term rain. It could be snow. It could be sleet. It could be all kinds of things. It just happens that in North Carolina it's primarily rain that falls from the sky. And once it falls from the sky, it
flows across land. Some land it absorbs into, Uh but most land even even land that absorbs a lot, it's there's still a certain amount past which, you know, like if if the storm lasts is above a certain intensity or last for period of time, it's going to flow across all different types of land. It's going to flow across the roof the roofs of buildings, streets, and then ultimately it gets into pipes and streams. So, the streams that are in Cary I many of you are very familiar with White Oak Creek and and the other streams that are in Cary, they that is part of the stormwater system here. In fact, it is not unusual for pipes to actually feed into the creek system. And um and then probably equally as important as what stormwater is is what it is not. Stormwater is conveyed through a separate system from wastewater. So, we are definitely not talking about toilets flushing. We are definitely not talking about shower water. It's it's a completely separate system. There can be confusion in in in what actually it is because in some places it actually is combined, which is not a best practice today, but there are a lot of places that are very very old and they have a combined system. Cary has no combined system. Stormwater is a completely separate system than wastewater. And regulated differently.
[laughter]
Okay. There it goes. Okay. Okay. So, what is what is the stormwater program today? It's actually a department that has many many programs within it. This is just some of it. And I've rolled everything up on that first bullet point, which is actually quite a lot. There's quite a lot of detail associated with that, but essentially
it's part of the NPDES, which is national pollutant discharge elimination system. That is one of the required things that we do here in Cary. And um and we are a phase two community and there are six programs associated with that. Six part parts to it. Then we have other programs um which are like um uh capital improvement program. Uh we have a uh dam and lake maintenance program. So we we monitor all the dams that we own and the lakes that we own and uh and make sure that they're that improvements are fed into our capital improvement project over time. And then of course, we look at development projects that come in, all those different things. Floodplain management is also another aspect of what we do and that relates to FEMA.
[snorts]
Um so there are regulatory components associated with that as well. Uh and then a little bit more unique, I don't know if it's unique in all communities, but Cary has taken it very seriously and that is the resident services aspect of things. So we get an average of 80 calls per month. We will talk to people if it's site specific or if it's um a lot much larger area to help provide them with information and uh and things. So if you can imagine, typically if the average is 80, that means that there's going to be some months that are 40 and some months that are 250. And that just is um related to the amount of rain that we get or uh any kind of storm that hits that causes issues.
And you all get calls.
Yes. You get it equally as much as we do.
[laughter]
Um when that happens. Okay. So focusing in on the stormwater master plan specifically. Uh this um there was a presentation back in 2024 and at that presentation we discussed stormwater, kind of like the history of
where things had been. We talked about how we had made a shift in 2018 that was related to the adaptive stormwater program. And that shift uh was um very specifically to uh we've always maintained um everything that is Cary owned. So, everything that's in the right of way, everything that uh is on our own parks and different things. The shift that we took in 2018 was to further develop our uh our programs and our technologies and our tools to be able to assist our citizens more. So, as opposed to saying that's your land and your water and this is our land and our water, we now have a program that allows us to do modeling and provide a lot of information. It's still their land, still their um uh water associated with it, still our land and our water, but we have the capability to provide them with a lot of our citizens and developers with a lot of information that um is based on all of this stuff. And that was that was a um kind of a a point in time, the 2024 date, where we said, "We've made all these changes to our program, but our actual master plan was dated 2014. And so, we need an update." So, we started on the update. We um put out an RFP that year. We selected a consultant in '25, and uh and then we got into the financial analysis aspect of things. So, really that's the focus of today. There's a whole lot more associated with the um stormwater master plan that you're going to see in the normal processes, but we really wanted to get your feedback, your questions, your thoughts on that one specific aspect of it cuz it's quite complicated. And um we would anticipate the actual stormwater master plan should be through the whole system by the fall of next year. And so, we'll have an update um effective '27.
So, this is where we're going to get into the financial analysis um tools and recommendations. And our team includes three groups and you're going to hear from two of them here today. So, Gradient is actually a Cary-based company and they're the lead on the project and they're working on a lot of the other aspects of it. And then today, the two groups that we're going to hear more from are CIS and the School of Government who have provided us expertise and guidance to help us take a little bit closer look at this.
[clears throat] [snorts]
Okay, so I'm going to turn it over now and the I'm going to introduce both of you and and and then I think it's going to be Shri next. Okay, so Shri is from CIS and and and they've done a lot of the detailed modeling and things to take a look at what might be possible here in Cary. How you might look at it. What are the pros and cons of things. And then Hope is from the School of Government and she's going to be able to provide you with more things about what's it look like in the state because stormwater utility is something there's very few programs that the state has authorized municipalities to do for raising revenue. A stormwater utility is one of those. And Cary just happens to be kind of unusual for our size that we have not elected to go that route yet. Um so, you're going to hear a lot of information that might help you decide, you know, maybe maybe we should consider more about going that route. Shri?
Thank you. Thanks, Dana. Hello, everyone. [clears throat] My name is Shri Vedachalam. I work for a company called Corvias Infrastructure Solutions, CIS. I'm going to use scary words. I am from DC and I'm here to help you.
[laughter]
I actually live in the DC area. So, thank you for allowing me to visit here.
And I'm thankful to our team Gradient, Sujit and Heath who brought us on this team. And just a little background about myself, I have a PhD in environmental science, a masters in environmental economics, and I've been working on the water sector for many years. Right now, I work for a company called Corvus Infrastructure Solutions. We manage several stormwater programs across the country. So, we have some experience. I wouldn't say we have set up every, you know, we haven't set up many utilities. We've helped one community in particular, but we have some experience managing and the operations. So, we understand the challenges, the needs of Cary, communities in North Carolina in general, nationally, very similar picture. You're you're dealing with water quality challenges and water quantity challenges. So, there's flooding issues, there's river and stream restoration issues. So, in this particular project, we
[clears throat]
I I'm just going to give you an overview of what we did. We looked at the charge to us was to look at the current analysis of the program, where Cary stands today, and benchmark it against peer communities around in in the region, do staffing analysis to understand the costs, how much staff currently are on roll, what's the expenses associated with that, and then figure out a plan for financing, you know, future development programs that includes understanding the revenue, where is it coming from, what are the different ways to finance, modeling some costs, and looking at funding, you know, options. What can alleviate some of those costs? And I'll I'll walk through So, we're focusing this presentation mostly on the financing, but I wanted to give you a little bit an overview, and I'll I'll walk through just quick slide highlights. So, [clears throat] when we did the benchmarking, we talked to the town of Cary stormwater department. We looked at the you know, the documents from before, and one thing that kind of stood out, obviously, you know, the basic stats about the population, the budget, we looked at averages from
the last 4 years, and so that came out to about $4.3 million per year. So, that's an important number, which was then useful in planning other numbers. Right now, the funding model is that we carry gets allocates money from the general fund for the stormwater department. There is no dedicated fee, which is useful to understand because that's one of the key distinctions in some of the other cities that have a utility and then a dedicated fee associated with that. And then the key insight from that is when you when you have a dedicated fee, you're able to plan around. Without that, you're kind of going year by year, so it does help current needs, this year's needs, but you're not proactively able to plan what's coming 2 years, 5 years. So, that's just an important insight. We looked at three different communities for this peer benchmarking. One is the city of Charlottesville in Virginia. It is a smaller city, university town. They do have a utility and a fee associated with that. It's been going on for about 10 years now. And their annual budget is much smaller. They do have a bond-funded CIP program. And you know, they they did consider some rate increase, did not go through. So, that's a typical process for a utility like that. The city of Knoxville is probably more comparable to Cary. Its population is pretty close. They have a general fund plus grants. They are exploring the idea of a dedicated fee with a utility structure, but right now they don't have anything like that. And the other community we looked at is the is Prince George's County. It is a much larger community. It's about a million million people. It is a county system, so again, completely different setup. The reason that was sort of interesting. So, we helped manage that program for the county. So, we have some experience understanding the ins and outs. It is a much larger program, also because it is a public-private partnership, where we do
a lot of the execution, and so the county is able to scale up. So, they have done a lot of projects. It is one of the largest communities in the country that is green only. So, they only did green infrastructure, eliminated big pipes, and focused only on managing through natural means. Um so, so that's a unique element. That's not always applicable to every community, but we can take some highlights and maybe some of it is useful.
Quick question.
Yes.
Can you define CIP for me?
Um capital improvement program. Um so, that's, you know, list of all the capital needs, and you plan for that. And and we'll get into some of that.
Thank you.
Um so, some of the key lessons from uh this benchmarking study is that dedicated funding does provide financial stability. So, they're able to plan what's coming, and especially with already unpredictable flooding and rain situation, you want to have some stability, some predictability, and these are the projects that we have already planned or we want to do in the next 5 years, and then needs happen, and then you kind of shift resources. Uh that also allows you to have a capital strategy. Where is the money coming from? Some of it comes from revenue, some of it comes from a bond issuance, some of it comes from um you know, loans from the state revolving fund. So, having that capital strategy also allows you to plan, predict, and contain some of the costs, you know, debt servicing costs, interest rates, all of that. Um and having that structure also allows you to set up and measure performance. So, what is how many how many service calls were answered? What is the frequency? How many projects start design to construction? How long was it? And so, once you're [clears throat] able to track those, then you can drive accountability and say, "We improved our performance over time." And all of those things give you predictability, and that's useful, that's important for a public institution where you don't want these fluctuations on many, many different conditions. You have public uh you have the interest rates, you have general, mean, you know, war, inflation,
all of these things are happening. Um and and the last one is, you know, this big program where we looked at Prince George's County. They have the small uh called the community-based partnership, and that allows you to scale the project, so do things at a much bigger scale. So, those were sort of some key highlights and we embedded, incorporated some of that in a finding in a in a report that will be submitted to the town. Now, why establish dedicated stormwater funding? I walked through some of the reasons, and then in summary you have stable, predictable revenue stream, and that allows you to plan for the future. It allows you access to revenues like the, you know, bonds and SRF loans. There is a way you can, by setting up a fee, you can assess where is the cost coming from? Who is bringing most of the stormwater? So, Dana mentioned [laughter] all of the stormwater comes in. You have pervious surfaces and impervious surfaces. So, pervious is all the lawns and yards and fields, and the impervious is all the concrete, asphalt. So, the more of those impervious surfaces that you have, that's all coming on to your public right-of-ways, your streams and ponds. How do you assess the cost of that? Trying to find some some sort of connection, association between those two, that is possible with this fee structure. And then, based on that, you can, you know, it's not always needed, but sometimes you might be able to give certain incentives, certain credits back to your residents by saying, "If you convert some of your impervious to pervious, you take out your lawn, take take out your driveway and and put a put a lawn there, or part of it, you know, or if you have downspouts that connect to a sort of a holding or a storage, then you get some incentives." You're able to, you know, set up those things, and that gives a credit or incentive to to residents. So, so that's possible. Now, setting up a utility is not new, not in the country, not in North Carolina. There are about 100 stormwater utilities right here in the state of North Carolina.
[snorts]
It has to go through a certain process, but once you meet those conditions, it is quite possible. So, this is not breaking ground if you were to decide to do that. And Hope will walk us through some of the statistics and some details from the state that are pretty relevant.
Shri.
Yeah, hi everyone. I'm Hope Thompson. I'm a senior project director from the School of Government Environmental Finance Center. And yeah, love to share with you some of the North Carolina and local context around stormwater fees. So these are dedicated stormwater fees, stormwater utilities. So we do at the EFC, we say EFC for short cuz Environmental Finance Center is mouthful. Um at the EFC we collect information about water rates, wastewater rates, and stormwater rates across the state at a annual or every other year basis. So this is from our 2025 fee survey. We'll be doing it again next summer. Um 109 local government utilities responded to the the survey. Um and we just highlighted, you know, Durham just as a kind of central point. It's also where I live, so I just was biased, I guess. Um and you can see there's a there's a good distribution across the state. We're not showing size here, but we have a good distribution of size as well. We have everyone from Charlotte and Raleigh, Greensboro, to some of our much smaller towns. So everyone is addressing stormwater um in some way likely in their town. These are the folks who are doing it through a dedicated utility fee and through that enterprise fund. Um it is kept separate, those revenues. We just dialed it into Wake County just for comparison, just your closest neighbors. I mean, all of this comes from our stormwater dashboard, which is free and open to use. So if you want to check out the data for yourself, you're welcome to. You can use other comparison groups, things of that nature. Um and I know these bars are really light at least on my screen, but just that list is going from left to right. So Raleigh all the way on the end. And what this is showing is the residential monthly bill at 4,000 ft of um square feet of
impervious surface. So it's related to um the amount of that impervious area that Shri was talking about. The median in Wake County is about $6 $6.75. The median at that same impervious square footage across the state is about $5.22. So, everyone is doing this a little bit differently. Um everyone has different sizes of their stormwater program, so they might not have all of those things that Dana listed. Um they might not have those same requirements. So, just that's a bit of context to keep in mind when comparing especially residential bills is that they don't always lead to the same revenues. Um and I think that's I think that's it for me, and then I'll leapfrog it back to Shree.
Yeah. So, we'll switch back and forth between Hope and myself a little bit just to give you a North Carolina perspective, the statewide, and then back to Cary. And and that'll hopefully give you a little more context as I'm talking. So, we'll we'll dive into some Um uh so, we did a parcel analysis, and we'll be diving into some of the key metrics from there. This is specific to Cary. We uh are fortunate in Cary we have good GIS data. So, thank you for investing in that because not not every city or town has that. And that really forms the backbone of this entire analysis. It's all resting on having access to good data, good quality data. Um so, right now in our model, we we take in all this data, and then I'll I'll talk about what what the model does. Um we we have about 59,000 total parcels that are analyzed, of which more than 50,000 are billable. So, some of them are, you know, government properties, things like that, not billable customers. Um we I'm going to introduce a concept called equivalent residential units, ERUs. And and we'll use this term, so write it down if you need to. Uh and this is an important concept in stormwater management, so lots of utilities use that term. Um and and that's essentially you're creating one unit. So, it's it's essentially a unit, like a dollar, it's like a currency in the stormwater
management world. And I'll tell you where that comes from. So, you can think of it as the median residential size. In Cary, it's about a little more than 4,000 square feet. Typically, in other communities, you would see that number anywhere from 2,500 to 3,500. Very common, it always goes outside of those bounds. Now, the number in Cary is higher because it's a primarily residential suburban community. So, you have a larger lots, single-family homes, and so that number tends to go bigger. But, if you go to Raleigh or Durham or other cities that have core downtown urban cores where you have lots of apartment buildings and complexes, that number will be much smaller. So, that's the reason for that difference. Uh but, it's fairly typical of suburban communities that are heavily residential that you get a slightly higher number than that. So, now you can use that information to decide your ERU. And that ERU is something that we self-select. So, we can, you know, it's a model. It's a model is an approximation. So, when I say model, and if it gives some results, that is not coming from the heavens. It is created by us. It's easily changeable. And those numbers are based on what information we have as of now. The numbers will change based on new information, and they can also be changed by input from all of you. So, for this specific modeling exercise, we used 4,000 square feet as our basis for that. So, that's the ERU number that we're going to use in the future in in every exercise. And then we did a breakdown of, you know, how many residential units, how many commercial, apartment, industrial. And those are different kinds of places. So, residential units going to be different. Residential customers, you know, different their income, their means are different. Their the the the stormwater that's coming out is going to be different. Commercial establishments, much larger properties. So, you know, we we wanted to separate them. And when you look at the when you look at the breakdown in terms of the number
of parcels, a vast majority of the parcels are residential units. But, in terms of the ERU, the residential percentage drops down to 60%, which means the commercial properties, each individual property is much bigger, much larger. So, there is some distinction that that means that there is some distinction that we need to create between residential and commercial so that they are equitably, fairly priced. Um and and that's a that's one of the principles in in pricing is, you know, you you be fair to each customer and [clears throat] not overcharge them more than what they're contributing. So, um Um I'll walk through Now, we we use this information in our financial analysis tool. The tool is a simple Excel-based tool. It's meant to be um having some inputs and then you set some scenarios up and then you run an analysis, it gives you some outputs. What the what the tool does is is meant to be a decision support tool. So, it's meant to help you Ultimately, it is not making any decision. Um I know with with AI, a lot of things are like somebody's making the decision, it's out of our hands. Everything is in our hands, we control the numbers. It's meant to be forward-looking, so it's meant to plan for the next year. It adds up all the costs, so you you look at all the inputs. We have the the number of parcels, we have the year use, we use global information like what's the inflation, what's the discount rate, um and all of this can be modified. We we do have some industry standards, but at the same time you can modify these numbers. Uh we have capital projects that's coming from the town. So, we take that information, we look at the O&M costs again, the information that's coming from previous documents, staffing numbers, what's the cost, uh you know, total cost. If you have any debt service, what is the cost of servicing that debt? Um and then you have some modules that allows you to set up those scenarios and then spit out some results. And then it's iterative, so it allows you to go back and see did we meet some objectives? So, we need a
certain revenue, this is what we are getting. If you are having a shortfall, we need to increase the rate. If you're having a surplus, you can go down. So, so it's meant to be iterative in that. And and then it models certain scenarios. And and so, in totality, it is meant to reflect what the situation is in Cary at this time, but things will change and so, the model is receptive to that. You're able to input numbers based on new information or different information. These are the difference between sort of policy and politics. You You can You can say that I don't want rates to be this high even though your model is saying that, you can override that and say, "No, I want it to be this way." And And those are the kinds of decisions you can make. So, we looked at four funding scenarios. And And that is going in a spread from low revenue to high revenue. Again, these numbers, some of them have some basis, other numbers out of thin air. We just made them. So, you can change them. So, one is the minimum. The scenario A is the minimum funding. This is meeting the federal and state mandate. So, this is required. Carrie needs to spend this much, at least about this much, every year to make sure you're in good books. And that includes personnel costs, that includes O&M costs. It doesn't include any capital costs. So, you're just skating by, not doing any capital projects. Just maintaining what's already there. And it defers all capital investment tomorrow. That's tomorrow's problem. That's next year's problem, not today. And then we move to scenario B, which takes that minimum and then adds capital projects. So, personnel costs, O&M costs stay the same. We add about $4 million of capital. It addresses immediate needs and sustains the program. So, the program still keeps going. It may not anticipate It's not There's not too much buffer for large-scale programs or sudden needs,
but you're still able to take care if there's a sinkhole somewhere, you're able to repair some stormwater, you know, drainage system fails, you're able to fix those, you know. So, you're able to keep going on. And then we improve on that. And then we say, "Scenario C, we have We have more funding. We have more projects. We're able to provide more services to our residents." In that case, we say, "We need a little more staffing. Our O&M costs are we still same, but we are able to do bigger, more capital projects. So, now you have expanded those programs, and then we said, "Okay, let's take it one more step and then, you know, increase that." So, you can keep going, you can pick a number in the middle. So, some of those, as I said, are required useful benchmarking numbers. Others, you can pick a number and say, "I don't like 15, I want to be at 14." Yes, we can do that. So, those are those are easy to fix.
Can Can we just go back?
Yes.
And this is probably for Lisa. So, utility funds have to be spent on utilities.
Mhm.
General funds can be spent on anything.
If we have a storm water fund, can only be spent on storm water, I assume, but general funds can be spent on storm water.
Okay. Just making sure I understand. Because that can impact that as well. Good points though with the similarities of the utility fund or enterprise fund for utilities. Thank you.
Help.
Do you want me to go?
Yeah, sure. Go ahead.
Yeah, and we were just about to get to that. Great.
Sorry.
[laughter]
So, Yeah, Shri kind of showed you different funding options. We often call them revenue targets to accomplish whatever your department or program's goals are, right? But there's many ways to get to that number. Lots of ways to do the math. Um one is to use general fund revenues. I was going to start in that corner, but I'll start in this corner. So, you can, you know, allocate general fund revenues, those are property tax revenues or other sorts of revenues in your general fund to your storm water department. That's what you all are currently doing. That's not the That's not within your enterprise fund. It's not a dedicated fee source. You all know that. Um and then you can have these dedicated fee sources, and these are um
you know, a separate rate, a separate charge that is um on those customers, and you can do it in a couple of different ways. The simplest way to do it is through a flat fee. Everyone gets charged the same. That's this bottom corner. Um same for all parcels regardless of size, regardless of impervious area. It's simple to administer cuz it's the same for everyone, but it's not tied to that general generation of storm water that Shri was talking about. Um you'll see in the next slide how many people use that because of the simplicity. I will note that uh Fayetteville has started with the flat fee, but they are moving to a more advanced fee now that they've kind of established that fee structure. As we kind of move up, you can also charge based on that equivalent residential unit. So, you can say in our, you know, area we're using 4,000 ft as the square feet as the divider. We're going to divide your impervious area by that amount and then assess the charge as that what using that as a multiplier. And then you can kind of use this hybrid structure where you're saying um that non-residential is by the actual ERUs and then residential goes into kind of buckets of, you know, one to three ERUs is charged this much, three to five, etc. So, it's just kind of scaling the fee differently, but still tying it back to the uh make what it's what the stormwater is is being generated by that parcel itself. Um And in North Carolina, so going back to that survey that I talked about, uh we ask, "Well, how do you charge?" We don't just ask, "Do you charge?" but "How do you charge and how much?" And we also ask about type of customer because people do sometimes blend these strategies. So, in North Carolina, residential fees are mostly flat fees. Again, those are simple to administer. Um, but for multi-family residential and non-residential, those are my green and and pink bars here, those are more likely to be using the ERU-based structure. People often also ask, "Well, how do you get these revenues from people if it's
every single parcel or if it's based on something in like impervious surface?" It's not a service that they're turning on or off like with water. Um, and so there's different ways that you can do it. Some have more challenges than others, but most folks include it on the on the utility bill, so with their water and wastewater charges. You can also include it on the property tax bill, about 25% of the utilities that responded to our survey did it that way. Um, you can use other mechanisms. You can also issue a separate stormwater bill. There can just be issues with collections on those since again there's no service to turn on or off.
Can I ask a question about the different types of charging? I assume a lot of them do the flat fee because they don't have a robust GIS which makes it easier.
Yep.
Okay. And hope to on that point just to clarify. I assume if you are charging on a property tax bill, it's a lump sum annual regardless of how you've calculated it. Any utility bill is on some
Monthly
Monthly frequency or whatever billing frequency. Yes, but yes, it would be an annual added to the annual property tax bill. So you're not increasing the frequency of property tax bills. Yes.
And that that's also based on the cash flow. So if you need month-to-month that cash reserve or if you're willing to wait for the end of the year and then collect 3 months after.
Yeah. Yeah.
Any questions?
Can I Can I ask real quick if you know this offhand, what percentage of the municipalities that responded to the survey have their own water utility to bill through? Of that 25% I think you said that that bill through property tax bills
Mhm. [clears throat]
do they Is that a function of not having a water utility to to bill through?
That's a great question. I don't know that offhand. We haven't kind of mapped that. Could be challenging cuz people sometimes have a utility but don't do
their own billing and that's not immediately apparent to us through our surveys. Um but that that could certainly be why they're going with the property bill strategy in instead is they're they're not sending out utility bills or they
[clears throat]
have issues with their utility bills or something of that nature. So yeah, great point.
Okay.
Sure.
Back to Carrie. Back to the model. So now we have um we wanted to look at the monthly rate impact. So, that's what is going to concern most residents. How much am I going to pay under different scenarios? So, we looked at four scenarios, the minimum, the minimum plus capital, then a best case, and best case premium. And as you can see, because the total budget increases as you go from one scenario to the next, your average rate also goes up. So, let's take the minimum plus capital as some sort of a baseline that we agreed right now that's a good scenario where we are meeting all the requirements, we're also doing some capital improvement. And so, then we are looking at if you look at the ERU, we're looking at about $8 per month per resident, per property. Um not resident, per property. And um if you did a flat fee, that number would be a little bit higher. Um so, close to about $11. And um you can compare that with um neighboring communities. So, Durham is $23, Raleigh is $13. And And those are different programs, so their their budgets are different. Um you know, slightly larger cities. So, there there is some context to that, but the rates are lower and comparable, so they're not wildly out because Cary is not very different. I mean, you know, you have the same sort of needs. Um and And then um you can you can see even if you did the the ad valorem or the general fund, you know, it would go on the property tax and And that number would go up. So, it It's scaled proportional to what your size is. So, everything is based on what
is your target revenue, and then you sort of work backwards. Um and so, the rates will get adjusted. You don't want to keep switching them back and forth a lot um just to give customers and residents predictability to say, if it is going to be $10 a month, don't make it five and then 25 and then you know, so don't go back and forth, but some predictability that allows you to also communicate to the residents that this is what they should be expecting month to month or year to year um as the case may be. Finally, this is This is sort of the summary of the different models um and different structures. Oh, One principle that this relies on is is called one bite principles. These are industry standard principles that dictate how utilities are influenced. Dictate is probably too strong a word. Influence how utilities they recommend some principles and say if you were to set up a utility with the right structure, then follow these general good principles and that will help you maintain the viability of the utility and the operations and and provide some stability. And and that walks through certain conditions, right? Is the cost related to where the impact is coming from? Is the process simple to administer, to follow? Is it legally defensible? Is it providing you stability with the revenue? And then based on that we and these rankings are our subjective assessments. So when you say hi, we think it is high because there is the connection between in the ERU based structure, there's a connection between who's causing the storm water and then how much are they being charged? Whereas in a flat fee, that connection is a little bit off because you're charging everyone the same. So a townhouse is getting charged exactly the same as a large commercial property or a large ranch. And and and the ranch may be mostly, you know, yards and forests and everything. But whatever is there, you know, bigger property if they have a 7,000 square feet house or you know,
10,000 square feet, they are getting charged exactly the same. So so that is what we are looking at. And we gave them subjective rankings and then overall our assessment is we recommend ERU based or hybrid ERU system is optimal. [snorts] But at the same time, we see some benefit to the flat fee model, especially [snorts] if you are just starting, you don't know what the process is going to look like. So just getting started, getting residents familiar with the idea of a storm water fee, flat fee is helpful. Fayetteville is a good example. Start with that, get comfortable and then gradually move to a different system.
So, can I explore the regulatory part of that? So, utilities are regulated. We can only charge X amount, not 100% of cost.
You can do 100% cost recovery. You can't go over.
Right. I assume this is the same.
Mhm.
Okay.
Can I ask um if I'm I'm interpreting this
that do particularly due to our comprehensive of GIS information, you are recommending a hybrid ERU or ERU-based approach would be appropriate for Cary.
Yes.
What I'm hearing is we could consider something like beginning at a flat fee with an intention and probably we'd be able to to say this to residents, to to utility bill payers or taxpayers, that we plan to move through this sort of as a we'll start at a flat fee, we'll get the information together, let people know what their hybrid ERU cost may be, or what their ERU-based fees were going to be, so we could we could get our feet wet with a simpler method and move toward more towards an actual
Yes. The The only caveat that I would add is there should be some analysis done to understand if your flat fee So, last slide, let's let's go back to the last slide.
Um let's look at the any scenario. You
can see that the flat fee is higher than the minimum the the ERU-based for the median property.
Yep.
Right? So, so that for a typical customer, as we said, one ERU. So, that is going to be, you know, as long as the difference is small, it is okay. But, if the difference becomes rather large, and it's more number of people who are on the low property size, and and that is going to cause some issues, and they are not going to be waiting. They will say, "I want that system right now, because I'm paying a lot more, and I don't want to." So, trying to figure out that balance to see how much is that impact would be useful analysis Um in making that decision. Especially because you have good GIS data. If you don't have that it's like I don't even know what you're going to be charged. So, how do I figure that out? Give me some time. There's lots of tools available now and and with you know light out tools that it's pretty easy to map out. I mean you've you've seen that with solar companies. I mean you tell them and they're like I know exactly what size your property is where the roof the cells should go because I know every thing is all mapped. So, there is a lot of information right now and you have it like within your access. So, that does allow you to go to ERU but flat fee is definitely one option.
So, is it fair to say since we're using general fund for these costs today we're essentially doing flat fee now.
Yes.
Uh so, when the residents go up in arms by reading a report that we're going to charge more money now and we're actually changing how we're going to bill you for what we're charging.
Yeah. Okay.
individual like me who lives in a smaller home on a lot with far less impervious surface actually will be saving money under those
Under the ERU system you would you would be saving.
that say has a very large home on a
Right. Or or commercial property, you know, like a warehouse for instance Amazon warehouse or some big storage yard which has a lot of impervious land both on the roof and the surface the
driving you know area. All of that would then be charged at much higher when you do the ERU calculation.
But for multi-family it would because we have typically vertically stacked residential they're not going to pay a disproportionately out sized fee. Okay.
Yeah. So, from a fairness perspective we think the ERU is is quite up there in giving you exactly what the problem you know they're causing. So, you know multi-family housing the problem is divided because you have multiple stack structures or you know roof that's combined and all of that coming into a small area. So so that certainly helps.
Okay, thank you.
And we are pretty close to the end. So I have one last slide when you know, it's a summary of what we think are options to consider. Um one is to establish a dedicated stormwater fee, again based on statute. This is possible, it's been done, not new. There are lots of utilities around in the state in this region. Um and then figuring out the billing. So there the logistical hurdles are what are challenging. Communicating, figuring out the optimal rate, what is the rate structure? And these are um there are some policy political decisions as we call them. I mean, you know, you decide based on what is feasible, what is acceptable, what's most likely um what where do we want to land on that spectrum. But typically, the process is fairly well understood. Uh we again suggest considering ERU based or hybrid ERU, but flat fee is certainly a model. The ad valorem is what we already have. So so there is a general experience with all of those models that you can easily explain. Um the ERU threshold uh could be set at 4,000 square feet, but again, it's like a slider. You could go up or down and then see what the impact is on on the median customer. Um and then starting at the minimum plus capital scenario, which is that second scenario, but then you can always ramp up or ramp down a little bit and say,
instead of 4 million, we want to do a 3 million or 5 million. So you know, again, it's like a slider scale that you can go back and forth. Um and then refine a 5 to 10-year stormwater capital improvement plan. And that really helps you map out what are the projects that we want to undertake this year, next year, in 5 years, in 10 years. And so that gives you a roadmap for where things should be. And based on existing or changing needs, based on funding scenarios, suddenly a new program at the federal government opens up and says, we want to fund stormwater improvement, we want to reduce uh you know, disaster prevention, flood mitigation. There might be some money available. So, you could then advance some of the projects because now you have a list and that pre-planning has been done. And that allows you to also advocate for, you know, this is the, you know, federal program that I'm going to apply for. Um, what are the different outcomes? How do I map my work to the outcomes? I want to reduce flooding in this part of the town or I want to reduce flooding in this watershed or water quality needs to be improved in this. What are the different projects? Can we stack those projects together and measure the outcome so that way you can tell all of this resulted in better water quality, um, you know, you can fish, you can swim, whatever it is. Whatever outcomes that you define, you're able to meet those outcomes. And and that is possible with that kind of a refinement of that CIP plan. With that, I think that was my last one.
question.
Yes.
You're suggesting ERU or hybrid ERU rate structure. And that's specific to um, research or study that you have done for Cary.
Mhm.
And um, based on how Cary is um, set up, I mean, have you taken all all those things into account?
Yep. We got We got GIS data from the town and we were able to incorporate all of the Cary specific information that went into the model. Now, typically if you're starting at a community, they wouldn't have access to that data and so
then you're kind of flying a little blind so you have some information from the tax assessment, real estate office and they would say, you know, this is ad medium. So, it's not just the size of the property, but it's also the valuation, right? So, that, you know, also tells you, you know, is ad valorem, you know, how much revenue you're getting right now, how much revenue you could be getting in this model. So, it's the confluence of all this data that's already there that is really helpful. And so, that's what sets you up. You So, you're already, I would say, two steps out of 10 already reached there because, you know, there's this baseline of strong foundation and based on that, you can run a model that that's closely approximate. I mean, every model is not going to be accurate. It It's It's a reasonable representation of reality, uh but it can never be the reality. So, you know, it it gets you close.
So, let me uh repeat like um just to confirm my understanding of the ERU model that the bigger the lot is, the more money that you pay.
In general, uh that is true. The bigger the If If you were to tie the rate to the causation of the problem, then bigger the lot is, the more fee that they would be assessed at.
So, could you explain me that like the whole like for people who are watching, like when you say the lot is bigger and you're causing the problem, but that is a requirement set by the town that you can only build this much area. So, it's really not their their the residents are not it's not their decision for that they can only build this much and they keep the certain area for impervious or pervious, right?
[clears throat]
could you explain that?
One One analogy, let me give you an analogy. So, um in in in the drinking water world, um more water you consume, typically Now, again, there are lots of different ways you can set rates even in drinking water, but one of the most common ways is the more water you consume, the more your bill is because it's based on
volume. So, you do a volumetric pricing. You say first thousand for first 4,000 um gallons is a certain block rate, and then after that every, you know, thousand or 4,000, you know, you it keeps scaling up. So, the more you consume, the more you pay. So, same principle applied to storm water. So, you have a lot. Part of it is, you know, your yard and, you know, grass and trees and gardens and all that, but rest of it is your solid, you know, your roof, your structure, your um parking, you know, all of that. Now, any water that falls on that structure is going to run like what we call runoff. It will basically run into um if it's if it's large enough your property is really large then it gets absorbed there. But in most cases it is going to flow into public right-of-ways. So, your drainage ditches, you know, right along the road. And that all of that collectively adds up eventually when there is a big storm that adds up and pulls somewhere. Every neighborhood has a place where there is bonding every time it rains. And so, we are trying to eliminate that problem or reduce that problem by figuring out how can we charge the residents for the storm water that's coming out of their lot. Now, eventually the goal is either you're collecting the appropriate revenue to fix and, you know, manage this problem. And or the residents with large lots look at this and say, "How can I reduce my impact? What changes can I make to my property that will reduce my fee and also helps the town?" So, they might say at the property [snorts] line I decide to do, you know, dig a small pond that collects some of the water. Or I'm going to take out this driveway and install, you know, so there are different versions. Compacted dirt that has a different absorb absorption and that might be modeled differently. And so, I might just take out some concrete or asphalt and then turn it into, you know,
a natural feature. And that might reduce their impact, that might reduce their bill. So, this is also meant to drive the It's an incentive to drive good behavior and that eventually helps the town. So, two different ways of looking at it.
Can I confirm something to make sure I I think I understand it a little bit differently than what your question was. The the ERU, that 4,000 average square feet, that's not the size of the lot. That's the amount of impervious sur- surface.
surface.
Regardless of whether it's a quarter of an acre or an acre lot, you so you would pay based off of how much patio, driveway, and roof you have.
Yeah, we are only looking at impervious.
You would not pay
for having a large lot. No. You're right. No, it's not it's not looking at the lot itself. It's only looking at what is the impervious surface. The built the built space. But but it wouldn't be like would my deck be impervious surface? Cuz I could tell you right now it's very It's not. It's very pervious. It's very pervious.
[laughter]
Things are growing up out of it. Um that was one of my questions. That's a good question. I don't know. I hope you have a don't know. That would fall under Carrie's standards. And I know that deck is not impervious. All right. Well, we can ask our We have some other experts in the back of the room, but the legislature is also in the business of defining pervious and impervious surface. So, but it's a great question. Sometimes decks are and sometimes they're not. Yes, we would basically we would set up the whole system based on the the LDO and the regulations that are in place. And as Lisa said, they can change over time. So, what what is established today might not be what's there in 10 years. But generally speaking, you know what's pervious and what's impervious. Generally speaking, it's your driveways, it's your roof, it's your patios, and
not pools, and not decks. So, just giving some examples of things that are Thank you. And I have one more follow-up question to what the mayor asked. Um so, we are not going to be reserving funds from general funds. And if we were to start this fees, we would this would be a dedicated fees for storm water. But we are not reducing the taxes to to compensate this. We the taxes stay same. This is going to be an additional fees. There's a set amount of money we collect. And right now it's essentially a flat fee. We're going to move that or we can move part of that. That's the slider he was talking about. You could do so much in general fund and so much with storm water fund or all in storm water fund or all in general fund. Uh but this allows you with the storm water fee to do that. And so you shouldn't be paying more unless we go to the impervious surface and we decide to do that and I have more impervious surfaces than whatever the average is, then I might pay more.
Mhm.
Does that make sense?
Yeah.
Okay.
Somebody like me with a much smaller home and a lot more yard would end up paying a little bit less.
Less, yeah.
Not I mean we're talking about not a huge chunk of money. I'm not going to go on vacation with the savings, but you know, it it does feel a little bit fair, but I want to make sure
There's your coffee.
Yep, right? It's a It's It's a cup of coffee every month. We would be allowed to still spend if we had a large capital project or something we really wanted to do, we could spend out of the general fund, right?
Always spend general fund on anything. So,
Okay.
And I also want to add that you did mention that, you know, in case if there's a storm, I I I've heard this scenario before that we can take the money from reserve. So, I just don't think we're going to change that part of the policy, right?
Well, or create reserves through this funding source.
Yeah, so if you were to do a utility, you might have um a separate policy related to the reserves that you have for the um storm water utility. And of course, you do have reserves in your general fund um that is for, you know, extreme weather uh things.
of today, um we we produce if suppose there's a hurricane today and we have to use the the you know, we we have to go in in emergency mode, we take that money from the reserves and we're just going to separate the state and church.
Yep, absolutely.
I have a couple of questions and comments. I've got I've got a whole list, but I'll try to keep it short and sweet. I actually would really like to see rates charged by other the other Wake County municipalities. Um there's a there obviously there's a big variation. Um and not all stormwater programs are created equal. For example, I'd really like to know what Raleigh's stormwater program includes to justify that 20 plus per month fee as opposed to say the 13 that Durham is charging and what I'm assuming is significantly less than a couple of other municipalities. I'm really curious as to what kind of stormwater program um what kind of approach those ranges of dollars would help us do. I know there's we While I'm very very interested in diversifying our revenue sources, which this is it's transparent. It's exactly, you know, one of the goals with diversifying where we can. We have very limited options when it comes to diversifying how we get our revenue, but I also want to know what those dollars what when we're considering, you know, how much we Let's say we want to say we You know what? We want to keep it under 15 or just a random number. Um what can that buy us? Because while I want to build the best program possible and then figure out what that would cost us, I think we probably have an uh uh ceiling. I think we all can probably come up with a number that
feels like a ceiling and then understand what can we build for that um to make sure that this is worth it. I I believe with all my heart this is worth it. I'm 99% sure it's worth it. I just want to make sure to do the the due diligence and ensure that we're not going to end up just creating a lot of work for a $5 million budget and we have exactly, you know, the same outcome um and we we've used up a lot of resources to get there. Does that make sense?
Yes.
Yeah.
Would you like me to try to address some of the things?
take a stab at that?
Take a stab at that. Uh the first thing um I'll try to start from the beginning. Uh I think it would be hard to go to all kinds of other municipalities and say, "What do you do that I think we want to do?" Um that's because some of the base stuff that that each municipality does is different based on the size community that they are. And so so Raleigh has a base thing that is different than Cary's. And even a community that is similar in size to Cary might have different base things that they are required to do through NPDES. Okay, so that's the first thing that makes that very challenging to try to pick and choose things.
So the NP NP DES
DES is quite prescriptive.
Um, it is uh prescriptive to each municipality. Meaning they want you to achieve certain objectives and they have a certain programs that they like you to do to help achieve those um objectives, but how you do it is where you start to get into negotiation and discussion with them.
Dana, do you want to talk about how Raleigh and Durham are phase one versus phase two? They have more responsibility.
Yes, so they they because of their population, they are what is called a phase one NPDES phase one community. And um the phase one communities have more
obligations than the phase two communities. You may have heard us talk about there was some things that you know, maybe they're going to make some other communities go into the phase one. That is not actually happening, so we're happy about that um because we have excellent programs as it is right now. And um and so we're always looking to make sure that the programs that we run match the needs of our community. And um so I I think I'm going to try to go to the second part of what you talked about, which was um I really liked how Shri talked about the outcomes that you want to achieve. I think it's a much um it's a it's a very desirable approach to say, I would like to incent people to convert things to natural. Or I would like to improve the quality of Swift Creek. Uh you know, like so when you kind of focus on those things, it helps us narrow in on what types of um projects and programs. And um in fact, we can provide you with more information of some of the things right now uh because we've got um we'll give you some information about the Walnut Creek. We've got various grants that we're starting to get into implementing that uh were from the federal government. Well, if you put in um uh you know, let's say 5 years from now you want to put more investment into it, we can kind of give you some indication of what that might um achieve. And the federal grants, to be clear, are for stabilization. If you go out and walk certain portions of Walnut Creek, basically there's 3 miles from the downtown park all the way to where it leaves Cary at I-40, um there are portions of it that have extremely high uh erosion things. And so, it's stabilizing portions of Walnut
So, if we as a council said, we would like to reduce runoff, turbidity, and erosion and in addition to flooding, then that would give you sort of the information which I which I do.
Yes.
That is one of my life's goals is to be a part of that. But if so, that would sort of reverse engineer the budget then.
It would help us, yes. So, it's almost like deciding the destiny that you want to have.
Yes, if I could just jump in since I I'm such a similar train of thought, could we advance to the slide that shows us the um the different levels, you know, the the basic level and then um going all the way up to premium. Yes. So, this one. Yes, so I think this is essentially what we're saying is understanding what these different scenarios uh translate to into infrastructure capital projects helps us uh I I think would know what the appropriate investment is. Cuz I think, you know, in a hypothetical community that has no capital needs at all, the the fee wouldn't make as much sense because it's it's, you know, kind of six of one, and a dozen of another if it's coming from general fund or if it's coming from the dedicated fee.
[snorts]
Seems to me the real virtue of the stormwater utility is the capital planning because it gets you above and beyond what the basic scenario is. Am I understanding that correctly? Okay.
right. And we short-circuited. So, I we started with that number like 15, 11. Before that is the outcome. You can start with the outcome. You can say, "I want to improve Swift Creek to this quality. What is needed to make that happen?" Dana will have a list of 7, 10, 15 projects. What does that add up to year to year? 27, 28, 29. And then based on that you get a number. You can run that number to say, "Okay, now what does that look like?"
And you know what the horizon is to get it done.
Cuz Dana, I think it's safe to assume that we would have a list of these kinds of projects that we would like to implement if we had the funding that we might not otherwise have the room in the budget to implement if it were just coming from general fund.
Correct. We've had years that have been
the capital has been well above 4 million and we've had years that it's been below. Generally speaking, the well above is because there is like a major project that just has to be done. And then the ones that are below are things that where it's like, "Okay, well if we defer another year, it'll be fine. We can invest the money in other capital, you know." Because this as it currently is being from the general fund, you can imagine the capital for for stormwater is competing with the capital needs of police and fire. So, the new fire stations. It's competing with the capital needs of housing. So, there's a lot of different capital needs and and every every year that's part of what the directors do is kind of
Okay, I'm going to need up that
Take us on a real tangent here. Another little hypothetical. You know, in in just thinking about the ways that a local government funds itself, in a different state, in a different scenario, you could perhaps have a fee to fund every single one of those departments, correct, right? I mean, in in some kind of magical thinking, you could have your police department fee. But in in in North Carolina, we have only so many authorities, and this happens to be one of them. And so, that is why we would avail ourselves of this kind of fee to offset these kinds of expenses from general fund that we wouldn't be able to do in other scenarios.
Well put.
But I would add, in essence, for your different level scenarios, you're kind of getting into what service standard do you want to set for yourself? Um it could be age of pipe that you're You could set other standards by which you're approving capital projects from a maintenance standpoint. How proactive do you want to be with maintenance, or reactive do you want to be with maintenance? Um getting ahead in projects, or you know, just meeting the minimum standard of projects. So, I I think we could also frame it and think of it in terms of, again, service standard for what fee you
want for the service.
And and the baseline can also change. Just remember that. I mean, those are federal regulations. At some point, they can become more aggressive, and, you know, require you to service at a higher standard, in which case you are then increasing your scenario A a much higher level. And so, you know, that that can result in certain changes. And that's how many communities were under threat of lawsuit or consent decree is when they started taking aggressive action. Uh whether it's gray infrastructure or green. Uh in fact, Prince George's County, the the model that I mentioned, is a direct result of a consent decree. So, there was a legal lawsuit, and and they All parties agreed, "We will work on this. Give us a few years." And then, that was part of the process where they did that. New York City, Philadelphia, you know, all major cities came up with different programs. So, so, that could also evolve into a new uh situation down the lines. We don't know that. So, I'm just saying that those are, you know, the possibilities. So, you kind of planning for the next 5 10 years, that's why it's helpful, is then it gives you that full picture of what are the different things that can happen.
Excellent.
So, uh Dana, I have a recall a report that you presented earlier this year uh because of the stormwater projects capital investment in Cary, we have reduced the residential like flooding insurance by 15%. Is that the the achievement we already got?
Mhm.
Yes.
So, this is the plan for the future. Maybe more flooding insurance will be reduced, which is a benefit for the residents.
that possible? That'd be great.
The all the different uh so, all the programs that we undertake um contribute to sort of a rating. Um it's actually called a community rating.
System.
System. And um and so, our rating our initial rating right into the gate um when they measured everything was the 15% off. And uh the more different programs that we do, so we would probably
um if you were to say, "We'd like to explore what some of the outcomes might be." We we would take into account, for instance, the community rating system. And um we would say, "We might want to consider this type of a program for this type of an outcome. And it could have this benefit to these individuals." And so, there's there's just different ways you can take a look at where you want to go with a program.
And in the federal grant last time like Congresswoman Deborah Ross brought us like $1 million. So, it it that's uh have a time limit. We need to spend it to the Walnut Creek.
Um we're going to bring you some We've got some stuff I want to just um give you some information about that. It's about 3 million total. Um there was a portion of which what was I think a couple years ago, but it's taken us a long time to work through the system. And that one is ready to go. And then the next one um uh you know, I mean it's it's it's a good amount of money. So, 3 million approximately total. Um it just comes with various things that are required to be able to work through the federal system. And um and so we will have more information on what that'll be spent on, etc. It's very specific to Walnut Creek stabilization.
Okay, does that mean if we a good project plan for storm water, that means the federal might give us more funding or grant to like that?
Uh there are probably um there are probably other funding pots from the federal government and our state that we might be able to avail ourselves of.
So it's a a good opportunity for us to find more funding resources.
Yes, it's like CDBG if we do a good job with it, we get more of it.
[laughter]
Um probably the better correlation is we do a good job, we we our citizens get paid less.
Or get to pay less on their insurance.
there could be things that yes, if we do
a good job, we we get more of it.
Thank you.
So I'm going to change gears a little bit and go back to what Shari said earlier, which I totally agree with him. You don't want to be changing these fees. You want them to be stable, which brings me to step one. Is it better to go flat or with the hybrid or with something else? Is there a and I know there's a lot of variables in this equation, you can't really answer it, but I'm going to ask it anyway. Has history or evidence shown that it's better to start with flat, which I think is what you said earlier? It said there's less change than if you started with something else and then you would have a drastic change as you adjust. Am I making sense? I feel like I'm lost.
Yes, I agree. Hope you have some experience with [clears throat] municipalities here. I don't know if there's anything to share.
I don't I don't have anything about the you know, people's reaction to changing. Um I think mostly the the the flat to ERU is driven by we know we need to start bringing in storm water revenues. The simplest way to do that administratively for most places is through a flat fee. Um
And and that that itself, if we're doing what we're doing today, would be easy. But when you start adding in we want to do all these things, now you've just changed that flat fee, and it's gone up, and you moved it. So, you're basically doing two things at the same time, and that's what worries [clears throat] me. So
Well, one one thing I'll say is as long as residents get to see the value
Yeah.
I think they are going to be much more forgiving. So, I work in water, and I couldn't tell you if the phosphorus levels went up, you know, 5 mg per liter, but I can tell if the street is flooded. So, that's that's your indicator. As long as the incidences of flooding, you know, regular flooding, it's a half an inch, quarter inch rain, and the street floods up because the inlets are fully clogged. I'm I'm hoping that's not happening, but you know, in
many cities, [snorts] that's pretty common. I mean, it I'm not describing a far out there situation. So, if you can reduce those scenarios, and there is a big storm. So, I'll give you one example. We worked in a city right outside Philadelphia. It's a small town. And and there we set up the utility, and flooding was the big issue. Water quality is an issue everywhere, but flooding was the big issue. And so, when we started eliminating those problems, the the inlets started getting cleaned, and then what was big getting clogged, and the streets were filling up, you know, houses were getting backed up. When that problem started disappearing, literally in front of their eyes, that's when everyone felt like, yes, I'm getting value for the dollars that I'm paying, and then that's worth it. I mean, people are willing to pay. I mean, a phone that folds, yeah, I'm willing to pay a couple thousand dollars, right? So, people are willing to pay certain value for getting the services that are really meaningful to them. So, I think that's the that's the connection that we want to establish with with the residents and the community is whatever rate structure, one, you are not getting ripped off, right? You're not paying way beyond what problem you are creating, right? The stormwater that's coming from your property is causing a certain issue and it's it's resulting in us spending some money even, right? You're paying for that and you're getting to see the results and I think that's the value that we, you know, hopefully if they can see that. Um so I would given Cary's advanced, you know, data with the GIS, I would recommend starting with uh the tiered ERU or the ERU structure because I think you are in a better position than most other communities who are just starting and figuring their, you know, they're getting their feet wet and just starting to figure that out. You have a sort of a head start, but at the same time I mean that's that's that's this collective decision of this room. Uh but in either scenario, I think you are able to as long as you're able to communicate that value. Um so figuring that out, the logistics of the process, can people, um
you know, so you have you you we've established a certain if you do a ERU, then we have to assess how much impervious surface that each you know, property is. Is there going to be a conflict? Somebody is going to say, "It's actually not that much, it's less because this is not this is, you know." So as long as there's an easy mechanism, redressal mechanism, people say, "Yes, I contested. It was being fair. What what whatever was adjudicated, I agree." If that process can be established, I think I think people will really see the value.
When it's clear and I was going to add it's a reminder that you're not making that decision. So
We're not [clears throat] making the decision.
I was getting there. As a follow-up, as staff tries to prepare us to get to where we're going, do you want do should we try to find our ultimate goals or end goals before we establish the ERU rate? So do everything and roll it out there or do the ER rate where it based on where we are now and then adjust it?
What I would suggest, what my brain is going to here is regardless of whether you were to pick, um you know, a flat rate or um um a tiered ERU, there is a certain legal and financial structuring that we have to go through. So, there's a certain amount of time that we have to make sure that we've met the obligations as well as we've set up our financial system to accommodate it. And as you know, we're in the middle of a trying to get to a new financial system for our utility billing as it is. So, those are the kind of things that I would suggest that would be that we'd be able to provide you more information on is maybe how much time to get through sort of the legal part of things. How much time to get through the financial restructuring. How much time do we think it would require to do an appropriate amount of communication and or engagement in our community. And
and I think that when you start to do that, then you can keep collecting more and more information which helps you make the best decisions on is it 4,000 square feet or not 4,000, you know, because you're continuing to gain more and more information and get closer and closer to you know, sort of how long it might take you to get to where you might want to go.
Two weeks. I'm sorry, Dana.
No, that's okay. And part of it could be a visioning. What what outcomes might you like to do? So, those are the kind of things we can structure for you.
Okay.
And I was going to add including it's kind of you you'd hit it early and it's also your last slide is looking forward to we still feel this as part of the storm water master plan implementation. You're still looking at next year and into next summer before any decisions really need need to be made. As part of a comprehensive storm water program that includes fees or not.
It's a good start. Thank you for the presentation.
a couple of questions. I I got impatient and googled
[laughter]
and I'm wanting you to verify that NPDES is national pollutant discharge elimination system. That's a part of the um US EPA.
Yep. Which is another acronym.
EPA.
I'm like I just defined an acronym just use another one. Okay, but you said that they have different I don't remember if you said expectations or requirements for each municipality. And I you mentioned about it being based on what phase you were in.
Yep.
But there seemed like there might be differences beyond that. Like what's different about other than things that we understand like size of the municipality. What kinds of things would our requirements or whatever be different in Cary versus anywhere else?
So can I walk one step back? TMDL I'll give you another acronym TMDL. Total maximum daily load. Sorry sorry to load you with that.
But that's that's sort of the precursor
to this assessment is EPA did a whole bunch of these are watershed scale analysis. So you look at the Mid-Atlantic water basin and then you become smaller and smaller and then you go okay. But so you allocate the pollutant loads
Mhm.
and say this much phosphorus, this much nitrogen, this much total sediment is coming into the watershed. Where is it coming from? And then you go up up up and then you start allocating you are responsible for 10% of that. You're responsible for 5% of the 15%. So you start going and then within those watersheds are these communities. So one would be Cary, one would be Raleigh, Durham and other municipalities. And then you then then those numbers look very different. So the watershed that's closest to Cary will have a certain number, watershed closest to Raleigh will have another number. And then you say that is the problem that's coming from you. How do we fix that? And that's where the assessment then focuses on. And and so that's that's sort of the precursor which we kind of skipped. But just wanted to give you that context.
Thank you. So in the last year or so and I I know the numbers change slightly, but approximately 10% undeveloped land in Cary. Give or take.
Great.
Okay. So would it be safe to say that because we're so built out then we're contributing to a problem more than an area that isn't, possibly?
Um that's what's so interesting about it, because it really is um so you kind of think of it a very broadly on a very broad scale, and then it keeps narrowing down. But if you were to get down to Cary specific, for example, we have very little industry that is contributing significantly to um pollutants that traditionally come from industry. And so um so in that example, uh the phase one communities um typically have obligations that are very much associated with the fact that they have a lot more industry that is contributing
a certain type of problem. Does that Does that help?
Or the age Well, also said the age in which the community was developed.
Yes, absolutely.
is a newer community with newer subdivisions have had more regulation on them than an older community with older, you know, aged residential commercial development.
Yeah, and I think there's like Wilmington is similar size to Cary, but much more industrial, and so they have a bigger problem with the runoff coming from industrial sites than Cary would have. And if you think about the rural areas, they have different issues with farm fields and fertilizer runoff.
So they have They have more pervious surface, but they have different issues.
And when you say the age of the community, you don't mean because older structures are more challenging, you mean because
they are
You didn't have stormwater regulation prior to a certain date.
some areas, particularly inside Maynard here in Cary. Maynard is still okay.
So what is Cary's phase, cuz I heard a phase one, phase two. Was Cary phase two?
A phase two, okay.
Can I ask one more question? Um and you I don't know if you can or will answer this. I don't usually get to pepper people from the School of Government with questions, so I'm really excited [laughter] about this. Um does the School of Government have a recommendation, a preferred uh model to fund, like you No, you're just here to give us the pros and the cons, but I can't get you to tell us what you think we should do.
No. So, we're policy neutral. And so, the recommendations are coming from, you know, our partners in this project.
Yeah.
You do you are able to set the fees how how you all would choose. There are some restrictions and I'll defer to your attorneys for that on on how you kind of divide those fees up. And I'm not an attorney, so I don't have to speak to that either. But,
[laughter]
no. We don't have a recommendation. We provide those that survey as a benchmark, so people can see what other people are doing. But, we always caveat with, you know, just cuz your neighbor has a Porsche doesn't mean they're rich, right? So, everyone has their own kind of stormwater issues that they're dealing with, their own infrastructure that
their stormwater is flowing through. They're going to have their own goals. Like, that was a great discussion about goals and revenue targets. So, it's a great to see what neighbors are doing, but it is
I appreciate that. That's a good question.
since my name was mentioned. This slide does say rate structure agnostic. We do recognize that
[laughter]
certain things remain the same. You know, we might have some recommendations that that's based on things that we have looked at for Cary, but you guys will make the decision that's, you know, most suitable
I have a question. My My final question is it is it Can we offer any kind of relief on these these bills if there's a homeowner that or property owner that's having difficulty paying any of that kind of thing? Can we legally offer any kind of relief?
And I think of it as akin to our utility billing water and waste water. And so, programs like Oasis and things like that we could consider as well for stormwater.
Okay. Thank you.
Uh Addi- In addition to Carissa's question, how about nonprofit? Cuz I know nonprofit they don't pay property tax. So, how about the stormwater fees?
Stormwater fee is different. Um you know, churches pay stormwater fees. Pretty pretty much everybody pays the stormwater fee. Yeah.
I think you know, you
Like you took in the utility bill.
Yeah. What about the hospitals?
Mhm.
They pay They pay water bills.
Right.
So, utility bills.
I think as you mentioned the parcels that you took out of the study, I'm assuming most of those were government owned.
government
So, Cary owned properties, state owned properties, Wake County properties, but nonprofits in general are not exempt from the stormwater fee cuz it's not a property tax.
[snorts]
That's good because it takes money away from property tax and puts it in a fee.
Yeah. Yeah.
So, now they pay their fair share.
This was incredibly informative. I could ask you questions all day, but I'm going to get away from the microphone.
[laughter]
Well, if you don't have any other questions, I think we'll stop, but I would like to acknowledge our staff that are here because they're doing the
really hard work. So, Billy, Jan, and Lisa, do you mind just standing up for us? I'm sorry to do that to you. Um but they're they're the folks on the ground doing the really hard work and um including the hard work on all of pulling all of this data together. So, thank you.
Thank you. And Dana, do you need anything from us tonight? Anything you want to know from us?
Uh I think I feel like I've gotten good feedback from you without you saying yes, no, you know, it gives us enough information for us to continue to bring information back to you.
Okay.
Have you gotten feedback from Council Member Bush because I know [laughter] she talks on stormwater for sure.
Not yet, but I bet we will.
[laughter]
Thank you.
Thanks. [clears throat]
Thanks. See if I can get to That was the last slide. You had already seen it, but thinking towards the fall date next year to adopt a plan and bring you any information you need between now and then. Uh moving on to some updates. We're going to first start with uh Council Recommendation Committee updates. I'm going to turn it over to Jenny first, I believe.
Or the mayor is welcome to take it as well.
Yes.
It was just um wanting to update the whole council on the task force appointments. I'd updated the committee at the last meeting where um where we were at and wanted to bring this full list back to the full council. One thing we did um um note or wanted to say tonight is that the economic development commission, which is a council commission, is not on the list. It's different than advisory board. And so, but we were still planning to open that opportunity to them. Um they meet tomorrow night.
Okay.
So it
Any objection to that? So I think that's a good idea.
Oh, yes. Is there any concern though about parity with other commissions? Is that their only commission?
This is our um well, this is our only
analog?
It's our only council committee.
Okay.
And so and it there's only four citizens on the committee. Okay. So it would be out of the four. The rest of the members of the committee are council members and um some chamber.
city manager.
Yes. And the city manager.
Yep. It was structured that way.
Mhm.
I think when I became mayor, it was probably structured that way. Yep.
Yep.
Um so at our last recommendation task force recommendation committee uh we went through this. We didn't have the P&Z appointments, so we have that. We'll get EDC tomorrow.
Mhm.
Um we did give them guidelines of what we hope for this initial step, which is compensation and allowances. We wanted them to talk about that. And then we started and probably the next slide you have started going through Brittany's great slides, and we only got through two. But but we're making progress. We're nailing
you the the degree of conversation we're having.
Yeah.
[laughter]
Uh
Which is good.
And we meet again Thursday, right?
Mhm.
And and we're going through like detailing uh how much money should be in the bucket uh that council member had council members have to do travel, training, etc. And what should be taken out of that bucket when you do whatever. Uh so we're in those discussions and so we right now we have three more meetings scheduled and we'll try to stay a meeting or two ahead. Uh as we see our work going but uh I feel confident we might finish in those three weeks.
Yes, but there's light at the end of the tunnel.
Yeah. So we're making good progress so
So Mayor, I have a question for you.
Sure.
And this is a process question. Probably missed um or maybe I'm just getting old. Let me just say that. Um So after this um initial draft is kind of prepared, the council is going to review this in this work session or
maybe what the future work sessions and then it will go to the committee that we're building with residents from advisory board and they're going to discuss this or how is this going to work?
Right now the committee that is appointed in the previous slot is just doing compensation and allowances.
Our If we got it.
If we want them to do anything else, we can certainly ask them.
Got it.
Uh but right now the plan is we're going to come up with a set of recommendations and bring it to the council and discuss it and as a council we can do anything we want. Uh we can say, you know, let's throw it all to the committee or I like this and this or the bucket of money's too big or it's too small and we can make the adjustments there but hopefully the groundwork will be done and and it has. Brittany's done and so is Carissa. Uh a lot of the groundwork has been done so we don't have to research and have long in-depth discussions because oh, we researched that and we found A B C and D and
And your your uh task force I believe has a charge
Right.
to do that work that you would have to I guess amend or take it
So the the task force is only looking at the
compensation and allowances right now.
But we left it open if we wanted them to do
Then your you and your committee is doing everything else which is going to come back to the council and if needed we we can direct that to this advisory board.
Okay, got it.
Actually, if we need to or we can we can ask staff to flesh it out.
Got it.
Uh Lisa did a really good job when we wanted some clarity recently in the meeting because we were what we were um discussing at length was how concrete we wanted these recommendations to be, right? Do we want to come to you with like every single word fleshed out or more generalities, and we're sort of going back and forth, and and Brittany I have asked believe believe she asked both um Jenny and Lisa what might be the best
path to make this not any more difficult on staff, and and I think they said, "Well, if we just give them the the the punches, like here's the details, you know, go ahead and write this out and make this a policy." I think that is the direction we all agreed to go on.
All right.
Yeah. So, it's that was helpful because if the three of us, I think we're being so hyper thorough, if we had to write out every single word,
Mhm. We'd never
We'd be meeting until next December.
[laughter]
And they have to look at the legal side of things as well, so makes sense, you know.
Yes.
And for the items that the committee is working on, uh we gave a February or end of February deadline to the office of the state auditor that we would have reviewed that and looked at it and come up with a new policy. So, that particular work has a February deadline. The work of the task force um is not addressing a specific OSA or Rumble recommendation, so there's not a um time constraint on that, so they can take a little more time to do the compensation and the allowance work and targeting that to fall into the next budget year.
Right. Align with the budget.
And and my committee colleagues can correct me if I'm summarizing this wrong, but my expectation is that when we bring our our um rough outlines of what we believe these policies are or what we should discuss as far as the ranges for the roles are, if there's some place where we're where at an impasse, we we take that to the committee and say, "Hey, help us decide, right? Help us decide on this thing, you know, whatever it might be if we're just having difficulty making a decision." Yeah.
Any other questions? Thank you. And again, you would return at the November 16th work session. It's just the bottom last bullet there. So, have more conversation with the full council. Uh I was going to just hit the moving forward dashboard again. Um so, we kind of do it every meeting and just make mention that at your last council meeting, you approved three changes. Um moved one recommendations development,
but you also completed two. Um so, you uh folks can continue to sign up for updates, see this online, and continue to see updates on Fridays. Uh and then, you have a quarterly next week. It will be here. The start time is at 1:00 p.m. Uh we are working to finalize the agenda, but um you know, as with normal things, we'll talk about operational updates, capital, uh financial, and planning, and go through some legislative updates. And we'll finalize the agenda and send it to you um later this week or by November the 2nd. Uh that is all we had for tonight.
Is there going to be a more casual dress at the next uh
No ties.
Yes.
Cool.
Because I did I ordered my quarter zip.
Wear some carry gear.
[laughter]
I really did.
It's great. Quarter zips for everybody. It's fine with me.
Awesome.
Thank Thank you, everyone. We are adjourned.
Thank you.
Mhm.
Speaking at this meeting
Sign up for Public Speaks Out by calling the town before noon on the day of the meeting; each speaker gets three minutes. Comments that arrive after noon are passed to the council as correspondence instead.
Town of Cary's own rules for public comment — check them before you rely on anything here.
Agenda items (6)
-
1 Call To OrderProcedural
-
2 Upcoming Meeting Schedule ReviewProcedural
-
3 Discussion on Council Priorities Item: Stormwater Utility Fee DiscussionCouncil discusses a stormwater utility fee as one of its priorities. The agenda carries no supporting material.
-
4 Town Manager's UpdateStaff or committee report
-
5 Closed SessionClosed session
-
6 AdjournmentProcedural