Work Session
Town of Cary ·
Town Council
Thursday, November 19, 2026 at 5:00 pm · Herbert C Young Community Center, 101 Wilkerson Avenue, Cary, NC 27513
Agenda document Full packet Meeting page Watch Meeting recap
What was decided
- Continued 5.Closed Session (if needed) Not held during the work session
Read from the agenda's recorded outcomes. Where the board published minutes, those are the record — this is a pointer to them.
What's on this agenda
The agenda for this work session lists one subject, a capital projects update, and neither it nor the one-page packet names a project or a figure. The council also reviews its upcoming meeting schedule and hears announcements from the manager, with a closed session if needed.
The session meets at the Herbert C. Young Community Center at 5 p.m., ahead of the council's 6:30 regular meeting the same evening. Cary's work sessions take no public comment.
Summarized from the published agenda. Read the agenda itself before acting on it.
Meeting recap
What happened, drawn from the records published after the meeting. Recording
Most of this work session went to a capital projects update from the transportation and utilities directors, which the council had not reached at its recent quarterly meeting. The general projects ran from two planned fire stations and new fire trucks to culvert work, resurfacing, sidewalks, the Cary Tennis Park renovation and repairs to the White Oak Creek boardwalk. Staff also walked through four state DOT road projects in Cary, and stressed that the state, not the town, pays for them. Several council members said street resurfacing funding is falling short of the service level the town once set. One raised a possible bond referendum as a way to pay for it. The account here comes from the meeting's recording.
The utilities director said the town must pay to move its water and sewer lines when a DOT project needs the right of way, and that this will weigh more on the utility capital plan. He covered the Walnut Creek pump station upgrade, tank repainting, water main and sewer lining programs, and new interconnections with Holly Springs. He also told the council that Jordan Lake supply is holding during the drought and that Cary is sending water to Durham each day. Before the update, the council added two work sessions to its January calendar by voice vote. It held no closed session, choosing to take that up at the regular meeting instead.
How the votes went
One vote: the council added two work sessions in January to its meeting calendar by voice vote, with no opposition heard. There was no roll call.
Full transcript
Automatic captions from the recording, "Cary Council Work Session – November 19, 2026". Runs 1 hr 17 min. These are machine transcriptions, not a court record. They misrender names and figures — "Kildaire" comes through as "kill dare", and case numbers arrive as noise. Each timestamp opens the video at that moment, which is how a passage here gets checked against what was said.
Read the transcript (36 passages)
We'll convene this November 19th work session and I'll turn it over to our town manager Russ over.
Thank you, mayor. Um go briefly go over the agenda tonight. We're going to re review the upcoming meeting schedule. Um, we're going to finish a topic that we u did not get to at the recent quarterly meeting and that is capital projects updates. I have a few updates and a manager's report and there'll be a close session um if possibly if time allows. That I'll turn it over to Jenny.
Okay. So, this is just tonight and then we'll go into December 8th, December the 10th. Um at Monday's meeting we moved around some dates and after talking with staff um we did realize that we do need more time with you in January and so we are proposing to add the January 12th at 5:30. So that would be a 2-hour work session and then the January 26 at 5:00 p.m. which would be a 1h hour um work session. These are new Sorry. These are new both new dates. Is that right?
Yes.
Okay.
And if I could have a I know you'll adopt the full um calendar in December the 10th, but if you'll give me a uh if you would like to do a motion now, I'll just go ahead and have that down.
So, a motion to move these um addition to add these items to our calendar. So moved by Lori, seconded.
Thank you.
Discussion. All in favor, please say I. I.
Any opposed? Motion carries.
All right. Well, we will bring up Cassie Schumarker, Georgeopoulos, our transportation director, as well as Jamie Rebels, utilities director, to give us some capital project updates.
Thank you, Russ. And good evening, mayor and council members. Jamie and I have the awesome job today of talking about
capital projects with you and bringing you an update. I'm going to cover the general capital projects and Jaime's going to cover the utilities capital projects. Um, sorry. Um, I'm sorry. Um, when we think about what is included in our capital budget, our FY2027 budget included or focused really on maintenance. about 50% of our of our capital budget was for maintenance this year. Most partner or most departments have capital projects that require collaboration across all departments. So it's not just it's not just um infrastructure and utilities even though I'll cover those will be the majority of the the projects we cover tonight. Um it it also includes you know IT capital projects and other departments. And then we'll also cover highlight four projects that DOT has um going on in Kerry right now that they're doing planning and design for. Um I'm going talk about those in relation to what the project includes and also acknowledge that those include not just impacts to our transportation network and our residents but also to our utilities network.
So before we dive into the um specific projects, let's review the five phases of a capital project. So you'll see our slides organized tonight by what phase those capital projects are in. Um so the first phase being research. So this is really when we're starting to define the issue, look at what a potential concept could be for for an item and um looking at you should that continue to go forward. Um it's probably not budgeted at that point in time. [snorts] When we move on to the planning phase, we're looking at defining the purpose, possible costs, and also schedule for those for those projects. Design focuses on then working on detailed developments or creating plans. Um, showing the in-depth aspects of the plans or or how something might work. And then implementation is when we get
to do the fun things of actually constructing the project or implement or you rolling it out um within our system. Um, and this is where we spend the most money is during the implementation phase. And then finally, completion is when the project is all done. Um, we're ready to wrap things up. This is when we do the final paperwork. Um, also take an opportunity to um for reflection and learning on how we might do better. Um, tonight I'm going to focus primarily on projects that are that are in the design, implementation, and completion stages. But let's go ahead and dive in. So, um, Walnut Creek is a grant that we got from Congresswoman woman Ross. Um, it's going to focus on stream restabilization and reveation in the Walnut Creek corridor. This is focusing primarily on the sections um, south from Fenton to Interstate 40. uh looking at um nature-based solutions. You so like planting willow stems in in the stream bait to stabilize the stream. Fire stations 10 and 11 were currently in the planning stages. You will see on your consent agenda tonight the approval to order the fire trucks. They take about 36 months to to be delivered once they're ordered. But we're currently uh will we get begin design for both of those fire stations early in 2027.
Can I back up one second? I'll just add this is where sometimes capital budget planning um hits operations. And so as we talked about uh last year with regards to staffing and specifically public safety staff um will be an area to look for as we um you're going to have to staff these two fire stations. And I believe that comes with um potentially was it 15 Chief Ser somewhere?
15 per station. 15 firefighters per station. So as these start to come online, this is something that we'll um also be talking to you about in the operating budget.
Is 15 per fire station an initial hire
or what is the actual staffing need for an individual station?
Q chief. Good evening, Mayor and Council. Uh, yes, [clears throat] ma'am. That both those stations are planned in our strategic plan to have one resource initially, so it'll be 15 people per station.
Do you expect to need more?
Well, in our strategic plan, there's always a possibility that we may need a ladder truck in the area, but we haven't projected that out so far.
Okay.
Okay. Yes, ma'am. So, real quick, chief, [laughter] the I think it's 4.9 on the consent agenda for the fire trucks.
Is that part of that 5.4?
So, that number on the screen includes the design costs for both of the fire stations as well as the costs for ordering two new fire sta fire trucks. What's on the consent agenda tonight is actually ordering four fire trucks. Two of those are replacements for existing fire trucks.
And so are those part of the 5.4 or they're not
the the So the two new ones are and the design for uh station 10 and 11, but the replacement fire trucks are not part of the 5.4. That's part of a different budget in the capital budget.
Okay. Thank you.
Sorry,
Chief. Do you want to add anything else?
No, [laughter] ma'am. You covered that well. And it's required for the lead time to
That is correct. Yes, ma'am. On the replacement apparatus, we're ordering those in advance to replace them when they need to be on their life cycle replacement. [snorts]
Anything else on the fire truck or fire stations? Okay.
Um moving into the the design phase. So, at Lake Pine and Brook Green, we're replacing um several culvers out there. We're in the final stages of acquiring easements and when this project is complete, it'll actually imp improve
flooding that's currently impacting six homes in that area. West Chattam Street resurfacing. This was budgeted in our FY26 budget. It resurfaces 1.5 miles of West Chadam Street from Southwest Kerry Parkway to Old Apex Road. It'll also include, like all of our resurfacing projects, um, pedestrian and bicycle facility improvements. and we're looking to begin construction of this in 2027. We're also moving forward with the traffic signal at Southwest Kerry Parkway and Laura Duncan Road. Um this includes the traffic signal which the design is complete. We're currently waiting on um approval on encroachments with NC DOT, but it includes not just the traffic signal, it includes pedestrian improvements as well as intersection improvements. It'll also add video cameras um to the system there. [snorts] and we're expecting to bid that this winter. The McKerman Parkway pedestrian improvements. This project is located at um Panther Creek, Panther Creek High School and Channing Park Drive. This was funded in FY25 and includes a traffic signal at the east driveway for the school and Channing Park Drive and then also a signalized crosswalk or an RFB at the west um at the west driveway for the school. It'll also include intersection improvements. We have our permit permitting approved through NC DOT and we will um move to bidding next month for Carpenter Fire Station Road. We've completed the undergrounding of the utilities as well as um acquisition of all the right of way. Um we have construction authorization from NC do and we'll look to bid this this winter with construction beginning in 2027. Um the construction for this will take about two years once that goes under construction. And our um current construction estimate for the remaining work. Um so the roadway construction is about is $18 million.
The USA um so now moving into implementation um which carpenter fire station falls into um the USA baseball national training comp complex and field two for field two renovation. This is completely rebuilding the existing field 2 adding new irrigation and new drainage. Um, we opened bids on October 27th and this is one of the items on your consent agenda tonight. The citizen convenience center work. This image shows how work is progressing out there. Um, council appropriated $525,000 to complete the relocation of car's operations outside of the North Carolina Railway. Um, we will maintain citizen access to yard waste and food compost operations without interruption to service there and plan to have it the the new location open to the public in January.
Can I ask a clarifying question? Will we still have uh employees on site there or will the new facility be more or less self-s served?
Jimmy's nodding his head.
We will still have an employee.
Y'all heard it. [laughter] Yes, we will still have an employee on site.
Yes, employees will still exist on site.
Yes, we will still have employees on site.
Okay. [laughter]
But Jimmy, before you walk away, if I understood a previous presentation correctly, the food waste drop off is being moved to the location that that's going to be available 24/7.
That's correct. That'll be in the outside culde-sac that's currently there and it's about 75% complete, but it'll be open 24 hours just like Mills Park.
Okay. Then I haven't misled residents.
That's correct. [laughter] Um, Kerry Tennis Park renovations are currently um have started in October. We're replacing or doing um post-tension concrete on 12 courts. It also includes new court lighting as well as bleachers and shade canopies out there with expectations for this to be completed this summer. Several of us spent the a beautiful
Saturday morning together um this past Saturday to do the groundbreaking for the GO Carry bus operation and maintenance facility. So work out here started in in August and started with the site clearing um it included also rock removal and also relocating utilities. The next several slides I'm going to cover are kind of um general capital maintenance projects. So, it's not really spo specifically focused on one location. It's going to cover several locations and that's how they're itemized in the capital budget. Um, so first off, fires capital maintenance um with a budget of $800,000 looking at doing systemwide um HVAC replacements as well as painting of facilities. And then station six, we're resurfacing the parking lot and um replacing the generator there for um general capital maintenance of our buildings, facilities maintenance um for town hall with the budget of 2 million or $2 million this year. The majority of that's going to replace the HVAC system, also doing some fire system upgrades and replacing the generator here at town hall.
Can you Yeah.
to the bridge issue. the I cannot but can anybody [laughter] sorry [laughter]
sorry Lori
should mic you up
yeah um can you be more specific with your question
oh sorry the bridge that's outside of town hall that the pedestrian bridge that had to be shored up
the pedestrian bridge on the back side of the building there
that was supposed to there [snorts] were some concerns that it
there were concerns it is currently shored up with temporary shoring that we inspect yearly and it it's planned to continue to be that way for the time being.
And how do you all feel about temporary shoring?
Based on our engineers recommendations, it is sufficient for what we're using it for
and it'll last for
we haven't been given a lifespan on the end of it at this time.
Is that something that will need to be budgeted in future years? It would definitely be budgeted in future years for sure, but it's probably I hate to put a number on it, but it's not in the near term.
Okay. All right. Thank you, Cassie. I have uh could you help me uh explain the uh replacement of the HVAC's? So, do we have like otherments? Do we have like standards for how many years we need to do replacement? Because this kind of uh maintenance doesn't happen every year, right?
Correct. No, it does not. Um, I don't if Jimmy Timmy wants to add any more to that.
We we have all of the HVAC systems across all of our venues and and buildings on a replacement cycle. Um, each system lasts a different amount of time and so all of those are in our planned capital moving forward.
I mean, you may want to add um y'all spent a good deal of time creating asset management system, tracking system.
In the last two to three years, we've been working on asset management throughout the entire organization. So holistically looking at what that looks like and creating a 20-year capital outlay for what we um are projecting our future needs to be. Um so we're doing those outlays. We're also having those independently verified by engineers to make sure that our numbers are correct and that we're actually addressing the problems as we see them.
Thank you. That's helps me a lot to uh for the future expenses on maintenance.
And you'll be seeing that in future capital budget coming up soon. [laughter]
Thank you. And then for our parks, recreation and cultural resources capital maintenance with a budget of $2 million. We're also replacing HVAC systems for um the Page Walker as well as the Kerry Arts Center. We've resurfaced the uh greenway at Bishop's Gate and also doing some athletic court resurfacing. As part of this um capital maintenance, we also inspect a third of our pedestrian boardwalk inspections annually. And um
that brings us to then the White Oak Creek boardwalk which I know the press release went out this past Friday. We started work this past Friday um expectations for both of those boardwalks to be reopened. You can see here the um what was identified during the inspection. So the current work is going on to to um make that repair. We had money in the FY27 budget to cover that. We will be looking as we develop the FY28 budget to look at considerations for funding potential replacements or additional repairs for those.
And let me add when you say we had money, we have money in the budget to replace this. We have maintenance money. Uh this became one of the highest priority needs for that money. We have other needs and I don't know if you want to add anything to that.
Yeah, that's correct. And we do that onethird of our pedestrian structures across town, including the the one that we just spoke about um every year. And this came up in that engineers inspection. We prioritize about $250,000ish each year to greenways and repairs of that nature. And then that's how we prioritize this and moved it to the front and had funding. We did have to defer other maintenance that would have been done instead of this. And that's just part of that moving those pieces around which is why we also fund it in the buckets as we do is so we can rep prioritize as emergency repairs come up.
Was this a surprise? Because that looks I mean maybe pictures are deceiving but it looks quite bad. Was it was it surprise to everyone? And are there can you extrapolate on that to other places where we have boardwalks?
We can. And I was going to have you share because Jimmy shared with us that's usually underwater.
That's correct. That in this area it stays wet most of the time.
And so we've been going between wet and dry. Wet and dry. If it would all stay wet or if it would all stay dry, it would be a different scenario. It doesn't wear as quick.
So it's it's increased that wear. Plus
the age of the the age of the structure is to the point where it is coming to the end of life and part of asset management will start picking that up. And that's also why we inspect these uh a third of them annually.
Great. Thank you.
So a structure like this, a wooden structure that gets wet and then dries out erodess or decays quicker than if it was just sitting underwater all the time
because of the condition change. Yes.
Well, I learned something today. I did not know that. Okay. Interesting.
Well, and I know this is the slide that you've all been waiting for, the neighborhood streets improvements or the resurfacing program. [laughter] Um, we actually just put out to bid our FY27 project yesterday. So, this is currently out to bid with bid opening occurring in early December or sorry, early January. Um, and we'll begin construction on these projects this spring um with a budget of $9.5 million. And then we've completed the FY26 um resurfacing program. And again, one thing I want to highlight is that it's not just, you know, milling the pavement and putting down new asphalt. It also includes pedestrian improvements, upgrading of our of curb ramps um as part of those projects, installing uh uh crossings also. And with the FY26, we did o over 10 miles of completed roadways. And then you're going to hear Jamie talk about Louisie Drive. But something that's special about the work that we do is that we don't I mentioned we all collaborate with one another when we do capital projects. So for Louis Drive is a good example of this where Jamie had a waterline project and as part of that project he also completed about 600 feet of sidewalk for the community out there. And when that project was complete you doing the waterline project creates a patchwork of asphalt out there. we were able to come back and completely resurface the street to make it all consistent across that area.
And and Cassie, um if I beat the mayor to this, okay,
you may know where I'm going. 2026, um
obviously the budget was less than it had been prior. You see that there's a difference in that budget. I think it's worth highlighting um as has been mentioned several times that that is not keeping up with the service level standard that probably um at least a previous council had had set or had conversations around. I think is important as we go to the annual meeting or retreat that we probably continue uh conversations about service levels and then what the cost of maintaining uh keeping Carrie Carrie really is for the community because all this comes um through our revenues which are largely um sales tax based or tax property tax based
um and I just highlight that figured the mayor might as well but I was biting my lip. Yeah. Um but
but Russ do you think that is because the cost has increased or do you think the commitment has changed?
I think it's all I think great points. I think it's all the above. I mean obviously the cost of increased over time probably will continue to increase over the time. We'll know more upon bidding that project um if we can do that actual amount or not with the cost of petroleum products etc. Um I think this is also what happens as a community ages and you have more maintenance cost in general. A lot of these, as you've seen, the commitment to the capital budget has really become largely maintenance f focused and as more things um age, there will continue to be maintenance. I think he can nod, but I think USA baseball is an example. This is the second time we've replaced the turf. I think you said
the first time on two, the second time the stadium was done.
Okay. But you're seeing that we built uh USA baseball because it was important to me because it was my project when it was built and now you're seeing other people come in and um redo that project as a result of um building it. I think it's probably important to think about as we do more parks or projects is as uh Jimmy Cassie and all the teams are looking at what maintenance costs are over time um when you build something there's going to be a maintenance cost to it in the future. I'm not sure we've talked about that broadly or widely and maybe it's worth in a service level discussion talk
about what hits you in the future and how long systems last whether it's um 20 25 years for street improvements or you know
10 15 management correct
and and you can you can show a graph and see when all these things come due. It's real easy. There are tools that do it. Just saying. I'm just and we've just not been in a place where that had to be as much as it is now. And moving forward, [snorts]
I feel as though we had a pretty robust conversation about the delta between what we're budgeting for road maintenance and what we think might be the true necessary budget. Do you remember I I I want to say, and I could be getting this number wrong, but it was a little over 17 million at the prices at the time, if I'm And and the 6 million we deferred won't be 6 million. It'll now be
10 or 15.
Correct. Yeah.
And the more we defer, the more expensive it'll get.
And then to your point, it was a cost value per the street rating index that you wish to have as your service level standard.
And depending on what you tweak, it's going to affect the cost.
And we had, you can say, two studies done to show you what deferring means. So we we have y
those um models where you can model that and I'm sure we do in other asset management systems as well.
So when we talk about a potential bond referendum and maybe can you use uh bond referendum dollars for street improvement?
We have in the past. Yes.
So it would be a potential way for us to leverage debt service to improve street.
That's correct. Is it so the I I'm this is an assumption I made from watching the Chattam Street repavement go on that was very quick. It was for for a road project. I think most people's expectation is you close a road and it's going to be resurfaced. Oh, that's going to be months of detours
when in fact weeks a month. I mean it was it was really fast turnaround. So my assumption is that the significant amount of materials involved is really where the budget gets eaten up. Is that typically accurate?
Any thoughts? I'll let Cassie share.
Um, we'd have to look at the comparison of that. We do hire a consultant that helps us with the scoring and um and management of the data that we use for the system. Um and you know, but probably a lot of it is the materiality that goes into it and
um with you uh national the conflict in Iran um had some changes to asphalt or oil costs. Um also we were talking just before this meeting with staff um just the we do uh we upgrade all the ADA ramps as part of these projects. Um looking at what we're proposing for FY27, there's about 127 um pedestrian or ADA ramps that we'll replace as part of that project. In the past 10 years, they've gone from $2,400 per ramp to $7,000 per ramp. And so just even the cost of concrete and the materials used in that too has has changed significantly.
And we talked about rebar
that little yellow
raily like truncated domes.
The truncated domes. Mhm. truncated dome.
Truncated dome
is $7,000
with the with the concrete that goes around it. So, it's it's um replacing the so removing the old concrete, replacing the existing concrete, and putting the truncated domes
and putting a ramp in that meets current ADA standards. Ramps that are in now used to meet ADA standards. You have to build to the new standard.
So, it's been improved. Okay.
It's changed over time.
And contractors are still an issue, too. And that drives up cost.
Yep.
And we have the bids for those projects, right? So the price we can we can
compare.
Yep. You can evaluate them year.
That's 7,000 is not someone just bring$7,000. It's a industry or market price.
Yep. That's true. Very
Yep.
All right. Um so then moving into more completion projects. So the Twin Lake dams were completed and the green and the greenway has been constructed. You can see people enjoying the greenway. Now it's open to the public. Um we are waiting for um the NC dam safety to allow us to refill the dams. We're also waiting for it to rain. Um so Jamie will talk more about that later. Uh we'll be doing some tree planting this winter. Uh we also seated a 2acre pollinator meadow which also Chris you've asked me before pollinators also dragon flies. So that will be included.
Wonderful. [laughter] I'm still not the entomologist.
Control. Excellent polit. Yeah, that's great to hear.
Um, also exciting that excitement that's occurred in the past several weeks of reopening the Black Creek Greenway completely. Um, this past winter we did open the the bridge, the Kerry Parkway bridge, as well as the first phase of of Black Creek Greenway. Um, this project is another example of where it's not just reopening the greenway or installing a sidewalk. It's also storm water improvements moving the the greenway from the stream bank and out of the flood plane as well as it actually started with a sewer line project with utilities. Um so it renovated 2.5 miles of greenways uh and we're planning a celebration for this um January 1st with K's first walk. Um this was I think one of the first projects I brought to you in my role as first interim transportation director. the High House Road and Bon Park traffic signals. Um, this was completed this summer. It included not just the signals, but also upgrading the the pedestrian crosswalks as well as the conversion of Morio Dell Place to a ride out only. Um, and then also with the bid amount that was part of this project, we
resurfaced Evans Road and Western Boulevard, uh, Weston Boulevard and upgraded the pedestrian uh, crosswalks there as well. Cassie also brought you the good news in that project that between all of that work that's the most expensive signal project
um in car's history. Yes.
Just because since you're hitting [laughter] it, but the cost of materials have increased and this is metal and steel and other things. So that uh signal projects have become very expensive.
And I'm going to close out Car's um capital general capital construction projects with several slides on uh sidewalks. Um so you can see here these are the sidewalks that have been completed in the last six months. So we have Kerry Parkway from Triion Road to Lockmeir Drive, Norwell Boulevard from Weston Parkway to Beexley Bluff Lane, Optimus Farm Road from Glade Hill to West Lake Drive and then Penny Road from Kildair Farm Road to Magnolia Wood. And this is something where you continuing to look at how we tell our story. These aren't just sidewalk projects. They also included pedestrian signal up upgrades especially or particularly at the um Southwest KY sidewalk. And then for Optimus Farm Road, you can see we installed a new traffic signal which aids in the pedestrian crossings at Glade Hill at the Glade Hill Drive intersection and also upgraded the pedestrian signals at um West Lake Road. Another item on your consent agenda tonight is the bid award for two sidewalk projects that are funded through the transit lap or local area project program fund. That's west West Johnson Street from North Harrison to Academy Street and then Nodding Ham Drive from Donaldson Road to Buck Jones Road. Um our construction estimate was about $800,000 and it came in at just under $600,000 which you'd see in your SAP report.
[clears throat]
And then um the design work we're doing for what was approved in um the FY27
budget. All four of these sidewalks were on the reassess list. We built them back and also and also have built back in other sidewalk projects that were on the reassess list into the capital budget. Um but these four are moving forward with bid advertising bid advertisement plan this winter. So, it's North Kerry Parkway, Highfield Avenue, um Laura Duncan Road, and then Maynard Road. And what I lost in my brain earlier tonight was that we're bringing forward to um focusing on projects that had been completed in the last 6 months and projects that you're going to see that are under construction now and then also projects that you're going to see go to bid and be brought to you likely in the next 3 months. So, with that, I'm going to transition over to it's not just Kerry doing work in our in our um transportation network. NC DOT also owns about 200 and maintains about 200 miles of roads within Kerry um and also on on the edges of Kerry. So, I'm going to highlight four projects that are currently going on right now. Um again, they're NC DOT's projects. We do communicate with NCDOT on these projects, but they're they're the ones leading those projects and have it and have the most up-to-date information. Um, so I think directing continuing to direct citizens to NCDOT to answer those questions is appropriate.
And just add and funding them. These are projects that um typically do not have carry funds. It's just been important with some of the inquiries we've I think been getting that Carrie does not fund DOT projects. Um, the state does.
Yeah. Yeah. And these projects, all four of the projects I'm going to highlight tonight tonight are are fully funded in the state transportation improvement plan. Um, so so [clears throat] they are projects that are in design design phase or concept conceptual design phase and are planning to move forward. So the first one I know we've talked a lot about Trin or about the Maynard Road
project, but what's to come first is actually the Trinity Road grade separation. So this is happening just north of Wake Med Soccer Park. um where they're planning to construct u uh bringing Trinity Road up over the railroad and up over East Chattam Street at this location. And this is all part of a study completed about 10 years ago to look at closing the rail line to um to vehicular and pedestrian crossings. And so that's that's what's happening with both the Trinity Road and the Great and the Maynard Road project. Um they are this is kind of in the working towards a construction design phase. Um they're planning to start conversations around land acquisition um in 2027 and looking at construction in 2031.
So the projects you're going to go through are basically all going to be under construction in 2031. I am curious why it takes them five years to begin construction because design doesn't take five years.
Correct.
So, do you have any answer?
I I do not I do not have an answer. [laughter]
I I'm guessing it's to spread out the money that they don't have
and uh trying to make it work that way
possibly. But you are correct. You we do see them all beginning to line up in the same year. Um, we've joked about how it might be hard to get into Carrie from the east side in the in the future. Um, or as he's going under construction.
I don't know, maybe a tangential question for our legal council is how long does rightof acquisition take?
Exactly where I was. I imagine
depending on the the willingness of all parties, negotiations could take quite a bit of time too.
It can, but DOT just as Carrie can condemn and immediately becomes the property owner.
Okay. Um, so they do, uh, tend to try to negotiate first before they condemn. Um, but they could they could speed up that process too if they they wanted to put more time and money to it.
And I think you're hitting it. They give the date they start right away. Acquisition, they're not giving the date
they completed,
right?
Yep.
Is that um section adjacent to the soccer park? There's no road there right now, is there? Trinity Road. Does it cross 5 or Chattam Street?
Yes. In our in our long range plan, the road would actually connect all the way into the Fenton development. Um the road on this
is there a spur today?
This spur today does not exist. So they would build it exists as the as the driveway into park.
It's a little driveway that secondary driveway, is it? Okay. I was wondering about that.
Yeah. So, it would be um you bringing traffic in to the Soccer Park area and bringing them up over Chattam Street and and the railroad crossing. They'll realign Trinity Road here to remove the 90 degree curves um and then connect it up to Chapel Hill.
Okay.
And it this will effectively be an interchange type solution.
You have to drop down and back onto Chattam Street, which is why it kind of shows two lane. There's a ramp down is does anybody know if they're going to let the that strange sort of sharp lefthand turn down further remain the one that's in sort of the
the one in Raleigh?
The one going towards Raleigh. It's just a little ways past this one.
Yeah.
You you
make that sharp wood.
Trian woods. You make that sharp left.
You get out.
Um different. I don't believe there's a DOT project to do anything with that. It is a sharp extremely sharp turn
but the same set of tracks, isn't it?
Yes, same road
goes up and around to maybe into Raleigh and across 40.
Interesting.
And up to SA back entrance to SAS.
I'm taking this.
Not not aware of any.
No, that that does not extend up Trinity Road to Trenton Road if that's the area that you're thinking of.
I'm not sure. I'm on I can't I can't remember.
It is. It's north of it's it's up off the map. Yeah. Oh, okay.
So, this is the first of the two projects along this corridor. So, the other one is the Maynard road grade separation, which we just had the public meeting for in October. Um, where they'll the proposal is to bring Maynard Road under the railroad tracks at this location. Um, their timeline is the same as Trinity Road. Trinity Road is to be constructed first to provide the detour for Maynard Road being closed. The project managers for that said Maynard Road would be closed for up to three years. And I know a few of us are meeting on Monday to talk with NC DOT. They're going to cover the history of of these two projects as well as what they've heard from the community and what next steps are at that meeting.
Since we say they're these are their dates, but if they're opening Trinity to be the detour for Maynard, I'm assuming we have a conversation that those dates could change. I just point out you see that all the dates are the same,
but something would seemingly have to give.
Um I don't want to get ahead of them and where they're at, but right
that's [snorts] what we've been told.
Yeah. Yeah. We're we're just sharing the same information that's on the website for NCDOT.
Um and then last night was the public meeting for the US 64 project and I know several of you attended the um the local officials meeting for that project on Monday. Uh this is looking at major inter interchanges at Laura Duncan as well as Lake Pine Drive and Edinburgh Drive in Kerry. Uh they'll begin with the railroad um replacement and the rightway acquisition for this has already begun. We've talked about what they've purchased so far and so that will continue. The bridge is proposed to be start construction in 2028 with the roadway following in 2031. And just for everybody's information, the public session, whatever, went very well, very positive. Several hundred people there, very crowded,
no negativity that I saw. It was all positive and they were just asking questions and wanted it sooner than later.
So,
and then the final project, and um Mayor Weinberg, I know you've been asking about this one, the Crossroad Junction project. So, I know we talked about this one a lot with the South Hills resoning as that was coming forward. This is still um this is actually in you contract selection phase. So, they've been working with several design build contractors and are planning to award that that um that contract in early 2027 to continue working on this interchange.
But it's funded.
It is funded.
It is okay. Mhm.
And that's the one where entire new um offramps are created and some of them were actually near new developments that we had recently resigned.
Yes. So this shows kind of the the US1 uh 40 440 connection, but it does impact Piney Plains Road with new interchanges down there or yeah, new on and off ramps down there.
Do we have any expectation of [clears throat] the design changing? I know there's there's been a lot of work into the design. Do we expect it to be what it is or what we've seen in the last couple of years?
I think for the most part, so we've seen kind of a lot of conceptual design and as they uh award the design bid contract, we'll we'll begin seeing more of that details.
Yeah.
Thank you. And um so I mentioned earlier that Jaime's going to come up and also and talk about our utilities capital projects, but also talk about the impacts that these the NC dot projects have not just to the transportation network, but also to the utilities network. So I'll turn it over to Jamie unless you all have and I'll stay around and answer other questions if you have them. Thank you.
Thank you.
Thank you, Cassie.
Yeah. So, um, you know, Cassie did a great job talking about these, uh, these DOT projects, and I guess I just jumped right. Good evening, council. Good to see y'all tonight. Um, we, uh, [sighs] we do have a lot of DOT projects coming up in, um, in our community. And this is, um, when we think about utilities, we're we're Kerry and Morrisville and
Wake RTP. So, any DOT projects that um, hit across any of those areas, we have to pay for the utility relocations. And uh, so we do an agreement with DOT. And um wait a minute.
DOT does a project, we have to pay for the utility relay.
Yes, sir.
Wow.
If we're in the rightway, which most of our utility lines are, we have to pay for the utility relocations.
I didn't know that.
Because it's their right of way.
It is their rightway. And so any utility in their rightway would have to pay for those utility relocations.
I think I'm learning that us being in not our own rightway seems to happen.
Like, and I don't mean that in a negative way. It seems like we're all trying to be good neighbors.
Um, but [clears throat] sometimes they want their to do something different or want their rightway back. Is that
kind of what's happening here? They like they have to do something different there. So, we're
Absolutely. Especially when they go in with a big interchange improvement like they've recently done over at Airport Boulevard. Um, that was a very instrumental project for us because we had to relocate all the utilities um in front of several restaurants and hotels. It created service disruptions. It was it was a very intensive job for the utility relocations. Um and that job went on for years in terms of the utility relocations.
And maybe it's good to think I mean we're treated like all the other utilities. So if it's power
um you you've got any type of line where it's Spectrum or AT&T or otherwise other utilities are also then required to do their own locates. This may not have been the case for city or municipal utilities in the past, but it is now.
Yeah. For smaller option, right? everybody. I mean the whole plan and point of a rightway is so that we all share
this corridor that so for utilities for all different right so there's no
I mean there's no other option unless we created a municipal
right away just for us
which would take end up taking more land
away from a
Yes ma'am absolutely
private developer so
so you're probably going to get to this but is this all under utility money or are we going into general fund?
Yes, sir. It is uh utility money, utility fund money.
And typically uh each year in our capital plan, we will we will bank a little bit of money just for DOT relocations, just wherever they pop up because sometimes they do small projects, but these projects are all so large that we're having to really dedicate specific funding for these specific projects over the next few years. And uh so this will be this will be a bigger impact in the utility capital plan going forward. And of course I would be remiss if I didn't mention um there's one that we're tracking a little further out that is at the intersection of Highway 751
and Highway 64.
This is way way out on the other side of Apex, but we have three raw water transmission lines that go through where that interchange improvement is projected to be. And so that uh our budget estimate for that, that one's a little further out, but that could be like $5 million to relocate those three rawwater transmission lines if we're required to do that. So um so that's one we're keeping an eye on as well. Just kind of gives you an idea of how big a footprint we have in the utility system that we we're all the way out by Highway 751 and Highway 64.
So when we pay our water bill, we're paying for this is a significant chunk.
Yes, sir.
Of our water bill. Absolutely. I didn't realize that. So, let Mayor, since you brought that up with the um utility fund,
there can be general fund impacts on utility projects and we heard this the other night.
Um so, just a good time to say it. We may not know the extent of those impacts for the other DOT projects that Cassie was mentioning, but if we typically want um sidewalks, maybe other mobility options, um they will routinely um make us pay for those types of options because they're not in the business of building municipal sidewalks and
possibly bike lanes and other um things associated with a road widening project. We didn't go into that and it may be too early to know it for those projects, but they did say that to some to the town of Apex um on the 64 widening project since they have some infrastructure that they mentioned they likely wouldn't pay for. It would be the same in Kerry.
Yeah,
I remember there was a period of time when we were working with DOT on some bridges maybe uh and we wanted a a bike lane or a sidewalk and they weren't prepared to do that. or maybe we also wanted some decorative facade on the side walls and we ended up the town of Kerry ended up paying for any of those enhancements. Is that still a possibility as design comes up that you know like for instance let's say we want a separated bike lane under one of the uh overpasses.
Yep. As as we have been evaluating those projects, we've been identifying what improvements might be might we would like to see there. So, similar to um Apex with US64, we've also asked for um some additional bike ped improvements along that corridor as well.
Great.
Thanks.
All right.
All right. Well, let's talk about some more exciting utility upgrade projects. So, um the Walnut Creek pump station.
Jamie snuck this slide in on it.
Yeah. Yeah. Yeah. Very exciting project for me. Um this uh this pump station was originally built back in 1988 and um has served u the southern part of Kerry. It came online at the same time the South Kerry water reclamation facility came on. And so um this pump station really hasn't been upgraded since that time, but this this pump station supports the Fenton area, downtown Kerry, and whatever we uh decide to do at South Hills in the future. So all of the waste water from all of those areas which are growing and expanding goes to this particular facility. It's right off of uh right off the US one highway corridor there. Um and um so we have this project
in place to um expand and to improve this pump station and to really get this pump station ready for the next several generations. I will point out this is a 3D schematic. So a lot of what you see is underground. Um, so the dark shaded stuff is above ground and all the light shaded is below ground or above the flood plane level. Um, Cary Town Boulevard uh, sewer replacement. This is a collaboration between uh, utilities and storm water. Um, what happens sometimes with our sewer lines is um, our sewer lines were perfectly placed and then the stream meanders over over time and it it kind of it kind of encroaches into where our sewer lines are. And so you can see with the manhole off in the uh in the f in the u in the distance there with the circle around it. That manhole's right in the middle of where the stream is now. And so what we're going to do is we're going to relocate the sewer line a safe distance away. And then we're going to armor and fix the stream while we're working in this area as well. So joint collaboration storm water utilities. This is a job that's um that's going to be advertised for bids in early 2027. This is a tributary to Walnut Creek. Jamie, why not move the stream back to where it was?
Um, well, the stream's already already moved and um we've done a lot of um evaluation of that with the environmental experts and the recommended approach is to move the sewer line and let the stream stay where it is.
Okay.
Yeah, but that's a great question and that was that was exactly what we asked at the very beginning and we brought in all the experts and um and that was that was where we landed. Thank you.
Yes, ma'am.
Life finds a way.
Why don't we have Kerry branding on these?
You know, the other day I was actually driving by one of these and um on Morrisville [clears throat] Parkway. Um it's close to 55 in Morrisville Parkway there's a blue
Mhm.
tower.
Yeah, we got the carpenter tank out that way.
I was looking at that. I'm like, why is
Well, I can answer that question for you. Okay.
Well, we we unprioritized it. was a very low priority to the council based on a recent priority exercise
with regards to potentially branding the tanks.
But I think it got five reds.
It got the most votes of unprioritizing. I guess
it got unprioritized now.
It's the lowest score vote, wasn't it?
The case like 10 years ago. These tanks have been there for many years.
And a prior council was also like to keep it unprioritized. [laughter] Okay.
Um, your priority list can be revisited at any time.
We could sell branding on them.
Correct.
Your name here.
It cost to do branding.
Um,
well, Jamie could answer it. Really, it's,
you know, you need to do it when you paint the tanks. So, it's probably a ne a minor costs in the overall cost of painting the tanks.
Yeah, it it wouldn't add much to it. Um, these tanks are typically painted every 15 to 20 years. In fact, we put them in the capital plan to be painted every 15 years. And um so the one on the left is Field Street. That's our only Spireroid tank. And um you see it looks kind of white. It looks kind of chalky. That that's your really good sign that it needs to be repainted. So um and then the one on the right is Ridge View over by the Trader Joe's Shopping Center off Kildair Air Farm Road. So um so both of these tanks we're um we're planning to get them painted. They're going to be beautiful. Hidden Lake blue. It's they're going to look wonderful when they're repainted. In fact, Harrison was just repainted and it's it's got a really nice coating on it. Looks great. Um right there next to Jordan Hall. So, um so these tanks are um planning to be advertised in early 2027. And uh does anybody anybody want to guess how many water tanks we have?
You might have guessed it.
I think seven
10.
How many?
Eight. Seven.
Seven 10
nine.
13.25 million gallons. So these are all the tanks
same as the fire stations.
Oh yeah,
this is a quiz for me. [laughter]
So we uh we are very fortunate to have all these tanks. Uh it really helps um improve the resiliency of the water system and um and so it is a big capital upgrade for us to uh to go in and repaint these tanks every 15 years and it's part of our capital plan.
When's the next one needed? I I don't think we need any more tanks for our service area right now. Um I think we're we're in really good shape based on our master plans and um demand levels and all of that. We're we're looking really good right now.
Okay.
So um we talked a lot about how important maintenance is and um you know we're constantly working on the design of new water man replacement projects. I can tell you there's nothing more frustrating than going and repairing the same water line over and over and over again. Um, and so we started a water man replacement program back in 2008. It has tremendously helped reduce our water main brakes. As you can see from the little chart down here, this was when we started the replacement program and our water mane brakes have been much lower ever since. And um, we're much lower than any of the national standards uh for water main brakes and traditional municipal water systems. Um, we're very appreciative of the $5 million per year that we um that we have approved to uh fund these water main replacements. This makes a huge difference for us. This is a game changer. It it really sets us apart from a lot of other communities.
Maybe add the difference compared to we were talking about street resurfacing is because you have dedicated fund and utility fund to be able to
to do this to
possibly do more or maybe keep up with your service level standard.
Yeah. So, our next big project area is going to be around Himsdale Drive. We've had um some repairs over there. We know we need to get in and address that one, but we're always we're always planning two or three years out um to make sure that we stay on top of these important water main replacement projects. Also, with the sewer rehab program, we
uh we started sewer rehab back in 2001. It was my project back then. And um and so this is a way of putting a liner inside sewer lines. It keeps us from having to dig everything up. It's really, really great technology. And Russ said it was okay to bring in some props. So, um, so I've got a sample. This is actually from the Crabtree Creek Interceptor. And, um, you know, Cassie was talking about the Black Creek Greenway and all of that. Um, so this is over in that general area. We just lined that big sewer interceptor next to Lake Crabree not long ago. And this is a sample from that one. You can see how thick this is because this was a really large line, greater than 30 inches in diameter. But I'll pass this around the room. And um
how many times can you reline them?
Well, the idea is you reline it one time. And um and this is a more resilient material because it's not delta iron. It's more resistant to sewer gases and the corrosive environment. And this should last 50 years or longer. So it lasts a really long time.
So does that mean you get like the 40 to 50 years of the original and then you go and line it so you get another 40 to 50 years?
Yes, ma'am. Absolutely. Um, in fact, this should even last longer because it is more resilient. It's kind of a plastic based material. It stands up really well against the corrosive environment inside sewer lines a lot better than metal surfaces do.
What?
Felt as in felt. Felt.
Mhm. It's called a resin impregnated felt. And so it comes out as a soft material and then it's um it's injected with a plastic resin at what's called a wet out facility. And then it's trucked in and refrigerated trucks. If it's not refrigerated, it'll cure.
So, that'll be a that'll be a mess. So, uh so it comes in refrigerated trucks. It stays soft and then it's inverted into the sewer lines while it's still soft and it's inflated up against the original pipe and then it's cured with hot water over many, many hours and the curing process and the hot water activates the resin and then it becomes a brand new pipe inside of the original pipe.
That's so cool.
Yeah. great trenchless technology and something we've been doing in Kerry since 2001.
All right. And um Mayor, I know we talked a lot about, you know, the uh the metering program and the asset management approach there. So, this is something that we're staying on top of and we're going to have another um item coming your way soon to um to to get another round of meter replacements done for FY27. So, we're looking forward to that and um and just keeping our meter program in top-notch condition. All right. So, this is a little bit different project. So, ultraviolet disinfection is u what we have at all of our wastewater facilities. And the south carry water reclamation facility is my understanding had the very first UV system in the state of North Carolina. So, that was many years ago back in 1988. But um but we're on the third version of our ultraviolet um disinfection system at the south plant. Um this is a bit of an obsolete design because we just have one channel. The state requires us to have two channels now. So we have redundancy. And so we're we're building a twochannel structure. And then um this big metal thing that you see here, this is what it all looks like underground. It's basically using UV light to disinfect the wastewater before we return it back to the stream. And so this was a pretty sizable contract and uh construction is set to begin on this in early 2027. Also over by the South Plant, uh we got the Optimus Farm water main and interconnection project. This is um this is a way for us to get a backup feed to the whole park at Westlake area. Right now we only have one water feed down there and um primary transmission line. And so this will give us uh an extension of this water line with an emergency interconnect with Holly Springs. And so this is a job we've been trying to get going for some time. It just helps provide redundancy in that area. Gives us an emergency backup if we need it. Very valuable project for us. And um and
I think it'll also help support future development in this area in the future. So again, this is separate from the Holly Springs Wastewater Study. This is a drinking water item and then and another interconnection that we'll have with Holly Springs.
Now, years ago when you were presenting something about wastewater and if you didn't have redundancy, you would and you had a break, you would have to truck it out and I want to say it was something like close to a million dollars a day or something. So, it made sense to be proactive to put in these redundant lines. M seemed like I remember that conversation years ago. But
yeah, back in uh back in 2006, we had a major problem with the Swift Creek pump station and we didn't have redundancy when the pump station failed and we had to do a lot of trucking of wastewater back then and it was very expensive and very intensive operation. So we uh we have lots of backup systems at all of our wastewater pumping facilities and um in fact we have a lot of redundancies even in our wastewater collection system. And so um so we're always evaluating and analyzing and it's also a state requirement to make sure that we have good strong contingency plans and resilience systems. So something we want to stay on the forefront of to make sure that we always have backups. Louis Drive water transmission main. Um this one's one that has been in our master plans for about 30 years. It provides a another important feed to the central pressure zone. This was um this was such a big project for us and um so glad to get that one done this year. Project was completed um completed on schedule. It was awarded by council in December 2024. And uh as Cassie noted, we also put in some sidewalk while we're working on this job. The old apex water man, uh this is a reinforcing line. Um this is one of those lines that kind of helps strengthen the resiliency of the water distribution system, provides another backup feed and um and so as we start out at the carry apex water treatment facility, we have these really large
pipelines and then we want to keep building that pipeline network so we have lots of redundancy coming into the downtown core and um and so some of these lines are just uh helping to reinforce the distribution network so we have more water feeds with more capacity coming into the downtown area. And so this is another project that we've been working on for probably about a decade. And um it was awarded also in um 2024 and completed recently and uh and DOT came in and did the repaving. So uh glad to get this one finished. Uh moving back to a sewer project, the Brier Creek sewer rehabilitation project. This is one of our larger sewer rehab projects in terms of diameter. Um pretty sizable project in terms of dollars as well. Um this one this one is an important artery from up around the airport area kind of traversing through Morrisville and um this is one of the older sections of our wastewater collection system. You know really happy to get this one done. This one's just completed last month. So um you know huge uh milestone to get this one completed and then annual water main replacement project. Um, you know, some of the ones on this list are actually going back to the Morrisville merger and actually filling in gaps between the Kerry the old Kerry water system and the old Morrisville water system. And so we've got it we've had all these little gaps and we've been filling them in and um and getting these water lines replaced along the way. But um but there was a couple of those um those that just filled gaps, but Shirley Drive was the big focus on this one. Um that was an aging water line that definitely needed replacement. Um it was a very um a very busy job for the community. We had to replace a lot of services. We had to replace the sewer line we were there as well and do the paving. So we it pretty much covered a lot of the municipal services while we were there. So um we are so glad to have that one done and um things should be really good at Shirley Drive for a long time now. All right. Well, um, at this point, glad to take any questions and, um, and
that's cool stuff. I love
Yeah.
I have a question for you.
Yes, ma'am. So out of so many miles that you maintain, how do you um are there some um tools or technology in place that you know that we need to fix this trip and in this year otherwise it's going to break and this is XYZ can happen like how do you identify those areas?
Well, first of all what we do with the water man replacements and also with the sewer rehabilitation program we just ask for a steady amount of money each year. Um, so with the water man replacements, it's about $5 million a year. With the sewer rehab, it's about six to seven million a year. And so that gives us the flexibility to go where the greatest need is at. So with waterbang replacements, the things that we look at are repair history, the age of the water line, um what are the materials of construction, how many other water lines need to be replaced in the same area. And so we like to find an area that has more of the need. It's not just one water line, it's a lot of water lines in the same area. And then we like to try to fix that community and and get that one in good shape and then we'll move to the next area.
But how do you find that the one that's aged? Like is do you have record?
We do. We have records. We got age stamps.
What's your asset management?
Asset management. Yeah. Make sure we use
dying to say something.
Yeah.
You could take all your assets and you can graph them and you could see the end of life.
Okay.
And so bad management is let all these things run to end of life. In other words, break. good asset management is be proactive, identify ahead of time, not only hit the ones that are aging, but the ones around it. And that's actually saves money in the long run. So, what they're doing is
and in some of our great points by both of you, in some of what we've talked about more recently in our um capital program, I always get this wrong, but look at Stacy. 20 years.
Yes,
we have in the back of your budget manual, you'll see a 20-year capital plan with most of these projects as
Jimmy, Jamie, uh Cassie, and anybody that does capital is projecting out to when they believe the assets um may have uh hit end of life expectancy during that time. So, they're tracking it and at least in that plan is where you project you may need to
uh change it.
Yep. And just following up on what the mayor and Russ have indicated, um, we can chart out on the map the age of the lines, the repair history, all of that, and you can generate a little heat map, and it tells you, it's very easy to see when you map it all out exactly where you need to go. [snorts]
I just want to do a time check that it is um 604. Okay.
Every time Jimmy presented, the first time I feel I was listening, what is that going on? But now several times I feel, oh, I got it. [laughter]
Absolutely.
No, this is all really great news and great that you all um choose to fund um you know, our capital programs the way that we do. I mean, we're very fortunate um to have the folks that do the work as well as the programs that we have to keep our assets in good working order
and to be proactive. that the citizens really need to understand we are saving them tons of money by doing all this upfront work rather than waiting.
Y thank you for doing that.
Yes, sir. Thank you.
And I just want to thank Jamie and Cassie as well. Uh a note for folks following along at home, especially for the first part of the presentation we heard from Cassie, a lot of those dollar figures that we saw, we didn't talk about the funding source for a lot of that. And so, you know, I could see residents seeing a high price tag for Kerry Tennis Park or our new bus operation center. Just understanding, we didn't delve into those details tonight, but a lot of those big projects come from dedicated funding sources, our regional transit dollars, our regional uh entertainment and sports venue dollars, and that a lot of that is funding some of those big projects. So,
not all price tags are created equal.
And you're given a shameless plug to follow along during budget season. Yes. So, you can follow where all those funding sources come from.
Great. All right. Uh Jamie, don't go too far because um I'm going to kick it back to Jamie uh to tell us a little bit. This has been making uh some rounds in the news, but just give us a brief update of where the drought may stand. Yeah, the good news u for Carrie and um and our um utility partners is um that we're doing good on water supply right now. Um Jordan Lake is a very resilient water supply. We um we got about 223 days of water supply remaining and um and that puts us in a really great place for now. Um we obviously are looking for some rain. We'd love to see that lake level come back up a little bit. put us down about 4 ft right now, but right now our drought status is um normal for us. We're in year round conservation mode. And so, um just to reinforce, water supply is in good condition. We um we are able to help our neighbors. Um we're sending water to Durham on a daily basis to help them. Their their days of water supply remaining, I think I read today, is down around 76 days. So, so they're in a little more dire situation. So, we're trying to be a good neighbor and help them. Um and um one other thing that I should mention is uh the core of engineers manages the um manages the release of water from Jordan Lake. Um and so when we get down around 212, that's a milestone for us because now we're operating on our lower intake level. And so that's really great planning because we have an upper intake and a lower intake. And so we plan for the level going down. And so our lower intake will keep us going for months and months to come. But um so we're we're good in that regard. We're safely operating on the lower intake. The core of engineers has stemmed the releases quite a bit because um you know as the lake level gets lower, they cut back on the releases going downstream and that makes sure that we help preserve the
water supply longer. And so the core of engineers is managing that very well right now. It's ever since we kind of got to 212 stayed pretty steady for the last several days. So uh so that's a good sign. And I should say I'm hopeful um because I've looked at the long-term weather forecast and I probably shouldn't say this, but there there appears to be more rain in December. You know, there's always hope. You know, there's always hope. You know, once upon a time, I did a lot of farming and uh you know, you you're always you're always very hopeful about next year's crop, right? So, uh so we are very hopeful about um December and January and February and based on all the weather forecast, it looks like the rain should be picking up during those months. Jamie, just for context, at what foot elevation would we move to another stage of conservation
when we have 120 days of water supply remaining?
Okay. How many feet is that
there? There.
It doesn't work that way.
It doesn't work exactly that way. So, right now, well, another bit of good news for us um is that we are using less water now than we did during the summer months. So, um, so our days of water supply remaining is is very favorable now because our demand is less. And so if our demand is 10 or 15% less now than it was during the summer, that means our days of water supply remaining gets extended out that much further. So that's really what it comes down to. It's an equation between the um the lake level, the amount of the water supply that's left in Jordan Lake and um and how much water demand we're actually seeing.
So to remind me how many days of water we have left today? 223.
And so we're we wouldn't move to a new
a trigger until we get to 120.
Till 120. Thank you. That's the context I needed. I appreciate it.
Yeah. I think I think the last time I looked up the number, Jordan Lake um Jordan Lake is enormous. It's like 70 billion gallons.
So very resilient. We have the most in my opinion, we have the most resilient water supply in the entire Triangle region.
And Jamie, is that information on our
website? I think you since you were talking about the web page here.
Yeah. Um I think that information is on this website.
Um obviously it says what stage we're in year round conservation but as you move to a next step in the water shortage response plan is where that information would be.
It it's all on our web page. Um and we have u we have several pages dedicated to drought water supply status. The water shortage response plan and usually most of them I think they're all linked through the various pages like at the bottom of this one you see the link to the water shortage response plan. I think we have about three or four web pages all dedicated to these topics
and there is um on the Jordan Lake one water web page they actually have all the water supply amounts uh sponsored by the core of engineers. So you can see because we're currently at about 700,000 users of the water which is expected to go to something like six million people by 2030. So, it's a significant but the but it's run by the but the water levels and all of that is managed by the core.
Yes, absolutely.
Okay.
All right. Thanks, Jamie.
Yep. Thank you.
All right. I have two quick updates or well, it's really one whole update, but just want to hit the uh our moving forward dashboard and some of the changes to the dashboard that are typically made on Fridays. And uh the past change was we've moved um three things to complete. That was Womble Bond, Dickson 12, 13 and 18. And then 16 has moved from um moved to development. Uh also just highlight the the work that you all did earlier in the week uh moving several of um the policies on this dashboard that will be changed this Friday um to a different phase. So that if you signed up for this, you'll get that information on Friday. Just want to keep highlighting what we're doing um and what can be tracked on our dashboard. And that's all I have for tonight unless you need a close session. That's all we
have. Not here.
I'm not sure we have enough time.
You would we would h you would have to delay the start of the regular meeting.
So I'm looking at you.
Is that what we're going to do? I don't think it's council.
Can we combine them? Can we combine the two requested items to the end of the council meeting
for the because we have a close session after the council meeting. Correct.
Um not a staff initiated one.
We could we could
Oh, I see.
We could move um to the start of your meeting and you could hold a close session at the beginning of your meeting if you would like as well.
Yep.
Yeah.
All right. Let's do that.
Okay.
All right. So, we'll adjourn this work session. Thanks everyone. Thank
Speaking at this meeting
Sign up for Public Speaks Out by calling the town before noon on the day of the meeting; each speaker gets three minutes. Comments that arrive after noon are passed to the council as correspondence instead.
Town of Cary's own rules for public comment — check them before you rely on anything here.
Agenda items (6)
-
1. Call To OrderProcedural
-
2. Upcoming Meeting Schedule ReviewProceduralStaff asked to add two work sessions in January, saying the council needs more time with staff that month. The full calendar is due for adoption in December.Two January work sessions added by voice vote
-
3. Discussion on Council Priorities Item(s): Capital Projects UpdateThe transportation and utilities directors reviewed general and utility capital projects by phase, four state DOT projects in Cary, and what DOT work costs the utility fund in line relocations. Council members questioned resurfacing funding and asked whether bond money could pay for street work.
-
4. Announcements from ManagerStaff or committee report Water and sewerThe utilities director reported that Cary's Jordan Lake supply is in good condition during the drought and that the town is sending water to Durham. The manager then pointed to recent changes on the town's council priorities dashboard.
-
5. Closed Session (if needed)Closed sessionThe council ran out of time for a closed session and agreed to hold it at the regular meeting the same evening.Not held during the work session
-
6. AdjournmentProcedural
Agenda changes
What moved between published versions of this agenda. Item numbers shift constantly as things are inserted, so only genuine additions and removals are listed.
-
50 days ago
- Retitled to "Work Session".