Regular meeting Appointments and personnelBudget and appropriationsParks and recreationRoads and transportationStormwater and floodingEnvironment and sustainabilityLand conversion and large developmentPublic facilitiesAnnexationContracts and procurementEthics and transparencyFaith and cultural communitiesFees and utility ratesGrants and outside fundingHousing and affordabilityIntergovernmental agreementsLitigation and settlementsSubdivision and site plansTransitWater and sewerZoning text amendment

What was decided

  1. Approved 2.VIRequest: 205 JA Farrell Street-Budget Amendment, Project Design Services, Asbestos Abatement, and Demolition Approved on the consent agenda
  2. Approved 2.VIIBudget Amendment: Water and Sewer Grant Funds Approved on the consent agenda
  3. Approved 2.VIIIAnnexation Petition: Pittsboro Baptist Church, Inc. A-2026-02, PB-26-400 Approved on the consent agenda
  4. Approved 2.IXPosition Request: Transportation Engineer (Added 11.9.2026) Approved on the consent agenda
  5. Approved 4.IResolution: Recognizing The Graduates of the Fall 2026 PBO-101 Citizen's Academy Adopted
  6. Approved 4.IIResolution: Veterans Day 2026 Adopted
  7. Denied 8.IVPB-26-243 Chatham Park South Village Section Design Plans (SDP) - 2.1, 2.2, 2.4, D2 Motion to approve failed; board asked for a full traffic study, proportionality agreement and travel demand model before approval
  8. Approved 8.VRequest: Chatham Park PDD-Amended and Restated Master Stormwater Agreement Approved
  9. Approved 8.VIMinutes: October 12, 2026 Regular Meeting of The Board of Commissioners Approved
  10. Approved 8.VIIRequest: Town of Pittsboro Board of Commissioners 2027 Regular Meeting Schedule Approved; the mayor expects revisions in December
  11. Approved 8.VIIIPosition Request: Recreation and Engagement Specialist Approved
  12. Approved 8.IXRequest: Volunteer Program Policy Revisions Approved as presented; staff to check whether a felony-disclosure question can be added

Another 5 items passed on the consent agenda, which is a single motion covering routine business. See the list.

Read from the agenda's recorded outcomes. Where the board published minutes, those are the record — this is a pointer to them.

What's on this agenda

Commissioners take up a review of alleged ethics violations by Commissioner John Bonitz over his conduct toward town staff at 2026 meetings. Mayor Kyle Shipp's memo asks the board to excuse him from voting, decide whether a violation occurred, and only then weigh any action, which could reach a resolution of censure. A closed session covers a lawsuit by Goodwin Land Holdings and Congruus, plus a grievance.

The consent agenda spends $128,300 to remove asbestos from and demolish 205 JA Farrell St. for the new Town Hall. It also starts review of a 41.6-acre annexation petition from Pittsboro Baptist Church and creates a transportation engineer post. Action items include Chatham Park South Village section plans, an amended Chatham Park stormwater agreement and a new recreation position. There are no public hearings.

Summarized from the published agenda. Read the agenda itself before acting on it.

Meeting recap

What happened, drawn from the records published after the meeting. Recording

Commissioners closed the ethics complaints against Commissioner John Bonitz without finding a violation. After excusing him from voting, the board accepted his apology on the second allegation and dismissed the rest. It also committed every member to ethics and board-staff training at the January retreat. Bonitz had apologized to staff earlier in the meeting, and six of the seven public speakers asked the board to take no action.

The board did not approve the Chatham Park South Village section design plans, about 1,700 homes and a private golf course on 1,300 acres. A motion to approve failed. Commissioners then asked for a full traffic study, a proportionality agreement and an updated travel demand model before voting again. For the new Town Hall they chose option three, the all-brick design, which the architect priced at about $450,000 over the original. The public survey had favored option four. After a downtown advisory board presentation on parking, the board voted to keep every space in the West Salisbury Street lot until it approves a parking study and master plan.

How the votes went

Agenda and consent agenda approved, including the 205 JA Farrell Street budget amendment, the Pittsboro Baptist Church annexation petition and the transportation engineer post. Resolutions for the PBO-101 graduates and Veterans Day adopted. Two motions from Commissioner Thurber passed: keep all parking in the West Salisbury Street lot until the board approves the parking study and downtown master plan, and have the downtown advisory board and staff draw alternative streetscape designs that keep all parking and keep or widen sidewalks. Town Hall: a Bonitz motion for option three with a north-side public entrance failed; option three as drawn then passed. Downtown logo sent back to the downtown advisory board for public input, with a PBO version. Bonitz excused from voting on the ethics item; motion accepting his apology and dismissing the remaining allegations passed. Chatham Park South Village plans: motion to approve failed; motion requiring a full traffic study, proportionality agreement and travel demand model before approval passed. Chatham Park stormwater agreement amendment, October 12 minutes, 2027 meeting schedule, recreation and engagement specialist post and volunteer policy revisions approved. All were voice votes; the captions do not give tallies.

Who spoke

7 members of the public spoke.

  1. A co-owner of a restaurant on Sanford Road said downtown restaurants cannot survive without nearby parking and that the free parking across the street was why his business located there. 1:15:02
  2. A resident and PBO-101 graduate asked the board to take no action on the ethics allegations against Commissioner Bonitz, citing his apologies. 1:17:05
  3. A resident of Austin Chapel Road who has known Commissioner Bonitz for over a decade said passionate disagreement is not unethical and called him an asset to the board. 1:19:07
  4. A speaker who has attended board meetings said the record did not show an ethics violation by Commissioner Bonitz and asked the board to take no action. 1:21:08
  5. A resident who moved to Pittsboro in 2025 and volunteers with parks and recreation asked the board to take no action against Commissioner Bonitz. 1:23:09
  6. A second resident of the same household praised Commissioner Bonitz for apologizing and asked the board to take no further action. 1:25:09
  7. A longtime resident defended Commissioner Bonitz's record on the environment and asked the board not to put constraints on his ability to serve. 1:25:09

Seven people signed up. Six spoke about the ethics review of Commissioner Bonitz, all asking the board to take no action. One restaurant owner spoke about downtown parking.

Read from the recording's automatic captions, which misrender names and numbers — "Kildaire" comes through as "kill dare". Treat a name or a figure here as a pointer to the video, not as the record. Members of the public are private residents and are not named or indexed.

Full transcript

Automatic captions from the recording, "November 9th, 2026 - Board of Commissioners Regular Meeting". Runs 7 hr 30 min. These are machine transcriptions, not a court record. They misrender names and figures — "Kildaire" comes through as "kill dare", and case numbers arrive as noise. Each timestamp opens the video at that moment, which is how a passage here gets checked against what was said.

Read the transcript (163 passages)
[0:16:20]

Good evening. Thank you all for being here this evening. We are at capacity for the room in chairs, so we can't add more. There are a couple other seats through here. um and we will get through some of the uh early items that I think some of you are interested in. So um sorry about that. And the a center is also full in other rooms for for additional capacity. So um I will call this meeting to order for November 9th, 2026 for the Pittsburgh Board of Commissioners. I'll remind the board that our code of ethics and rules of procedure calling us to treat one another, town staff, and public with courtesy, dignity, and respect. And I'll start with a moment of silence. If you'll please join me.

Thank you. Mayor Promper, will you lead us with the pledge of allegiance?

Everyone rise for the pledge. to the flag of the United States of America and to the republic one nation under God indivisible with liberty and justice for all. Thank you. [clears throat] [snorts] Thank you.

Right. For the regular agenda and the consent agenda, I've received requests to move item one, which will move to action item six, item two to action item number seven. Item one is minutes. Item two is the meeting schedule for next year for the board of commissioners. Uh item number 11 to action item number eight, that's the position request for the recreation and engagement specialist. and item 12, which is the

[0:18:22]

volunteer program revisions to action item number nine. Are there any other changes to the regular or consent agenda?

Okay, I'll take a motion to approve the agenda.

Thank you, Mayor Pro Tim Farerrell. Second,

Commissioner Huner. All those in favor say I.

I.

Thank you. And [clears throat] I'll take a motion to approve the modified consent agenda.

Move.

Thank you, Commissioner Huner.

Second. Second.

Thurber. All those in favor say I.

Thank you. Up first, we have our information items and we'll start with a report from the [clears throat] Pittsburgh Downtown Advisory Board. Good evening. Thank you for having us. Thank you to members of the Pittsburgh Downtown Advisory Board and our various teams and committees for being here in support. This is an update and these are some of the things we've done. [clears throat] I'm going to try to you have in your packet um the notes about this as well as an addendum. So I won't belabor those points. I'm going to try to hit the highlights for you. I'm going to go over some points and then we have Siobhan who's going to come some parking statistics followed by Greg Stafford who's going to give some observations and then I'll wrap it up and we will try not to take too much of your time. It was very hard to get on this agenda, so we want to be respectful of that in a few. I don't have much to say about the downtown advisory board policy. I'm I'm a little flumxed. Uh the board rejected the first draft. I

[0:20:23]

was asked to review it, which I did. And before I continue my comments, I would like to say there in no way am I pointing any fingers at Malia who drafted it. Malia is a lovely person, an amazingly hard worker. I commend Jonathan for hiring her. I think she's a great addition to the town. I'm not sure um why a new hire was put with drafting this important policy, but the resulting policy, as you saw, was cumbersome. U misinterpreted a lot of law and policy and I made my comments and then I asked Theresa to sit down with me and I came up because, you know, it's not too hard to cut and paste and make a policy. It's harder to to be thoughtful and distill it down and make it something that will be more appropriate to your volunteers instead of this 30 or whatever it was page document that is really restrictive and really um just horrible. So we made a six-page common sense version and we put that on our next agenda for December because we learned that the policy was coming to the board in December. So we needed to approve our version Pittsburgh Downtown Advisory Board first and then for whatever reason I learned today we were told to remove it from our agenda. So we did. So we have no chance to present that. I don't know why. I will leave that with you to make up what you will. That's all I'm going to say about it. That's all I really know about it. So moving on um to the downtown streetscape visit. Okay. So, we took a little field trip to Apex. Um, as you know, they're doing a downtown streetscape. We, uh, observed their progress. We met with the town and they explained, you know, a lot of very helpful information about how and what they did. In particular, we spent a lot of time going into the businesses and talking to

[0:22:24]

merchants and um, we learned a lot. The town of Apex was really thoughtful and deliberate in how they did their their plan for their streetscape. They put in a lot of protections for the merchants. They had a um like a digital sales plan to help them get through it. Uh really good communication. And so every one of the merchants, they they really did well on their talking points because all the stores said, "Yes, our business is down. Yes, it's a huge pain. Yes, the traffic is a nightmare, but it's going to be so cool. our streetscape is going to be so cool when it's done. It's worth it. So, they got their message across really effectively and um and we talked to them about parking. This is their project features. They've um leveled their streets and and it's all brick. It is um a lot more pedestrian. There's wonderful, beautiful sidewalks with space for tables and foliage. And they have some parallel parking. And of course they did their underground infrastructure. This is what it looks like on the left. Now this is what it looks like on the right when uh it's finished. And this visualization's a little misrepresentative. It is not a pedestrian mall. It uh that's you know representing an event. They did eliminate some downtown parking for this. This is what it looks like now. So you can see why the store owners are suffering a little bit. And they um and to make up for the parking that reduced downtown, they added parking lots within walking distance of the downtown. And you have their numbers there about 530 spaces total in the downtown. So it it [laughter] was great. And you know then this is one thing at our next PAB meeting we were giving this report and the Pittsburgh downtown advisory board barely ever as unanimous unanimous

[0:24:24]

about anything. But when I mentioned this sort of innocently innocently not knowing where it was going to how it was going to go. It was unanimous and and everyone was completely in favor and and that's why I think they're all here tonight. So, we have this streetscape and I'm imagining to myself because you are the commissioners, this is who it's going to come back down on. So, [clears throat] I'm imagining then uh all your downtown business owners are having these same problems, you know, the same construction blockage and and lack of mis business and and they're going to say, "What? Yes, it's a pain. Yes, our business is down. Yes, we're suffering. But by God, when it's done, we're going to have narrower sidewalks and less parking. Like, how's that work? that's not that's not what you want. Um, and I know it's going to improve the underground utilities and and level our sidewalks and that's good. But it just occurred to me that again, as I've mentioned before, Pab did not have meaningful [clears throat] input into this. We weren't part of it. And I'm not standing here trying to tell the town board what to do. That's not my place. There may be very many good reasons why we can't do something more like Apex did. I know we're not Apex. I know it wouldn't be the same, but my question is why did we not even look at it? Like maybe we analyze it and you guys say, "No way. It's too expensive." perfectly understandable and acceptable, but why didn't we analyze it and look at it and look at other options that wouldn't [clears throat] narrow our sidewalks, wouldn't take away parking, and at least when your merchants are suffering, they can have something to look forward to at the end. Um, so again, I that had been on my mind and I mentioned it at the PDAB meeting and it just caught fire and that sort of um led to us being here tonight and uh we're going to go into parking more as I mentioned. So let's go on a

[0:26:24]

brighter note. I hope you all noticed the little bit of Halloween that we did this year. A few eight or so months ago I read some statistics about Conway South I'm sorry it says North Carolina. It's South Carolina. Conway, South Carolina. And um a staggering number of dollars that came in their town when they did this Halloween thing. I sent it to Jonathan and Teresa and they were both really enthusiastic and supportive. So we did the little bit that we did this year, you know, just as a a start. It was really wellreceived by the town, all positive. So we went to Conway, a few of us. We met with the um downtown director who started this and I would love to give a fuller presentation to you later and not take up the town the time tonight um because we do want to work on this and expand it. But just a couple statistics they've been doing it for six years. They started during COVID just to lighten people's you know mood and they had 400 pumpkins hanging in trees. Fast forward to six years I think they have like 3,500 pumpkins in trees. When [clears throat] they began, they had zero support from the town board. They had the idea to rename the town for the month of October to the city of Halloween. Zero support. The mayor did it by proclamation. Zero town council members voted for it. In 2026, on their opening night on October 1st, they have a um [snorts] parade called the big booing. Every town council member was dressed up and marching. The biggest uh obstacle, as we learned, was getting the downtown merchants on board. Conway offered to pay their downtown merchants to stay open later, pay those couple hours at night, pay their employees. Zero takers. Now, every business is open late. Every business has their own decoration. They have these amazing tableau. Pictures can't do it justice. But, uh, here's the real thing. Six, this is a town of 50,000. 600,000 visitors came through that town this

[0:28:24]

October.

My gosh.

600,000. The I'll have more numbers later in the year, maybe when I can do a more full presentation, but the their main street is funded by a restaurant tax and a hospitality tax. Six years ago, their portion, it it goes some other places, the the main street downtown portion was $1.1 million. In 2026, it's $4.6 6 million. That's from one little tax or two little taxes and that's one entity's share of it. So, we would love to do that here. So, there's so many positive things going on and I really want them at the end of the day to outweigh the negatives.

Jesse.

Yes. [laughter] Um, first off, can you introduce yourself and your title?

I'm so sorry. I'm [laughter] Russell. I'm chair of the down the road downtown advisory board.

Breathtaking. 600,000 people. Isn't it

incredible during Christmas?

Yeah, do a Christmas thing, too. So, we're [clears throat] we're hoping to do all that. But, you got to start somewhere.

Um, and I don't know if you saw at Soo where Greg put up the big illuminated moon with the broomstick where you can pose for pictures and we got that from Conway. That that was one of their photos there. So, um, more to come. Yay. So, okay, more positives is um we installed three new art installations, sculptures, we had two downtown walking tours, and we processed three facade grants and three building rehabilitation grants. This is what you see here. Again, there are good and bad in everything, right? Um so we're we are hoping to get um again some consideration of alternate streetscape plans especially since it is now pushed off to 2028. Again not saying we what we should do just to let's please look at it. Let's please look at better alternatives just in case something's possible something better is possible

[0:30:26]

and let's not take away downtown parking. With that, I believe I'm going to turn it over to Siobhan. We do have handouts with all of these for all of you, which Carrie has, and she said you'll get them afterward. So, I'm going to let Siobhan take it.

Before you go, Kathy, one more question. You said tax revenue tax income. Is that sales tax income?

The for their main street comes from a hospitality tax and a restaurant tax

on the receipts or sales tax. Sales tax, right? On sales.

The sales. Sorry.

Hi everyone. I'm Siobhan Moore. I'm a principal and architect with Hops Architects here in downtown and I'm a member of the downtown Pittsburgh Advisory Board. Um I'm going to be really quick here. As Kathy mentioned, after learning um what the town of Apex did to prepare themselves for their streetscape renovations, um we thought it would be important to look at what our streetscape renovation um intended was proposing and uh compare it to what we currently have. So that's what you currently have in [clears throat] your packet. Um on the screen right now is an analysis of our current uh street parking along those same two blocks plus or minus of Hillsboro Street. Um these are the same two blocks that are um included in the NC DOT streetscape plan. So by our count and I did this several times, I got 56 parking spaces, but I put a plus or minus in front of that in case my cap might be off. you know, everybody um deliberates whether or not we should be parking in front of those trees, but those tree spots are are included in here. The compact spots are included in the 56. If we go to the next slide, we'll see that this is the um proposed streetscape plan. So, with all of the renovations, and that includes bringing some accessible spaces on Hillsboro

[0:32:27]

Street, includes all the utility upgrades, it includes some additional um ramps and stairs to uh navigate the grading. The parking count gets to plus or minus 42. So, that's a reduction of about 14 spaces. If I go back to our current streetscape, um we look to at where um the sidewalks really looking at the width of the existing sidewalks and then where we had some pinch points already. So in the new plan, we still have some of those pinch points that we currently have, but um our sidewalks really get to be a maximum of 12t wide. um they're widest kind of in front of on the east side of Hillsboro Street in front of Bank and Carolina Cravings and then on the west side it's more toward the south end of Hillsboro [clears throat] Street closer to the visitor center. Um and then in the proposed streetscape plan we actually have more pinch points. So I thought this is really important to show to you all. um we actually get points at which those same areas where we had 12 feet wide in uh sidewalks right now we have a pinch point of 6.5 ft. Um that's on the east side in front of Carolina Cravings. On the west side we have a similar pinch point but it gets down to something roughly about five feet. Um and that's out in front of the dance center. And that happens when um we start introducing uh ADA curb ramps to get ADA access up onto the sidewalks. We're hopeful that maybe we can avoid having that because having the sidewalk pinch down at those points when you're unexpecting when you're not expecting it can create a safety or tripping hazard on the sidewalk. The maximum width, this is by our measurements just um based on the drawing, right? So, this

[0:34:29]

is plus or minus. Um, but the maximum sidewalk width that we have shown in the current proposed streetscape plan is a little over 8t. So, we're looking at a reduction overall in the sidewalk widths. Um, and while there is improved there appears to be improved accessibility, we're concerned about those those additional pinch points that we have shown. So, we wanted to share that with you. Um you'll also have um some handouts to show potential ideas for maybe some other streetscape ideas downtown. Again, those drawings were put together by me. They are not I'm not a civil engineer. So, anything that we might do to improve upon this would definitely need to be engineered. But as an architect, I can look at it and kind of give an idea of something that might be possible. Say we went to parallel parking downtown. that we got more surface parking in the popup park. So, you'll see those in your in your handouts from tonight. I'm Greg Stav. Don't live in Pittsburgh. Um, but I do work and play here. And like almost everybody here, I have to drive to Pittsburgh. And when I drive to Pittsburgh, one would hope there'd be somewhere where I can park. I'm here because the public public parking is disappearing and the town's own documents prove it. You've been given a handout. Everything I'm saying here is footnoted in that handout from the documents that have been released. Let's start with the downtown parking study that was done in 2024. counted 1,345 spaces, 49 handicap spaces, and it said that the parking supply currently is meeting demand.

[0:36:30]

However, it also says now is the time to begin planning for future development and the town must be prepared to develop additional parking. Keep what we have and be ready to expand it. That is what the parking study says flat out. Now, look at the proposals we have. We've been told the town intends to sell the pop-up park. At the April 7th budget retreat, right after the Bolton and Mink presentation, the board heard this, if we advertise next week in RFQ to get rid of that site and [clears throat] start construction on it. Okay. And then the Bolton mink analysis that was presented here says it is that site [clears throat] is the best suited for earlier action. The parking study called the same lot an ideal lot for structured parking able to hold 500 to 700 vehicles. The public properties analysis [clears throat] says there is currently no intention to keep that site primarily for public parking. Words matter here. Public parking means parking where anyone can park. Shared parking has an entirely different definition. Shared parking means spaces shared by the buildings the on site, their tenants and their residents. In the 86page public park um properties analysis, the words public parking appears exactly one time in that sentence saying the popup park will not be kept for it. The drawing say shared. The pop-up park drawing show parking and this is a quote shared and accessible to both building footprints. That ain't the public. The courthouse square drawings show parking

[0:38:32]

located at the center of the block. Not one label says public courthouse square are the county lots at the circle where the parking study and I quote found the greatest concentration of all spaces about parking there. The public properties analysis says the town and county should determine whether parking con constitutes a public improvement, a development obligation, or a shared district resource. With respect, that question answers itself. We are a small county. Our business district is not surrounded by housing. People drive here. Asking whether downtown parking is a public improvement is like asking if oxygen is a public good. Without it, we will not survive. This town will not survive without that parking. It's 450 spaces that as the current plans sit will be gone. That's a third of what we have. On July 13th, their consultant for B um Bolton Mink said there was a parking study done relevant relatively recently and our recommendations are consistent with that study. I disagree. The parking study says plan for more parking. The public properties analysis removes public lots and promises none back. Some people say that the sheriff's lot can be a replacement. There are 108 spaces there currently. And in your package that you'll get later, there is a map showing a 1, three, and five minute walk from the courthouse. The parking study says all of the parking downtown area is in the five minute walk of the historic

[0:40:33]

courthouse district. However, many people, sorry about this, are not willing to park further than a block from their destination. The sheriff's office at 295 West Street is not on this map. It sits 400 ft west of Rectory, past the left edge of the map, well beyond the 3minut ring and outside the study area boundary. The parking study says many people are not willing to walk further than a block from their destination and the average visitor spends one hour. Your staff told you that mo the parking study looks for parking in a threeinut area of walk. The sheriff's office is outside the threeinut ring is a third of a mile outside that ring. It's dry. It's walking uphill. In Pittsburgh, when it's 95° and it's an uphill walk, people are not going to make that walk. They're going to eat elsewhere. They're going to shop elsewhere. And don't count on a parking deck. The parking study warns of the extreme cost of [clears throat] developing a deck at 30 to 50,000 a space, but the public properties analysis says public investment in structured parking is not recommended as a strategy to incentivize development in any scenario. So, if these lots are sold, nobody's planning on replacing them. We see nothing that shows a plan to replace them. 450ish, you know, that's give or take a few out of,300 and whatever I said earlier would be gone. This town cannot afford it and our merchants will not survive it. So, I'm asking three things tonight. one that y'all have a unanimous vote that no more public parking will be removed until it has been replaced space for

[0:42:35]

space within the threeminute walking ring of the courthouse. If we don't do that, nobody's going to invest in this downtown. It's not going to happen. [clears throat] Second, we hold every proposal for disposing of the town's public properties until the parking study update and the town downtown master plan is complete. And third, a commitment that every proposal for those public properties will comply with the parking study and the downtown master plan and not the other way around. Our own parking study says plan for more parking. Please don't continue planning for less parking. We can't afford it. The investors won't come. The public won't come. We will be destitute up there. Anyway, thank you. Thanks.

Thank you.

Thank you again so much. In closing, I would say again, it is not just unanimous with PEBB about the parking situation. When we had our downtown stakeholders meeting, that was the most number one concern was parking downtown. As Greg said, if you don't have parking downtown, your businesses will die. No one can keep a business if you can't have customers who can park to go there. And then when those businesses move out, no one will rent them because the same reason. So it is extremely important. And because I feel bad for things I said and I don't think I said enough good things about Malia, let me say I don't think anyone in her position could have done a better job. I hated that I said it was horrible. I will also say that if you guys want to have a work session on, I would be more than happy to sit down and go over the two and show you exactly why I think one's bad and something that I'm I'm am unable to do at another level. So, as an overall comment [clears throat] to wind this up, thank you Greg and Siobhan so much. I just want to say that again there's so

[0:44:36]

much good and and so much to look forward to and and I just feel like everyone in this room is someone that I like and care about and we should all be working together and lately it has not felt that way. I don't know why, but it has felt like there's actually intent intentional divisiveness to divide board members, to divide staff from board, to divide PAB from board. Um, you know, I I asked to give a monthly update, nothing this long, just a little update, and I was told no much [laughter] because other boards, you know, um, don't the cadence of other boards is different. I'm pretty sure the ABC board doesn't have as much going on as PDAB. So I was told quarterly fine quarterly would be great. Um but my bigger concern is lack of transparency and communication and what seems to be an intent and and for the life of me I've tried and tried and tried time upon time to figure out why or an angle and I can't. So therefore the theory makes no sense but yet I see it again and again. I hate it. I don't want it to be that way. I have tried some things to cure it and and some those are ongoing and perhaps will help. And um I I would just ask that we all keep in mind that we are all working to have a great downtown. Let's have a thing like Conway. Let's have it at Christmas, too. Let's have it at Valentine's, too. Let's have Do you think we could ever do that Halloween thing if we don't have parking? So I mean clear communication and transparency and working together as last time I spoke to you guys I said you know we all work really hard and none of us wants to do it if it seems like it's just eye candy and we're not meaningful and that is very much how it has continued to feel. I don't like it. I don't want it to be that way. This is me telling you I'm willing to do whatever you guys dictate or decide we can do to prevent it. I'm at your disposal. Pab is

[0:46:38]

at your disposal. I hope that we can get through this and fix it because I really do think this town is going to be awesome. So, thank you.

Thanks, Kathy.

The next two information items we have are the Boys and Girls Club quarterly report and the Town of Pittsburgh financials uh quarterly financials. Any questions on either of those items? Financials.

Okay, find my notes.

Okay. So, I I guess I'll address the town manager. These quick questions.

Uh, question number one. It appears that uh it it appears that for every $500,000 worth of assessed value for homes here in Pittsboro, uh, the town receives about $2,000 adorum tax, plus or minus, right? Yes, sir.

And um and then another $1,600 in sales tax. Is that about right? Sales tax is a little more difficult. It's trying to think parts.

That's about right. Right. Can't say off the top of my head.

Okay.

It's either between 650 and 8.25 per household or per person, but I think it's per household. It's a price lower than my estimate. Okay.

We we also have an account 850 of the general fund which is affordable housing. It right now has a cash balance in it as

[0:48:38]

of uh the end of September for $1,335,000 $276 and0. What is it that we're use? What are we expecting more funds from that? And what are we using? How are these funds being comprised? What what is it where is that money coming from?

I think several years ago um town manager at the time suggested that you you put one penny of your tax rate towards affordable housing each year. So I think that fund has been built up with that and also fee and loo from developers as they contribute.

Have you used any of that money?

No.

Okay. And uh so there's no plans for that million $1.3 million right now. Are we expecting any more of those funds to come in maybe fee in lie of or 1% taxing?

Well, the we want to put the 1 cent tax back in place for the next fiscal year. We did not do it this f fiscal year because things were so tight and because we had the large fee and loo from Corbett Landing I think that around 800,000

that went to where did that money go?

Went into that fund.

It was used for what?

Nothing.

It's being reserved for something. What is this? And well, one of the big things is our liability with uh affordable housing liability with Chattam Park, which I believe is $5 million. So, they will be invoicing us over the next life of

coming out of this this fund, the 1.3 million.

Oh, it will come out of this money plus others.

I'm sorry.

Total liability for the Chadam Park affordable housing element is $5 million. Um,

where's that has historically where is that money coming from? Historically nowhere because we haven't received a bill from them that we have paid.

But we have paid some of that bill. Is that correct?

No sir.

None of it. Okay.

That's expected to come out of the affordable housing advisor affordable housing eight uh the what account number 850.

[0:50:39]

So we are then about what 30 I'm trying to do the math. We still have a ways to go. 3,700,000 that we still would still owe if we used all this all the all all these funds.

Yes, sir.

Can you describe to the audience what that payback is for? I think we've done it before, but can does everybody hear me? So I guess the question is what is the five million for?

Yeah. Why do we owe town park money? It's $5 million.

I guess whenever the the elements were developed or the the master plan long before my time, uh affordable housing element was negotiated and that was um left pretty broad and that it was SDF fee reimbursement, which was fine when your SDF fees were $2,500.

SDF meaning

system development fees,

right? was fine when they were $2,500 um or 5,000 or even eight. Um but then when the study was redone four or five years ago, uh it showed that the SDF needed to be 15,500 because in the element it did not lock in a price. That means that the SDF fee that the town owed then escalated to that same SDF which was 15,500. Um turning our I think at the time an $8 million liability into 25 So that's when we sat down with Chattam Park a couple years ago. Took about a year of negotiating, but we negotiated that down um to I think 10,000 for one of the categories, 5,000 for another category, and zero for the largest category if memory is served.

[0:52:41]

Next question. Thank you for that. It needs [clears throat] to be clear. Next question is um online number item number 41. Well, I'll just say utility franchise tax. We have $300,000 budgeted. What is that franchise tax? Who are we levying when when we're budgeting for that?

Those are utility franchise tax that we get from telecoms. um uh and other utility taxes. It's all through the state. So we are not levying the tax individually.

Okay. So safe

portion that we get paid out by the state. Yes.

And do uh do we have uh you said telecom um we've had some interruptions in our services lately. I think Google fiber or other issues with that. Is that tied in? No. In any way.

It has no impact on us. Do we have any contracted liability issues with uh how they are conducting their businesses or not conducting some we've had some complaints insurance-wise, liability wise? What is what is our liability?

Yeah, we don't have any liability.

Okay. So, the $300,000 where would that money go?

Do you mean where would it go?

Like what do we apply it to?

Yeah, exactly. It's just paying for our department for our operating expenses.

So, it's going into the general fund. Is that thing? Okay. Thank you. Okay, any other questions? All right, up next we have a few

[0:54:42]

ceremonial items. The first is a resolution recognizing the graduates of the fall 2026 PBO 101 Citizens Academy. So, if you are one of them, please join me up front. CB 101. All right. This is a resolution recognizing the graduates of the fall 2026 PBO 101 Citizens Academy. Whereas PBO 101 Citizens Academy is a town of Pittsburgh civic engagement program giving residents a comprehensive understanding of local government across administration, the town clerk's office, finance, public works, parks and recreation, police, development services, downtown engineering and planning, communications, and the governing board. And whereas participants invested more than 15 hours over five weeks attending all classes to expand civic knowledge and skills. And whereas their active involvement demonstrates determination to understand town operations, a desire to contribute to governance and dedication to a vibrant engaged community and the democratic process. And whereas the program's success was made possible by town staff who gave their time to teach in the evenings. Now therefore, be it resolved, the board recognizes and commends the PBO 101 Citizens Academy graduates for exemplary civic engagement that strengthens our democracy. The board acknowledges the substantial time, effort, and diligence invested and applauds the graduate successful completion. And the board expresses its deepest gratitude to town staff for their invaluable contributions. So, the board hereby lists and honors the individuals who completed the PBO1

[0:56:44]

Citizens Academy. Um, as I call your name, if you'll step up and we'll receive your certificate. Dave Allen Michelle Carter Fernando Navaro English Galen Aren Gross, Jim Gross, Laura Ham, Carolyn Pimton, Bob Pennington, Dan Stro,

Melissa Tatum and Ann Marie Warren.

I'll take a motion to approve this resolution.

Thank you, Commissioner Holy. Second, [laughter]

Commissioner Bonds. All those in favor say it.

I [clears throat] like you all like

[0:58:51]

Thank you. got the music playing.

Thank you to to all of them for putting their time into that program and especially to staff as well for putting it on. Up next, we have a resolution. We we should have more seats open now as well for some of you. Um uh we now have a resolution recognizing Veterans Day. Whereas the freedom, security, and liberties enjoyed by the citizens of the town of Pittsburgh are preserved through the dedication and sacrifices of the brave men and women who have served in the United States Armed Forces. And whereas throughout our nation's history, millions of Americans from all walks of life have answered the call to duty, leaving behind their homes and families to serve our country and protect the freedoms that we enjoy today. Whereas whether serving in times of peace or conflict, our veterans have demonstrated extraordinary courage, resilience, and patriotism through their service to our nation. And whereas the sacrifices of our veterans are shared by their families who have provided unwavering support and endured periods of separation throughout their loved ones service. And whereas it is our responsibility as a community to recognize, honor, and thank the veterans among us, ensuring that their service and sacrifices are remembered and met with the respect and gratitude they have earned. Now therefore, be it resolved that the mayor and the board of commissioners for the town of Pittsburgh do hereby declare November 11th, 2026 as Veterans Day in the town of Pittsburgh and encourage all citizens to reflect upon the service and sacrifices of our veterans, honor those who have worn our

[1:00:52]

nation's uniform, and express gratitude for the freedoms their service has helped preserve.

Amen.

I get a motion to adopt the resolution.

So moved. Uh thank you uh Commissioner Frell.

Second.

Commissioner Huner. All those in favor say I.

Thank you. And there is uh quite a few events happen last weekend um around Veterans Day and then a couple um happening uh tomorrow and on Wednesday for Veterans Day as well. So keep an eye out downtown. Um and we have the um Veterans Memorial down along West Street as well. So appreciate all those activities. The

flags Um, up next we have citizens matters and we'll start with the manager report.

Thank you, mayor. Uh, just a few housekeeping items. Uh, November 11th uh will be closed for Veterans Day. November 26th and 27th will be closed for Thanksgiving. got the BOC uh budget scoping coming up on December 2nd at the Wednesday at 6 PM and then the uh Pittsboro uh parade is Sunday, December 13th at 3 p.m. Thank you.

Thank you.

Uh my report is next. It was a very busy fun month in uh in Pittsburgh. So October 16th we had finally Fridays downtown. We finally got the uh ice cream contest in. The weather couldn't stop us this time. And then that was combined with the pet parade and the costume contest. On October 17th, we celebrated the fifth anniversary of the Boys and Girls Club in the town of Pittsburgh and had a special visit from Mickey Mouse. So, I was able to welcome Mickey Mouse uh from from Disney to Pittsburgh. On October 22nd, we had a ribbon cutting for the Boys and Girls Club basketball court. Bowen Engineering uh completely designed and built that for the club and for uh George Moses Horton High School there or George Moses Horton Middle School on October 22nd. I also attended

[1:02:53]

Web Squared's fifth anniversary uh celebration they had a couple weekends throughout the time we had a circus in town. So I hope some of you are able to catch that. Uh that was really entertaining. And October 28th I attended a webinar on the legislative changes that have happened over this last year. about the various bills including budget correction bills um put on by the North Carolina League of Municipalities. October 30th was Principal Watson Day in the town of Pittsburgh. So uh as part of National Principal Month, we did that and the whole Pittsburgh Elementary School um was able to surprise the principal with a uh with a special activity. So that was really fun to be a part of. October 31st, of course, we had our fall festival downtown. Um really really great event with an amazing turnout. Uh November 7th there was a lot of filming around downtown you might have noticed for upcoming promotional video and we also had a rodeo in town. So lots of fun stuff. Uh the next couple to end of this week I'll be at the NC Idea Conference. So working with our our partners there on continued u innovation economic development ideas. And then November 18th, I'll be attending a refresh on the mayor's academy and a new course, commit to civility 2. Um, I was a little bit surprised to get noticed that they are starting the EPA local government advisory committee up again and I've been invited to participate in that again on the small communities advisory committee. So, we have an orientation on Friday and that um that advisory committee at the national level will be starting up again. Uh I'll let y'all know what that means after orientation. So, um we are planning an upcoming retreat for our board on January 21st and 22nd. We are partnering with the UNCC school of government, the North Carolina League of Municipalities and Central Pines Regional Council to do uh training for

[1:04:53]

the board and uh different activities, a commit to civility training and then we'll also start on updating our uh strategic plan that we put in place a couple years ago as well. So, more to come on that.

Mr. Huner,

well, I did not have the month that you had. Um I uh immediately after our last meeting, I went out of the country and uh was not here to participate in a lot of things, but I did make it back in time to go to Fall Fest and it it was great. It was one of the best. Um it was incredibly enjoyable. So I was a little jetlagged, but I did get an opportunity to go down to that. Um while even in uh Istanbul I was still following the concerns regarding uh Google fiber and uh all the damage being reported by residents. So this past Friday I accompanied uh Mayor Armstrong as she uh surveyed some of the damage in Chattam Forest and Powell Place. And uh I I don't pretend to know what the ultimate solution is to this and I know that AT&T is uh coming right behind them, but I do want to commend our staff uh public works, Jeff Harris, uh May Armstrong, um everybody else and Jonathan Franklin for being so prompt at responding to the town's concerns. Um I know it hasn't been easy. Um, but you guys have done a phenomenal job in responding and I just wanted to recognize that it can't be easy because people do get upset. So, thank you so much for that. Um, I think that's pretty much all I have done. Um, uh, yeah, sorry it was, uh, I wasn't really here, but um, thank you guys again for that.

Thank you, Commissioner Bonds.

Yes. Um, I want to echo that, Commissioner

[1:06:54]

Hunzer. The uh efforts to respond to the very unfortunate horizontal drilling issues uh were remarkable and I gather that it's extraordinary and um I know that it's very challenging as well. Um, and in my neighborhood, uh, it has been appreciated. And I mean, um, nobody likes to have their gas gas line severed. Obviously, the communication severed. So, keep up it. Great work. Thank you. Um, I also want to take a moment of personal privilege to speak directly to our town staff. Last month, I apologized to our parks director, Katie Keller, for my comments in past meetings. I was informed that she would be here tonight. I'm sorry that she isn't so that I can't direct this to directly to her. At that time, I admitted that I made a poor choice of words and I should have expressed my concerns with greater care and respect. Again, I deeply regret that and I apologize. She and our staff deserve better for me and I intend to show that through my actions. To our whole staff, I also also owe you an apology for the regrettable example those comments set. How we speak to one staff member matters to everyone who works for our town. and you deserve courtesy and respect from your elected officials, including when we disagree. I deeply appreciate your work. Deeply appreciate your work. And I'm sorry. I deeply appreciate your work for Pittsburgh and for our people.

[1:08:57]

And I regret that my words did not reflect that appreciation.

[clears throat]

Going forward, I will choose my words more carefully. I'll listen fully and I'll pause before responding when I am frustrated. I intend to keep my comments focused on the issues and express my concerns respectfully. I know that saying this tonight is not enough by itself. What matters is how I conduct myself afterward. That is my responsibility. I take it seriously. Thank you for hearing me. And finally, uh, a surprise, um, to the members of our community who have come out in support tonight. Uh, I see you. I appreciate you, and I'm humbled by your presence. Thank you.

Thank you. Thank you, Commissioner Frell. Just with the ABC uh board, we do have an opening in our account. We need a uh 32-hour account has not been filled. Is that correct? Is [snorts] it's is posted on the town website also. And um the fall street fair, the Rotary Club, outstanding job with that. Hats off to them. It was enjoy. I spent several hours down there, so saw a lot of people in town and it was good to see all the fun and activities that were going on. That's all I have right now.

Thank you, Commissioner Foley.

Two items. Um, the the Chattam County Economic Development Corporation hosted a uh a donor appreciation uh uh dinner and uh this [clears throat] a week and a half ago. um their goal, their mission is important to us to uh to mitigate our our taxes, making sure that we have

[1:10:59]

strong, powerful taxpayers coming into Pittsburgh that can help the property owners uh get some tax relief. The the second thing uh is that um the affordable housing advisory committee is discussing right now uh awarding monies uh annual monies uh to specific housing trust fund candidates. We're in the process of deciding exactly who will will get some. Hopefully Robert's run for Chattam Habitat for Humanity get some just a bright shiny star for the town of Pittsburgh that's right behind that. That's 72 town homes being built right behind True Value within walking distance of the circle. So, I hope we can support that. That's it.

Thank you.

I would also like to chime in on the U Rotary Club's amazing event that they held. Um, it was great. I also spent several hours there. It was the best fall fest I have ever been to. The bands were amazing. The vendors were amazing and just just I know how much time and effort goes into that event and I appreciate it. I know you guys are volunteers doing the best that you can and you did the very best that you could do. That was amazing. I will follow that with um don't forget about the tree lighting which is November 22nd from 3 to 6 pm um hosted by the Pittsburgh Business Association and we have many many great sponsors this year. We're really excited. We have a big surprise for everyone at the end of the treelighting. So make sure you

well Santa will be there. Yes, there'll be lots of things for everyone to do, including um you know, well, you just have to come and kind of see what we're going to do, but it's going to be a lot of fun. I can promise you that. Every year it gets bigger and bigger, and I'm

[1:13:00]

I'm super anxious to uh to get to November 22nd. Um next, I have an update from the Cadam Chamber. Um the small business grants, the applications closed on October 31st. the Chattam Chamber grants of $2,500 to help existing small businesses modernize operations to seize new opportunities in our community. They received 63 applications. They will award uh they will give 10 awards and they will name those at the end of November. The grants are funded by the Duke Energy Foundation. Thank you Duke Energy. Um, there is also a state legislative forum. Uh, please mark your calendars for Thursday, December 17th from 4 to 7:00 p.m. at the Skyrim in Pittsboro uh for the second annual state legislative forum featuring Senator Natalie Murdoch and Representative Robert Reeds, followed by a local government appreciation reception. I went to this last year and it was great. It was really uh nice to meet Natalie and uh Robert Re. [clears throat] And that's it. Oh, I have one more. Uh tomorrow the business after hours is going to be at Chattam Mills and it is sponsored and hosted by um Bold and that is tomorrow evening from 5 to 7:00 p.m. Thank you.

Thank you. Up next we have public comment. We have seven people signed up this evening. At the beginning, please state your name and address. There's a time limit of three minutes which will be displayed on the screen. In the interest of time and fairness, it's the board's policy not to respond directly to comments during this period. Staff will follow up as appropriate. Any speaker with handouts can give them to the town clerk and they'll be distributed to the board at the conclusion of the meeting. Up first, we

[1:15:02]

have Donovan Favre, followed by Gary Simpson. Hello and thank you very much for letting me be here. Uh the first thing I want to say is thank you. So the town council mayor uh staff all helped us open our business doories. We've been we're at 56 Sanford Road. My name's Donovan Faver and it was very helpful and great for you guys to help us and the community has been great in terms of coming coming out and seeing us. A couple things I wanted to do. We are a small business. We're owned by myself and Sammy and Kristen and Steve and Lisa. Uh other than me, all four work in the business regularly. It's their livelihood. Point number one, restaurants don't survive without parking. It is an absolute truth. And when we're talking 1 to 2 minutes to walk there, somebody has to walk 5 minutes, they have to walk a/4 mile, [clears throat] it's death to the business. So it's not just death to our restaurant, it's death to every restaurant. So if you want downtown to have restaurants, they won't be there. The second point I'll make, and this is the final point, we wouldn't have come here. If I hadn't sat there and looked across the street and saw all that beautiful parking and easy to get to and it's free and there's plenty of spots and especially after 5:00, it made it so easy for our customers to get there. It made it a selling point. So, it is an existential thing for a restaurant. It's life or death to have that parking and I wouldn't have come here if you didn't have that parking. So, I [clears throat] just want to make those points because those are absolutely true and clear. Thank you very much. Appreciate you.

Thank you. Jerry Simpson.

We're open till 10 tonight. [clears throat]

Good evening, friends, neighbors, public servants. I'm Gary Simpson residing in 82 Cynthia Lane in Pittsboro

[1:17:05]

and um a former graduate of Pittsburgh 101 along with some I see here. Nobody was here at that time to play the Olympic theme for us.

Thank you, Amy, for doing this. I'm here tonight to speak to an agenda item entitled review of alleged code of ethics and conduct violations. And uh I must say that uh even though I'm a bit disappointed to see that uh that matter has been raised to the level of a public board meeting, I've done my due diligence in taking a look at all of the materials that have been put online for public scrutiny. And having done that, um I understand that tonight the board is directed to come to a decision as to whether the allegations are valid. Allegations that have been made by members of this board, members of the town staff, members of the community itself against uh Commissioner Bonnets. And I understand that should you determine that these allegations are valid indeed that under section 15.5 you have five options. They read as such take no action. Issue a letter of concern. Require corre corrective action such as training and apology. Modify internal appointments liaison rules or committee assignments. and fifth, adopt a public resolution of censure. Now, given that Commissioner Bondance has received this notice of concern, that he's recognized the need to make amends, that he's publicly apologized here and in many other places, that he's working in good faith

[1:19:07]

to address all of these concerns. I would urge you as a board tonight to choose option one, to do nothing else, take no action further. Having been around the community for a while and observed the working of this board over many years, observed the work of Commissioner Bonnets for many years, I've come to value a lot. I've come to value his preparation. I've come to value his knowledge and wisdom. I've come to acknowledge acknowledge his voice for the people. Sometimes even zealously, but a voice for the people. And I uh also think that he's a quick learner. And I suspect that tonight he has one.

Is Connie McAdams follow?

Good evening. I'm Connie McAdams. I live at 597 Austin Chapel Road. I'm here tonight because I absolutely support ethical behavior at all levels of government and I support appropriate consequences when there are infractions. However, I also recognize that there is a huge difference between passionate and educated support or opposition to an issue and unethical behavior. Differences of opinion are expected and are certainly ethical. I have known John Bonnets for well over a decade. I have observed his work on this board and have had many individual conversations with him. I have even asked him things he refused to answer because it might not be appropriate. In my experience, John is always

[1:21:08]

wellinformed, a patient and respectful listener, and a powerful advocate for the town of Pittsburgh, its residents, and its environment. To John, I say thank you for your public service to our community. To the rest of the board of commissioners, I ask that you recognize John as an asset to this board, to the town of Pittsburgh, and to the community at large. He has earned our respect and our appreciation. Thank you.

Smith, followed by Amy Allen.

[clears throat]

Mayor Ship and the members of the board, uh, thank you for this opportunity to speak. Um, I've attended several board meetings and observe Commissioner John Bonnets advocate passionately on issues affecting Pittsburgh. From what I've personally witnessed, I have not observe conduct that I believe constitutes an ethical violation. Um, as a leader who also serves in a public-f facing role, I believe ethical leadership requires accountability, mutual respect, and a fair, transparent process. The allegations in the me in the memorandum memorandum attached to today's agenda concern meetings dating back to May of 2026. What specific statements or actions at each meeting allegedly violated the town's code of ethics? And what efforts were made to address those concerns when they occurred? Concerns about disrespect deserve consideration. However, feeling offended alone does not establish an ethics violation.

[1:23:09]

At the last meeting, I heard Commissioner Bonnets acknowledge his and at this one acknowledge his shortcomings and express a willingness to do better. For me, that demonstrated contrition. I have not seen sufficient evidence to establish an ethics violation based on the record presented. I respectfully ask this board to take no action towards this allegation. Thank you. Up next is Amy Hen followed by Dave Allen.

Hello, my name is Allen. I'm 532 Main Farm Road and I moved to Pittsboro in September 2025. And from there I have come to meetings. I've listened to them or I've watched them online. I've read transcripts and I love this town. I love working with the parks and open space parks and recck department and John Commissioner Bonnets was one of the first people I met and he believed in having a voice for Pittsboro and he holds himself I don't have to say this. He said he holds himself to the highest accountability. And I just want to say I love being part of this town. Thank you for the opportunities that the staff and the commissioner has given me to help support this town and I hope that you choose number one for doing nothing. Next is Dave Allen followed by Carol.

[1:25:09]

Uh, good evening. I'm Dave Allen, also 532 May Farm Road. Um, Amy shared a bit of our story with you. Um, you know, the town we moved from, I lived in for over 20 years and I had little care or concern for how they ran it, just status quo. And coming here, I've met and gotten to know so many staff, commissioners, community, and we've come to love it. And I think everybody loves this town. Everybody who's here, everybody's passionate. I think we're all trying to go the same place, the same, you know, we all have the same goals. Um, and I just I appreciate John taking responsibility and apologizing for his actions and his decisions to improve and move forward. And I think uh that's really an outstanding example for for folks to follow taking accountability and I would encourage you to decide not to take any further action. Thank you. I hate to disappoint Park. I am not going to speak about Southern F on the roads. I'm not going to talk about that. Good evening, Mayor and instead. My name is Carol Pepe Huitt. I live at 424 John Road and I am here to speak to the ethics review of Commissioner Bonis. John has more integrity than rooms full of people this size. As best I know, John is the first professional environmentalist we've ever had on this town board, and he comes here with a level of knowledge and expertise that we have only seen a very small portion of. He's made mistakes, and sure, he has shown up at meetings

[1:27:09]

after a long stressful day at work, a commute, through the triangle without supper. uh he has somehow struggled to remain inquisitive, intelligent, thoughtful, patient and civil when the BS was flying and only the gravest scrutiny could protect us from some of the stuff that has passed around this room in the last 10 years, 10 or 12 years probably. Yes, he has. Now, you know me, you all know me. I would not make a good politician. I do not have the patience. You've seen me lose my temper, some of you. I would [clears throat] not I would be on my feet shouting at some of the cockami that has come before this board over the last 45 years. Not John. I have been in awe of his ability to keep asking questions to patiently listen to answers and often ask hard questions more than any other commissioner I've seen actually even when they were unpopular. Except for Jay. You're all newbies. I just want to tell you, you stand on the shoulders of the hard work and contribution that John has made over the last several terms.

You should be thanking him at every meeting for the things he has done to protect the environment in this town, for the way he has stood up for the well-being of the people of Pittsburgh, including yours. You are dang lucky he's willing to serve you and with you in this very demanding role. If the tables were turned, you can be sure he would not play small. That seems to be happening. It could happen here. Putting any constraints on his ability to serve with you is like cutting yourself off at your knees. It's foolish and it's dangerous more than ever at this at this point in town with the glo grow growth exploding as it is. We need collaboration. We need education. We need patience with each other. This is not has not been and is not going to continue to be easy. And more importantly, you need to have each other's backs. Tonight, I expect you to show your true

[1:29:10]

character and to show John the respect and gratitude he deserves. I would stand up for you as well, and you all know that if it was warranted. I respect all of you, and I expect to see the best of your moral fiber. I know it exists. Please don't prove me wrong. Thanks. Next we have some presentations. First is on transportation on demand from Anna Tester.

Hey, good evening. I'm Anna Tester. I need to do this. Okay,

I'm Anna Testerman. I'm the executive director with Chattam Transit Network. Just here to give you a little update on uh Transit on Demand, lovingly known as Dodd. Uh we kicked it off [clears throat] in October. So what is it? It's a same day ride. So you think of it kind of like Uber. It's an app. You download the app. You schedule a ride for that same day. The cost is $5 per ride for group. So you can schedule your ride if you've got Right now we're using an eight passenger. you've got eight people at your home, you want to go somewhere, it's going to be the $ five dollar. The app launched in September. Service began in October. Um, so we've had some little technical issues. I want to say thank you to Mr. Franklin because he has been a huge supporter of Todd and utilizing it and has been

[1:31:11]

helping us work out some of those kinks. I know Mr. Ship, I think, has used it one time. Um, so we we've been getting some of that together and it seems to be working a lot better. Uh, our hours of operation are listed. So, Monday through Wednesday, we're offering it from 6:00 a.m. to 8:00 p.m. Thursday 6 to 9. Friday 6:10. Saturday 11:00 a.m. to 10:00 p.m. And then Sunday from 1 to 6. Our service area is the town of Pittsboro extra territorial jurisdiction. So it's roughly a threemile radius from the historic courthouse. This is a good look at kind of what the app looks like. The app is actually called Todd powered by CTN. You can download it in the app store and then you go in on your phone. You're going to create an account. It gives you the option to uh select your ride and you can you have the option to either pay then or you can pay the driver. So right now the this is ride data from October 1st to October 18th. So you're seeing two columns here because the the town is only funding the rides Thursday through Sunday. The Thursday rides start at 5:00 p.m. The Friday rides also start at 5:00 p.m. We are utilizing our own funding to fund the rides we are offering outside of those hours. And as you can see, kickoff has been kind of slow. So, we're working on that and hoping to increase some. I did pull the numbers through yesterday and um the CT funded total is now up to 25 and the town funded total is up to 30. So it has increased so we are seeing a little bit

[1:33:12]

of increase with that. So the funding is through a CMAC grant. Uh there's a federal amount the local match which is the town provided for a total grant of 175400. Right now if we keep the service where it's at with the one vehicle my expectation that we could fund this through spring of 2028. That could change if we found that it was doing well and we wanted to increase the number of vehicles things like that. then we, you know, of course that the length of time that the grant would fund would go down. Um, and then of course you're seeing here, these are the actual days and times that the grant is covering. Moving forward, um, I'm hoping to work with the town some on help some help with marketing and maybe getting it out there and doing a little better advertising. We do have the Todd logo on the vehicles. We've put the flyers out on our vehicles and then we've gone around trying to put flowers the flyers out in town. Um we'll continue to monitor and evaluate the ridership. Right now, as it stands, we're going to continue to monitor the part that our organization is funding and there might be a possibility that we reduce those hours and focus just on the the hours that are grant funded. Um the future possibilities, this would be a really great route if it takes off and it's something that we see continuing into the future. I think this would be a great opportunity for child transit for an EV. Um, this would be the place we would begin looking at putting a dedicated EV fleet for this specific route. Um, and then of course we would look at the possibility of increasing

[1:35:12]

the service, the days and times. And that's all I've got. Any questions I can answer?

Want to say thank you. this has been a long time in different iterations and shuttles and um so thank you for your perseverance in getting this going and it's a really [clears throat] helpful in the in the town

and uh if I could um I'm so excited about this. I run a chiropractic practice here in town and frequently hear um issues from people who have to try to find a ride. And it was interesting not maybe a week ago or so I had somebody really trying to find a ride back from the clinic and we called the number because I totally forgot that there was an app and I was like wait there's Todd and then we ended up calling and and we were able to get her a ride. Um, I would love to get a QR code in places like doctor's offices and and dentists because um, healthc care is something that's really important and having access to health care is extremely important and getting people back and forth from their appointments and having that QR code. I I know this could be so valuable to to patients. So, I thank you for this uh this service. I'm excited about it and I'm I'm sure it's going to get utilized a lot more once the marketing comes out. I think so too. And that's something we can definitely we can reach out to our software company about creating that specific QR code

that would take you straight to our app for that too. So yeah, and we are

I pulled it up. Yep.

Did you It's hard to find some at at first and we have to

COD Chadam Transit

Howard. Yeah, there you go. Yeah. [clears throat] Mr. Testerman, I want to especially thank you because uh you know, I've been urging you to to do more and more innovative things and to to really uh start uh

[1:37:12]

moving into the future because we're going to grow so rapidly and we really need to to have these kinds of services available. Deeply grateful for the progress that you've made. I want to commend you for it. Um very grateful also to Mayor Ship for your pursuit of the grant and um you know it just occurred to me uh after I saw the announcement uh that it was uh the last time I needed such a service was just before it began. Unfortunately I had to put my car in the shop and and I ended up walking to the to the shop but uh that would have been really handy. So I'm really excited that we've got it now and that I can can rely upon it. Thank you.

[clears throat]

Thank you, Ann. Thank you.

Up next, we have a response to the UDO policy and regulatory requests from the board of commissioners. May evening, mayor, commissioners. May Armstrong, development services director, and I'm joined by the planning director, Kevin Lewis. Um what we would like to do is go through what questions you have. We've given you kind of the outline of the different areas and then how we are going to how we identified what is required the gaps and kind of what the response should be for those gaps.

Great. Uh so previously um it was identified that there were three major items that needed to be discussed. transportation related uh requirements from the UDO, fiscal impact analysis and then storm water w waterershed protection. Uh at one point we were planning to do targeted UDO updates kind of peace meal. Um, but as we dug into this more, we decided that a rewrite of the UDO was a more useful

[1:39:18]

use of our time. Uh, so within this report, we highlighted some of the big picture items for transportation. Um, we've talked about transportation impact analysis requirements. um what uh kind of guidance that we have, what we use uh to determine when TAS are required and what kind of uh weights are added to those, the level of service that we look at for new and existing uh infrastructure. Um and what kind of improvements we look for from TAS. Um we also talk about parking. As you know, uh, state statutes updated this year remove our ability to require a minimum amount of parking spaces for new developments, but we can still regulate the maximum number of spaces that would be allowed, the design of parking lots, the placement of parking lots, landscaping and screening around those lots. Um, so those are all things that we will look to update our UDO, modernize those and make it um so that parking is provided and its impacts are limited. Um, a fiscal impact analysis is another item that was discussed previously. Um, this would be a great tool for the board to use in the future when it comes to budgetary decisionm. Um, there's limited uh, state statute power that would give us the ability to require or to u have meaningful outcomes from a fiscal impact analysis. But it does does provide a good opportunity to uh look at the in look at what kind of impacts are going to be coming and then help the decision-m process um from that perspective. And then finally a comprehensive watershed plan. Um again this is something that's identified in the future land use plan and other elements and is something that we've been working on for some time. I know that we have started the MS4 permit process with the

[1:41:18]

state um and have been looking at ways to conserve more land. We have a conservation subdivision ordinance update coming in the next couple months. Um and so we would look to again wrap all of those items what we can into a UDO update. We have released an RFQ um who are starting to receive uh solit solicitations back from interested uh consultants. That RFQ period ends this Friday. So we've already gotten one. We've had a lot of dialogue between us and consultants. Um so I'm really confident in the ability for us to move forward with that. We're going to be building out the timeline and kind of highlighting the touch points over the next few months as we work with those folks. Hopefully kicking off that whole process early next year. Um I'm happy to answer any questions about any of these items um may as well if there are any at this point. Um yeah, if I could regarding the parking um because we heard a lot about parking tonight and I take those concerns extremely um seriously and um I understand the maximum number of parking spaces. So that would be something um more in line with the big box store. Correct. Right. So if minimum parking spaces uh is not permitted for us to do, how are we going to ensure that we have parking for anybody who wants to put in a new business or our existing businesses? Um how do we encourage I know we can't mandate it, but how can we encourage parking?

Um so I think the market's really going to drive the minimum n minimum number of parking spaces. I know that the general statute update again took that ability for us to regulate that away. Um, but most developers and most financers

[1:43:18]

and uh uh businesses still require a minimum number of parking spaces. Um, so I don't think we're going to see a huge huge reduction in parking lots, number of parking spaces throughout town with new non-residential development. Um there's certainly the possibility of that uh in downtown. Um but looking for ways to incentivize uh developers by allowing things like increased density um and having more parking spaces as a result um reducing recreational open space requirements um and looking at ways within the UDO to partner [clears throat] with developers so that we can rightsize parking

and will the parking study that's being done also make those recommendations and encourage Will will that will will um will that include more recommended uh rather than some go I can get away with three. Will there be recommendations on what we believe or what the town believes it needs to support those businesses

or the parking study or

Yeah. Will the parking study back up the need or make the recommendations um to encourage that that that uh how did you put it? Um

driven driven versus Yeah, I can't speak to the parking study myself. Um I've not been involved in that. Um but certainly in my past experiences with updating the UDO um looking at uh updating UDOS's and other jurisdictions looking at those specific items that we know are issues like parking and watershed protections everything like that. Um there is a lot of time and effort put into determining kind of what is best for the municipality. Um, this is going to be a very public intensive process where we're going to be bringing you all

[1:45:18]

updates um and having public meetings and working with our partners across town to make sure that the new regulations are meeting their needs and expectations. Um, so we certainly are aware of the sensitive nature around parking. Want to make sure that we're providing that. Um, we can also require things like on street parking with developments um, especially in the downtown area to add more public parking within the existing rightway um that both the uh, tenants residents of those new developments can utilize but anyone else visiting downtown can utilize as well. And um for the comprehensive watershed plan um it has all the standard stuff and and and that's great and the tree protection um and removal minimization. I know that Commissioner Foley has been requesting over and over again a tree canopy plan and study. Um, one thing and I want to obviously preserve as many trees as possible when you're working with the conservation subdivision and the UDO, but one thing I am concerned about is I feel like we are missing um a piece in that and that I would think would be a wildlife habitat study and a wildlife corridor. Um, [clears throat] we are robbing animals of their habitats that they have had for for years. And I get it. That's just the way things are going to be. But if we don't study some of those corridors and we decide, hey, your clubhouse is going to go here and this could be here. Um, I think what we're going to find are more accidents on the road. Um, I myself I I left the house at 4:00 the other day to go for surgery and there was a deer in the middle of the road that had been hit. Obviously, this is the season. Um, but I jeopardized surgery to get her out of the the road. And we're going to see more of that as we remove their habitats. And I think if we have some kind of wildlife corridor uh study, we

[1:47:18]

might say, you know what, maybe this isn't the best place for you. You might want to move your clubhouse 200 feet over here and we might be able to preserve that. And that also that that has a fiscal ele element to it. Um cars get damaged, people get in accidents, people get hurt. So if if we could possibly look at uh wildlife habitat studies and and uh corridors as well and maybe that goes into the wershed plan.

Some great feedback. [clears throat]

Good questions on the park and I was going right behind you with the park in there. definitely on everybody's agenda.

Thank you.

Um I had just one question is on the TIA the on and our level of service are we is anything changing or straight get me uh with the level of service in the TIA on the minimum and the maximum on dwellings. Is that correct? [clears throat]

Right. the uh the triggers for requiring a TIA um are within the UDO and the specs. Um and the level of service requirements and any improvements made to those are consistent with NC DOT standards. We wouldn't go any lower than what NCD do DOT requires. um if any changes are made to that.

Okay. Well, that I guess my question is goes back to the uh the dwelling units. When we when we have a development that's under 100 units, they only have to have one entrance. Correct.

Correct.

If it's over 100, it has to have one two entrance.

Okay. Okay. And that's still correct in the UDO, right? Okay.

Yeah. is consistent with the fire code.

Right. Right.

Those same things.

[1:49:18]

I get a little confused on the level of service and and what um what our LOS is. I I understand we're trying to be in a D. Is that correct?

D and D. C for new and D for existing. Okay. Transfer. It is matching what's in the CTP and what in DOT uses.

That just measures the amount of delay,

right,

at an intersection or within a along a corridor.

Thanks. It's [clears throat] first time I've seen you speak. I I love it. Uh now that I have you both we have you both up speaking at the same time. I have some questions for you both. This is about definition of responsibilities that maybe we can clear up because uh um way back we had a we had a development we had a planning director that left the town and [clears throat] soon afterwards and help me with may help me miss Armstrong help me with the timing. Were you here before that or after?

Before that.

Right before you came. And I think we hired you as a storm water engineer expert and I think the board was rejoicing. It's like yes, we have an expert storm water. the uh the planning director left. And at that time, did you receive a new title, development services director, or did you always have that title?

I already had that title when I came here. I act as their backup if they're not available. So, if we don't have a planning director, I act as that when they're not here. The same thing if I'm the town engineer. So if that if it was a planning director here, it would act as that unless there's an ER or PE that

[1:51:18]

would take that place.

I see. Okay.

And my areas of expertise are actually structured

engineering, right?

Engineering four areas, but I also have planning experience over eight years before I came to the town.

And do you have uh planning certifications?

No, I do not. I have my engineering which actually is comparable in some areas because most

merits and I don't I confirm to whoever's

Mr. Lewis, you have planning certifications. What are your title? What are your

qualifications?

I am a certified um by the American Institute of Certified Planners and a certified zoning official.

And you got those through the state of North Carolina and North Carolina School of Government?

Yes. O is through government and AICP is through the American Planning Associ.

Mr. Armstrong, do you have those certifications?

Not right now. No, sir. But I am available to sit for those. [clears throat] I do have the experience to actually get that if I take the exam.

Have you taken the exam before?

Yes.

And did you pass it?

No.

Commissioner Foley, what's the item?

I'm I'm asking because I want to make sure that your roles are defined specifically. Okay. Uh you have made planning decisions or not? And and who authorized you to make planning decisions since you're not a planning?

It's in my job descript

director. Okay. So your superior said that would be fine for sure.

I think we're getting into personnel discussion and

just answer the question. This is public knowledge.

This is a personnel [snorts] issue.

Who authorize you to make decisions?

It is in my job description. Sorry.

Okay. That's all I wanted to know. Thank you. Respectfully, I'll I'll step away from that. But u So are you going to be making planning decisions in the future?

That's his job. It's his job and you're going to be making engineering decisions.

My primary job. Yes, sir.

Does he Does Mr. Lewis report to you?

Yes, sir. Does

Okay. Thank you. That's it.

[1:53:22]

[clears throat]

All right. Any questions about the agenda item?

No questions, but I'd like to make a motion. Before you make a motion tonight, I would just like to apologize for the one of our board members in your personal duties as a town employee. Thank you.

Yeah. Thank you guys for all that you do. I know that your job is not easy. Thank you.

Um I'd like to make a motion to preserve downtown parking. um to move to preserve all existing parking spaces in the town parking lot on West Salisbury Street while evaluating long-term parking solutions through the downtown parking study and master plan. Uh, number two, I would like to re-evaluate downtown street the streetscape design um and direct the planning board or the PDAB board um and town staff to jointly evaluate alternative streetscape designs that preserve all existing downtown parking spaces while maintaining or increasing the average sidewalk width. Um, alternatives should include a comparison with the current design, feasibility, and potential schedule impacts. The findings should be presented to the board for consideration uh before proceeding with the current streetcape design, which is now scheduled for 2028.

Second that motion. Okay, there's a motion and discussion about downtown parking. Is there any discussion? Mr. Mayor, I understand this is was just for uh information only, not not for a motion.

That's what the agenda item was. I think the board has the freedom to make motions as they wish. But

can you read it again?

Yes. like to make a motion to preserve all

[1:55:22]

existing parking spaces in the town parking lot on West Salisbury Street while evaluating long-term parking solutions through the downtown parking study and master plan and to for PDAB and the town staff to jointly evaluate alternative streetscape designs that preserve all existing downtown parking spaces while maintaining or increasing the average sidewalk width. Alternatives should include a comparison with the current design, feasibility, and potential schedule impacts. The findings should be presented to the board for consideration before proceeding with the current streetscape design, which is now scheduled for 2028. I think that having less of a sidewalk, I don't think that's really I don't know how if you've studied the map, Jay, or not, but um going down

by the tents.

Yeah. I mean, making our sidewalk smaller, is that what we want to do?

I don't know that for sure. I'm not an engineer, but I will say, and Teresa can, uh, go along with this several years ago when we first started this study, uh, parallel parking was going to be on on Main Street. And if I'm not mistaken, it was losing well over half the parking. So, we pushed to go back to the angled or slanted parking, what you're saying. So yes, parking has been on a problem [clears throat] for years, but uh that was the reason for uh sidewalks to to make them larger was to put parallel parking in,

right? Which is going to be taken away. Some of it some of the well the slant some of the slanted parking is going to be be taken away.

Some some Yes. doing more improvements at the intersection,

right? Mhm.

But there shouldn't that we should not be losing parking.

[1:57:22]

Absolutely. That's why we were in strong denial of parallel parking.

What is it 20 spaces that we're losing?

14.

14. Now,

if I may ask, or if I could just make a statement on this. Um, I think one of the most important jobs that we have as commissioners is to listen to the constituents of the town. And tonight we heard from a very important element of the town and that is the downtown business owners. And we've heard someone made their their business decision to locate a business here because of the parking. Um, one of our I would say ex what uh Greg Stafford uh said when he made his public uh when he spoke is very compelling and I think we need to take that into consideration. Um I just want to clarify that you are just asking right now for no net loss while we study it but not committing the town to because we may have to fight well we may have to lose a space here we may have to lose one here but you want no net loss while they are studying it and when do you want this um presentation and study to be made? I mean, as soon as they can.

Um,

we're constant. I didn't know we were discussing this this evening, but um I think one of the things we hear about downtown as well is pedestrian safety, and we've had some people killed downtown as well as pedestrians. So can can we add to that as well that pedestrian safety and ADA improvements would be maintained because that's those two are big topics here. So

thank you.

I would like to add that in my motion

which has a second.

Yes.

Okay.

We can continue this right discussion.

Discussion. Yes. So, uh, did I hear that the ADA, uh, uh, possible ADA changes

[1:59:24]

might reduce the number of spaces?

Do we know that for sure?

As far as I know, it's going to reduce the number of spaces,

but I don't know the configuration. Like, maybe it can be put somewhere else. There's two handicap ramps going right one in front of Euries and one in front of the soda shop. If I may, the largest reduction of space loss on Hillsboro Street was from removing the compact car spaces that are where the trees are now. Then when they added the handicap spaces, I guess per DOT spec for how many handicap spaces you have to have, the only place they could put those ramps were in the sidewalk themselves, which is where you're getting the narrowing. So I think the sidewalk itself is probably still nine or 10 feet, but they're having to take up several feet to put in the concrete

with the rail. with is there is there a rail there or just your standard

sloped ramp

but the sidewalks are going down to 5T in some areas right

where the handicap ramps are located in the sidewalk your I guess your sidewalk proper um would be I think what five and a half feet was the narrowest from what uh Siobhan was showing

and those are in front of the two busiest restaurants on Hillsboro doesn't make much sense to me.

Yeah. If we're going to talk about ADA, um uh dealing with that in in in some capacity, I noticed that um I do think we do need some more ADA spots and access so that downtown is accessible to everybody. But one thing that I've noticed and I've heard my parents, I have a 99 and a half year old grandmother who's in wheelchair and one thing that they are always looking for and this might help preserve parking is they're looking for a place to drop off handicap, you know, drop her off with a wheelchair and move her up. That might help preserve some parking, but I don't

[2:01:24]

think something like that was ever studied. And it's not anything I would have ever thought of until being in the situation of boy, it would be great to have just a drop off. Um, but that's just something that maybe as you're talking about pedestrian safety and ADA consider a drop off zone for people because a lot of times people will be car pooling and one person drop off.

So, um, thank you Commissioner Thurber for making this motion. And the reason I've seconded it is because I feel this this discussion is so vitally important. Not only because we've had presentations of concerns directly from PDAB and business owners tonight [clears throat and cough] and I've spoken with a number of business owners and I've been very candid that because I'm trying to think of how we build our community for the future and build up rather than out to model the kind of urbanism that we we need for a slew of reasons environmental fiscal storm storm water uh health. I anticipate we're going to have a future where we have more density of residences in downtown and I expect that there would I hope that there will be more mixeduse development that will have the private sector investing in parking. This is a very delicate balance though and so I I appreciate Commissioner Huner's question regarding the timing or duration of your [clears throat] your intent. Is this indeed let's confirm just for the t the time in which we're waiting the public parking study to be completed? Okay. Um and we might want to tweak the motion to be explicit about that. Um because there's there's going to be a time where I'm going to be proud to be

[2:03:24]

from Pittsburgh where parking is a problem. I'll just be blunt. I've joked about that with a lot of businesses. Um because we are in a strange time where we we want to be more urbanist and we want to have a walkable the ability to walk to our work and our play and our school. um how we get from A to B, from today to that future, I don't think there's any single expert on how how that happens. So, we're going to need to work through it carefully and with constant checking in and conversations and and I do hope and expect that DOT will be persuaded by a resolve from this board that we need to look much more carefully at that downtown plan. So, thank you.

Yes.

I'm looking at two different motions in one motion and correct me if I'm wrong. PDAB is one side of it, right?

Right.

Can we separate the two out?

Sure. Um, two motions.

Well, because I think PDAB is their responsiveness and their input is so valued of all of the advisory boards. they're equal equally important uh just the revenue etc coming into the town uh and their enthusiasm their excitement about what they are doing uh we value their opinions uh so maybe separating it out might might be good uh I'm happy with voting on both but it seems to be separate topics

okay sure I'll do that then

is it just a little bit discussion before we [clears throat] work on new motions.

Ask a question.

Sure.

So, when when Kent was here, we went through the fiasco with Century Link. We were able to get their lot for additional parking. It's about 33

[2:05:25]

spaces. So, those 33 spaces were added to prepare for um the construction during the the streetscape project. So, are those spaces being counted as current or can we count those as additional spaces?

Which ones? The ones on Thompson Street

right across from easy house.

Yeah. Because if you grab those spaces, we we very much have a net gain in the downtown parking related to the streetscape project.

Yes. And but the conversation we had there was that nobody's using that lot.

See to market it more maybe.

Are you finding signs?

I mean it's kind of far from everything else.

Yeah. Just curious. Okay. Okay. And um if we're still having conversation discussion about this I I would like to broaden the topic uh I don't want to make this too cumbersome but um when the initial streetscape uh proposal was brought to us I was not adequately aware that there was an expectation of actual loss of trees in downtown And uh I view those poly trees as more than symbolic and I think they're very very important and um I have heard rumors that the board approved the idea that those trees would go away and that is not my intention. That was not my intention. So I think that's another reason why we need to revisit this plan. Um, and I I see some nodding heads, but I would appreciate some voices if that is indeed uh a concern shared by other board members.

The trees, absolutely. I think they're part of the identity of Pittsboro. Um, I

[2:07:25]

would like to see them preserved and protected at uh, you know, if feasible. Absolutely.

I agree. Um, but I feel like I've had this conversation and I I know it's going to be it's really expensive to save the trees. Um, so if we could have like an an exact number on how much it would cost to save them, that would be great.

Yeah, I provided that probably three six months ago. I believe we did run a survey on the cost of the removing the trees and preserving them and replanting or or replanting, but and the arborist or that we had spoke with was concerned about the root ball getting too large and infiltrating into the pavement and the sidewalks. It was

and and I honestly cannot say if we decided to preserve the trees or remove them and replant on that one.

Yeah, there was three options was, you know, zero dollars, do nothing, best practices, put protective fence around them. The second option was um just get rid of the existing trees, plant new trees that were, you know, five or six years old, so they already had some height to them. I want to say that was 55,000. And then there was the option to dig up the existing trees, take them to a nursery, replant them, take care of them until they're ready to be replanted. I think that was 130 or 150. But I surveyed the board on those costs six months ago, maybe more. And there wasn't an appetite to do either of the the latter two. And on any design changes, I did speak with DOT today in preparation for this conversation. Um, being that the plans are 100% done, they are essentially set in stone for this project. Any changes that are made would be 100% cost to the

[2:09:27]

town. So that's to do any design work, that's to do any change. Uh any uh additional cost associated with that delay would be our responsibility. And of course, any cost um in addition to the existing design would also be the town's cost, but and I have no idea what that potential cost would be. [clears throat] And are are DOT still linking the downtown streetscape project with uh the Hillsboro Street section from uh Loness Street up to Power Place?

Yes, sir. Yeah.

And so the delay for the downtown project delays the pedestrian improvements along Hillsboro Street.

I don't think so. I don't think so. I think they I think they're linked as in they want to do them both at the same time. They're probably going to bid them out at the same contract, but you probably could separate them. I mean, if you wanted to, you probably could just say you don't want to do it anymore.

It they do have separate project numbers, 5724A and 5724B. And so um because it was added the streetscape portion was added after 2019 when the Hillsburg street project started

which I [clears throat] think is probably some issue with the streetscape because the community engagement portion of that project had already been completed and then the streetscape project was added after that.

Yeah. But I'm happy to investigate our options, talk with DOT some more um and report back.

Well, it's going to be really good to have a tree city board because that could be a body that could be digging deep on this issue and the possibility of grant funds to offset the protection, the cost of protection of those iconic

[2:11:27]

trees. [clears throat] So, um, we've got a whole lot of things that we need to be working on quickly. Seems like, um, that increases the priority in my mind.

Any other discussion? Okay. I would like to make a motion to preserve downtown parking um all existing parking spaces in the town parking lot on West Southbury Street, including designated accessible ADA parking while prioritizing pedestrian safety and evaluating long-term parking solutions through the downtown parking study and master plan

until Sorry. You want to say until you complete the parking study and master plan?

Until the we [clears throat] complete the parking study and master plan.

Second.

Thank you. Motion second. Any other discussion?

Can we say instead of complete uh we say approve the board approves it instead?

Yeah.

Okay. Do I have to reread it up?

No. Do you second the [clears throat]

Any other discussion?

All the All those in favor?

Yeah, I'm good.

All right. All those in favor say I.

I. I.

Any opposed?

Good. would like to make a second motion to um direct PDAB and town staff to jointly evaluate alternative streetscape designs that preserve all existing parking spaces and maintain or increase the average sidewalk width with alternatives to include comparison with the current design feasibility and

[2:13:29]

schedule impacts for downtown. Sorry, I read that wrong. to be presented to the board before proceeding with the current streetscape design which has now been moved to 2028.

Second

motion second any discussion

just one from himself is regarding what we get back from uh Mr. Franklin I mean is this could this could deter the different the cost in delaying correct if we delay and DOT's already got the plans and we don't know what that cost could be then right well inbridge has to move all their their infrastructure um that's probably going to take couple of months and they weren't going to start I think until April of next year anyway even with without the delay so we should have time [clears throat] I mean if if Pab is going to is going to carry a lot of the water on this one, then we should be fine.

One thought I'm having is we're already overloaded as staff anyway. Um, and thank you all for approving the transportation engineer. I really appreciate that. But that person, that'll take us several months to get that person on boarded. Um, so we will do the best that we can. And now Teresa has a number two. I think she can probably jump right on it, right? Yep. Thumbs up.

So, we have a motion.

We have a motion and second. Any other discussion?

All right. All those in favor say I.

I.

Okay. Up next on the agenda is the storm water fee study. [clears throat]

Good evening. I'm Ben Schmati with the development services department. Um so this agenda item is for discussion to kind of kick off our storm water study.

[2:15:31]

We have our consultant here u to present. So I'm going to invite them up and let us know if you have any questions.

Uh good evening, mayor and members of the board. Uh my name is Matt Dudley. I'm an engineer and the director of surface water for ESP Associates in our Morrisville office. Um I'm also the overall project manager uh and and principal point of contact for all the services ESP was recently selected for under call contract. Um we're here tonight to talk about our first task order which is phase one of a feasibility study for storm water utility. And with me tonight is Shane Paris who's going to be our task order lead. Uh we have also brought on a subconsultant Rafalis and Jennifer Tventus is here with us as well. Uh they're uh an expert in this uh type of project. So I'm going to hand off to Jennifer first. Good evening, mayor, commissioners. My name is Jenniferis. I am vice president with Rafelis and uh indeed day in and day out work with communities uh setting up storm water utilities. [clears throat] Perfect. Uh I know this is not a new topic uh to this body but just to sort of set the groundwork here I will um provide a little bit of an overview of storm water utility. So this uh implementing a new uh storm water utility represents a change to the way you're funding uh your storm water management program. uh this project represents a feasibility study and then potentially an implementation and we'll look at the next slide uh sort of what's included in

[2:17:32]

those uh phases but ultimately this is what we're evaluating. So a potential change to the way you're funding your storm water program um through a fee rather than through your ador taxes which is the way uh you are doing so presently. Um under this sort of construct, property owners do pay um a proportionate share of those storm water uh management costs based on their use of the system uh which is typically equated to uh the amount of impervious surface area on a property and we'll have some examples of that. Uh it does represent you know on the plus side a stable dedicated funding stream for these important um infrastructure maintenance efforts. uh but it does also represent a a change some administrative effort. Um and so there are some kind of considerations as we move through this process. Uh tonight uh we have a a short number of slides I think to kind of walk through uh what is included um in this uh in this first phase of the project and then what may be included in a second phase. Our we're in the early days still. So our goal is to get some um feedback from you all on uh goals, concerns, thoughts, questions that you want to have answered along the way. um all of those sorts of things. [clears throat] Um so first let me just cover uh what's included in the feasibility phase uh which is uh already been been funded and is underway. Uh we are evaluating the town's storm water programs that you have on the horizon. um potential upcoming regulatory obligations, just the overall sort of cost of uh managing and maintaining your your infrastructure

[2:19:32]

and your program. Um that feeds into uh the financial evaluations that will be coming uh later in this feasibility phase. At the same time, we're going to look at the impervious uh imperousness uh the development characteristics across the town to to sort of figure out what is the sort of overall demand for uh your storm water management services and how is that uh allocated among your property owners. Um we're also going to talk about how a new fee may be conveyed, whether that's through the the tax bill or through a utility bill. um we haven't had those discussions yet, but are interested in any thoughts you may have um this evening. And then all of that will sort of come together in a a financial model that that includes sort of financial plan out over a a five or 10 year planning period um and sort of draft rates. So set up a new fee, what would those rates be? Um and that will kind of inform the feasibility of making that change at this time. and we'll roll into phase two uh if this body decides to to do so to refine some elements of that proposal and uh incorporate sort of communication um out to the uh the public and important stakeholders. [clears throat] Uh all right, I have a a word cloud up here. I do want to clarify this. These are not your words, but these are words that are that are sometimes come up when thinking about uh implementing a new uh stormwater fee or you know adjusting the way you fund the program. So, as uh you hear from my colleague Shane and myself throughout the remainder of this presentation, just some things um that you may uh be thinking about um sort of the the equity of a revised approach, simplicity, um fairness, how it impacts growth and development, those sorts of things. Um you may have uh thoughts or

[2:21:33]

questions um as we get to the to the end of the presentation. So for the moment I will invite my colleague [clears throat] to uh talk about the the program and the revenues.

We have it here. Good evening everybody. I am Shannon Harris with ESP. Um I in my day-to-day specialize in contracting and supporting municipalities with their water, sewer and storm water utility operation, flood plane support and then any other departmental needs they may have. I've worked the past roughly 12 years in various um municipalities as either an MS4 director or a planning director primarily. So what I'm going to go through here is some of the technical or more technical aspects of this initial phase one. So to start off with your storm water program and project revenue, we need to establish your need. So when in conversations with town staff, we have been informed that the um the infrastructure database in GIS is still rather sparse in development. So the first step we would need to do is develop a sample area of the town's current infrastructure to determine what conditions it's in and what your operational needs would need to be along the way of staff, what materials you need, your current repair estimates, that concept to give you a base operational budget. Typically when you do an analysis, you would find the um the median condition of your system. So you don't usually want to go to the worst. You don't want the best. You want your standard operation. In absence of a sort of median and especially in um older municipalities that have a lot of aging infrastructure and then a stop gap to a lot of more new infrastructure, we would typically go to the aging infrastructure and then take that percentage of what's old, what's new, and then we expand that in an estimate across the city to give an initial estimate which we then take that information, we'll put it into a GIS dashboard. And I have some reference images of that as we go through. But

[2:23:34]

that will allow the town to be able to track the progress with where we're at. It will have a grading system for the infrastructure based on AASHTTO standards. And then that database will then be able to take that data. You can implement it to your GIS system and then continue using that dashboard for ongoing um tracking of your systems. with once that data is collected and the general estimate of your needs are assessed, we then put that into the financial model which goes along with the um impervious surface ratio which will then be broken down into your your your rates assessment. So for the sample area, we will need to identify with both staff and town officials where would be good places to look. We have a couple ideas. Typically, we want to stick with somewhere between 2 to 5 acres. Um and as I said, it just depends on what the the general infrastructure you have is a s sample area. We've covered the second one. Um and then we'll go through survey the conditions and break down that estimate across the whole city. So then the data will be collected with field maps which was exported to the town. So it'll be in the dashboard but then also be able to pull out but directly into the system. And these are two areas that we have roughly identified as potential areas to sample. The one would be along Hillsboro Street from Hanks up to is correct me if I say these I'm a little blonde. What is that top? Is it Lisa?

Yes. From what I understand from talking to some with staff and then aerial imagery, this this area represents a good mixture of open ditch and pipe systems within the city and it's all older infrastructure. So, it's fairly consistent with that region. On the left, this is over by the elementary school. And I understand you have a few of these major crosssections that are either associated with potential development or are experiencing some level of flow. So that is a an area we would want to take a look at as well potentially to get good estimates of what you guys are going to need. Um and

[2:25:36]

those are just those are just ideas. So here is some examples of a dashboard we have done for other places. This would be your general over overall of the area. You have your breakdown of your your different culverts manholes all your different infrastructure inputs. Little zoom in of how that looks over here. full asset ID and information. This will all be done through survey data. And then broken down on each of those points, you'll be able to have pictures. You'll be able to put the grading system based on different ASHTO standards. And that will all stay within your GIS system, which can also then be spun over during operation for tracking and maintenance of where your current conditions are.

So the database will build towards operation.

Yes. Yes, it will. And then for imperous surface, we are coordinating with our vendor. um they are using their systems with current NC State aerial data to collect the um the overall imagery of the of the town which will then be broken down through their system and to identify an impervious surface areas which then we will collect and refine that into GIS data to um develop the total impervious surface ratio to go along with the rate study and we are back to you.

May I ask one more question? Oh, you absolutely will. Or unless you'd like us to get through and then we were going to open up for all general questions if you would like.

If I may before I lose it.

Absolutely.

Thank you. um the the survey and the sample selection of sample areas. The two areas that you are focusing on at the moment are certainly in the older part of town and I would assume that that is much older uh and in state of repair or disrepair. Um the town also developed in kind of fits and starts

with uh neighborhoods. I think the larger neighborhoods were

[2:27:36]

bait farm was 30 years ago.

Mr. Frell, that right [clears throat] about 30 years ago. May Farm and then um how place

place was before that.

Oh before.

Mhm.

Okay. and uh Chattam Forest 258

maybe 30 years ago 30 years.

So I think I think we have an understanding of when those other neighborhoods uh developed but how would that play into your methodology or is your methodology set by the contract where no

again this is something we were going to open to discuss more once we got through this because this is something we need your guys' input on. Okay. Um,

I don't want to get ahead.

There's a couple different ways to do it. [clears throat] You can if in a lot of in a lot of towns you have somewhat consistent growth through through time. You have consistent methods like whether you're using concrete pipes, whether you're using lot of open ditches. And we would usually want to find like a 1 to 5 acre area that isn't in the worst condition, isn't the best. That that gives you your standard operation. If you are in an area that has developed either in spurts or in say two or three major sections. So a lot of your infrastructure is less than 20 years old but then you have and that's 40% of your infrastructure but then you have maybe 45% is 50 years old and then you have an additional 5% that's somewhere in the middle. In that instance, what we what would typically be best is to look at the 1 to five acre area that has a mixture of methods. So, if you have if you have a decent bit of ditches, but also pipes in your oldest section, that's your area where you're going to have your most need for maintenance and immediate repairs. When it's less than 28 years, when we expand your operation, we'll take those percentages and put that in the expansion. But as far as survey and condition assessment, you want to focus that where you're going to have more

[2:29:36]

typical need. Does that make sense?

Okay.

Thank you.

Yes, sir.

All right. So we have a few um additional sort of categories within this uh the feasibility study that we want to present and get some feedback on this evening. First is fee conveyance. So I mentioned a few minutes ago uh the the common uh approaches to conveying a new stormwater utility fee are through an existing utility bill or uh through a tax bill. Some communities send standalone bills. I [clears throat] don't recommend going that route because you have two potential uh viable options here. They both have their advantages and their considerations. The the county tax bill is of course um annual. [laughter] It's harder to reach tax exempt properties. There are uh some considerations around uh enforcement should those fees be unpaid through the tax bill. Uh the Tri River utility bill is sent monthly. Uh and the the storm utility fee could be potentially included as a monthly charge which has a positive impact on your on your cash flow. Uh collection and enforcement. It is a consideration especially since the utility is a separate entity from the town. And in [snorts] both cases, you would have customers that are that are sort of new customers because they are getting a storm water utility. So customers that

[clears throat]

uh that don't have a a water and sewer bill or don't get a tax bill. Um they would have to be sort of added to the customer roles and uh managed by whatever entity is is sending the bill. So to that same end, um customer service

[2:31:36]

and how that is uh sort of coordinated and managed for the town is a consideration as well. Rate design uh for a storm utility fee tends to be uh pretty pretty standardized. uh impervious area is the the most common uh sort of approach to calculating and establishing uh storm water fees. So impervious area that is hard surface area you know through which uh rainwater cannot infiltrate the ground instead it runs off the property into the town system. Um that serves as a great uh and and very common proxy for use of the system. Um so that is you know has a strong relationship to the cost that you all spend to manage uh your infrastructure and the the water quality and flood control uh impacts as well. Like [clears throat] I mentioned this is the industry standard approach. Typically for your residential customers there's going to be a simplified uh a simplified approach to billing. So either all residential single family residential properties get the same bill or they get one of three or one of five tiered rates. So we will be looking at uh those sort of simplified alternatives as we go through this process. Um and that really will depend to some degree on how uh differentiated that residential development is uh within the town. And we've been talking about those development patterns over time. So there may be good a good reason to go that tiered route. Doing so however does require some additional data development and data maintenance. If you're going to if you're going to charge people into you know all your residential customers individually for their specific amount of impervious you have to know what that amount is and keep those data maintained

[2:33:37]

over time. I've already covered the top part of this slide. uh for non-residential properties that uh approach is usually to bill each non-residential property in an increment of one uh equivalent residential unit. So sort of what the impervious area amount is for a typical house that becomes your billing unit and that unit uh is then used for other uh other customer classes as well. that can make it simple to draw the the parallels of uh of equity. Uh using this rate structure between the single family residential and non-s single family residential customer classes um it can simplify some of the communication around billing as well. There are some other considerations uh some of which fall into this first phase of the project and some of which will uh be addressed in phase two. We can think about phasing in a fee sort of we we have yet to see where those uh costs fall, those revenue requirements. Uh and once we have all of the data pulled together, we'll be able to see what the potential impact is looking like for uh for rateayers and we can have an informed conversation about whether those fees need to be um [clears throat] you know, if feasible, phased in over over time. We will also uh talk in more depth about a credit program which is a a kind of nuance to the rate structure to acknowledge developments that are doing something to manage their own storm water runoff before it enters your system. So it's it's a refinement to the impervious area structure uh in its strictest form. [clears throat] And then uh last but not least, we'll we'll be thinking through um potential

[2:35:40]

exemptions. Carolina, there's a required exemption for uh agricultural properties. Uh but communities make different choices about how to deal with uh their own properties or other governmental entities and things along those lines. So that's a a consideration as we move forward as well. Uh I'll just I'll [clears throat] just cover this and invite Shane up at the same time.

[laughter]

Uh this is our timeline for the feasibility phase. As you can see, it's really quick. Um we're in the early stages now. We're about to take your feedback and go do uh a bunch of analysis and then um we'll have some sort of preliminary thoughts uh to bring back to you in just a couple of months. And I will actually let you take this. So at this point, we would open any questions, any input, any ideas you all may have. Um, we we really do value your feedback. Make sure we're delivering a product to you that is what you need and what you want.

Thank you.

Would would this apply is this meant to apply across the whole ETJ or just the town limits?

I believe this would primarily apply within town limits. And just in in general from your work before like where would we expect fees to be higher kind of Mr. Bonis's question about old older neighborhoods or I guess it depends on the method as well, but newer construction

the wear fees would be higher. Is that what you said? I'm sorry. I can't I wasn't sure what you said.

Yes.

Okay. So, depending on how you apply the method if you're doing it based upon in like individually on impervious surface ratio, then that would be very similar to a water bill. It's going to be based upon usage. the more area of a lot that has a house, a parking lot, driveway, pool, anything that does not absorb water, that would then have a higher

[2:37:40]

rate. If you do a standard simplified rate, then all of your houses would pretty much be the same. You would have a higher rate though if you were dealing with commercial or industrial. That that that would be consistent.

Okay? So, the flat rate wouldn't necessarily be related to the like neighborhood infrastructure. you you would sort of take an average across the board of your herous surface ratios

based on one of the things that he mentioned about the the um I'm sorry that Commissioner Bonnets mentioned about the um difference in the subdivisions in the eight and so on. um how does this I think relatively small sample um kind of really show the infrastructure uh needs of the entire town when you have some areas that may have inadequate storm water issues um uh you may have uh failing storm water and I'll just give you an example and then and some that are impacted from uh non-town um uh property And here's an example where I happen to live. Um I back up to county, okay? And that county property that has two 18inch pipes that have not ever been maintained. Their their whole storm water system has never been maintained. Um it cannot handle the downfall. They feed into two 36-inch pipes which then feed into three 36 pipes collect and then shoot down into I believe two 24-in pipes that are townowned. Um but we have no obviously jurisdiction over county but that is impacting a lot of flooding. It is causing the further downstream um pipes to uh I I want to say be um compromised if you will. So how how does that work? I would say that that's being negative impacted and might drive up our cost but is being impacted by county. Um

[2:39:42]

so as I'm I'm hearing slightly two questions

there. Yeah, there's probably four questions in there.

So on the association with taking county storm water that gets into multi-jurisdictional territory which is sort of outside the scope of this that really is going to be more of a legal question. Um, as far as coming into how does this small sample area affect everything? Truthfully, it doesn't. What what this point of the sample area is again to find your average your average general need you have right now to establish the utility. Now over time as you start to build it you start to as you build staff you start to acquire further data you start to develop your a full scope knowledge of what you have then you start to adjust the program to fit those needs. But you need to the purpose of this is to is to come up with a feasibility of how practical is it to for you guys to adopt this program and then what do you need to even get started to build from. um it it's not to cover a full scope of the entire needs everywhere. This is your average needs to develop a program. Is it feasible and what would that look like? And then from there you can grow further with it which is like the dashboard why it's designed the way it is is that as it grows collect further data as you start to develop the program further you have a base point.

Understand? Um in one of the earlier slides you have um I think one of the first slides you had the phase one feasibility and then the phase two implementation. um you had the credit program and um I want to just kind of touch on that that I'd like to see us build incentives into this uh the whole free fee structure that rewards people for implementing things like rain gardens uh uh SCMs on their own property and um also um you know anything that they do to reduce the impervious surfaces. um how how would we even go about weighing those or is that something your

[2:41:43]

program and your there's already a formula for? Uh formula may be a a generous term that when when it comes time to be thinking about the uh credit program, we certainly want to kind of consider uh some some bounding conditions for the program. So what type of property owners would it be available to just non-s single family residential or single family residential customers as well? Uh and what types of things are sort of credit to bull. So rain gardens is a great idea. Rain barrels is sometimes a more uh uh hit or miss depending on the program. Um we will be thinking about the the impact of those measures on the kind of overall um [clears throat] runoff and and impact to the to the drainage system. We'll also be thinking about the value of kind of the the public education piece, the awareness, the um the community uh elements of making this a a collaborative effort. Um so I we well time will tell I think on where those numbers land, but those are all kind of considerations as we as we go down that road. And and I hate to like I'm I feel like I'm ahead of the time here, but I got a lot of questions. Um storm water is a a big and our systems are big to me. Um one thing we have been discussing, Commissioner Bonets and I have been discussing is alternative to asphalt um and more imperial pavement um grid concrete and so on and so forth. um as we get new developments in, um would we consider doing a um uh an incentive or something to encourage those uh and this because I know this is mostly homeowners. Um which also uh if we could

[2:43:43]

also touch on what about um taxexempt uh groups like churches or or whatnot who have large expanses of uh impervious surface um are they exempt from this and okay good and um but I'm wondering if this could not be used to incentivize uh non-assphalt uh solutions. Yeah, absolutely. Uh permeable pavement, those types of solutions are uh typical components of a of a credit program. Sometimes they are treated as sort of an offset to the true amount of imperous area on a lot, but I will say that maintenance of those surfaces is really important for them to continue to serve as a permeable. So, we would want to build in a way to kind of make sure that if there's not already um something embedded in the in the system, we'd want to make sure they're well maintained. This is my very last question, I promise. Um you mentioned two ways of collecting this, either through the Chapman County tax bill and through the water bill. I kind of like the water bill because um I'll tell you, it's hard when you get that tax bill and you're like, "Wow, it hits you all at once." um and it could be a lot at the at the end of the year to come up with or um you know you find your mortgage go up significantly and not that I don't expect this to be significant. So I like that monthly it it makes it easier you know bite the elephant one little bits at a time um what do you find is the best solution for collecting could you provide us with pros and cons of both so we can really make a good decision on how to do this? Yes. Um, absolutely. And I will I'll just reiterate that since we are in the early stages here, we have yet to approach either of those entities about this. At least the the consultant group. I think there have been some discussions prior to our involvement. But we uh we need to

[2:45:46]

learn sort of what's it going to cost? What to to include the fees on the bill and to support whatever customer service obligation and collection costs and that sort of thing before uh revenues are remitted to the town. Um and it it may be the case that one of them is is less desirable um just because there's not staff capacity or um there's some other sort of unforeseen obstacle to to going that route. So um I don't have all the pros and cons today, but we will we going to go through that effort to figure out what makes the most sense here and present all of them um at the conclusion of this phase.

Thank you. Uh, I'd also like to ask some questions about the revenue side. Um, this was very informative. I've learned so much already. I confess that in my original understanding of storm water utilities, I I had a very different impression. I thought that we were looking basically at, you know, something in line with the principle that growth pays for itself.

And so then only the new installations, the new development would contribute to the fund. Um, are there programs that do both? And

well, I'll just I'll just quickly say um what you're describing is more like an impact fee or a system development fee, which we heard come up earlier.

Yes.

Uh today. So that is kind of fundamentally different of than what we're talking about here, which is which is really focused on kind of existing and ongoing needs for the program. um which you know can be differentiated from growth related needs which are more often recovered through through those but

that's exactly what I was going to say [laughter]

I think where we have most of our storm water issues in flooding is in older development areas as well so

I think that's an important

[2:47:48]

as Jennifer said you could adopt a a an impact fee or a mitigation fee for new development but as far as the ongoing operation of a storm water utility as with any operation Impact fees are designed for offsetting additional cost from new growth, but they are not consistent and therefore not capable of supporting a regular operation of business. So that's when you have to go into the concept of utility. [clears throat] And have you worked with communities where there's a desire to um provide relief to a a certain section of town. You know, you've heard a lot tonight in the other agenda items about our downtown and how cherished downtown is and how much we all really want to invest in downtown and and promote growth in downtown. So, um, long ago I had a conversation with one of our planning director. He's no longer with us. And I asked,"Well, why is it that that particular infill residential couldn't have more units on that lot?" Because I understood that the owner of the property wanted more units on that lot. He said it was impervious surface limits, constraints on impervious surfaces. And I said, 'Well, what does it take to get to the point where they could have built more impervious surface? Because that's where we want it is in downtown, not in the outskirts.

Typically, that is a zoning or a development regulation, which is again kind of outside of this

that would go in our UDO.

Yes, it's usually within that bounds. That would be outside the realm of utility. Um those those fall same thing along with setbacks. It's it's a very similar concept as that. Um so that yeah that that would be outside the scope of this but it could I I've seen it done be a way of saying that I have seen it done. I've seen that seen that type of adoption within specific districts usually overlay districts but

[2:49:48]

that would be outside the scope of what this is for.

Okay. Um, in your report, can you mention that so that we've got a placeholder on this that that is something that is done?

Yes, I can. I I'll I'll define what this is covering and what it can't cover.

Sure. I appreciate that. Um and and that would also I think help staff maybe prompt the investigation of of what it would be shaped like and and uh what what aspect of it has to be in the UDO and what aspect has to be in the util under the utility. Thank you. when we have lots to talk about downtown obviously um and I you know a lot of those lots are effectively 100% impervious for storm water when we have the ability to exempt them from the utility fees

I think that would uh be the prerogative of this board um I have not seen that done but Um you can this will be set up in the way you all want to set it [laughter]

not necessarily related to that concept but what are the enforcement mechanisms for non-payment of storm water fees.

Um so it depends how it's build. uh if it's on a utility bill, sorry. Uh and the utility agrees to this approach, uh it can be set up where there's a a payment hierarchy that where payments sort of hit the storm water fee first or early in the process and then um other charges and then water later. So that water shut off essentially becomes the enforcement mechanism. Um again don't I don't think I can say it enough but don't know if that is a a

[2:51:49]

viable uh alternative but that is [clears throat] done in some cases on the tax bill um for some communities in North Carolina but not for Pittsburgh yet. Uh there are special provisions in the at the state level uh to to be able to put a lean on the property for unpaid storm water fees that were charged through the tax bill. Um if Pisper wanted to join that rank, that would um take some some doing [laughter]

some legislative action.

Um and then last question for me if so like we're using that satellite method. How are changes tracked over time. Is there like a a scanning of the like if somebody adds a patio or

from surface for ongoing maintenance that would be

usually permit typical or

Yeah. typical.

Okay. Sure. Uh so so through this process we'll get the baseline. Um I think moving forward you have a couple of options. You can either sort of reup with a a vendor who can produce sort of full townwide uh impervious updates as often as you would want them. I think annually would be fully sufficient. Um otherwise there are the the more standard approaches of sort of tracking development through cos um and and through sort of the plan review process and updating billing data kind of as uh as you otherwise become informed that uh changes are happening on the ground and in phase two I knew I saw it on a slide the the billing policies and data maintenance processes is really where that is captured. So, what would that look like from a kind of staff perspective if it were a more manual

[2:53:50]

integrated process or what might that um kind of look like or cost if it were a contracted thing moving forward?

It would also depend on the the method you ch you chose to go with of billing whether you're going with simplified or individually based upon usage. That would also vary

how much data you need to maintain.

Yeah. And one other [clears throat] clarification while we're talking about the impervious areas surfaces, but um part of this scope is going to collect within the entire ETGA. So you'll have an initial base data set of imperous area within that entire 44 square miles.

Thank you.

Um is it refell?

Yes.

What is your relationship? Uh because this is ESP EPS

ESP

ESP. Okay. Got it. So what is your relationship and how do you work together or is there a contract between you two?

Yes sir. All both of you have separate contracts with the town if we approve it. Tell us about that relationship.

Sure. Yes. We're the we're the prime consultant selected on the on call and uh we subcontracted with Rafalis as part of this delivery order or task order.

Okay. All right. So the town doesn't pay Rafelis you do. Is that correct?

Yes.

Is May Armstrong used to work for you guys. Is that the same ESP?

She did. Yes.

Okay. Okay. I have a question about that. Uh I have a question to the town manager about that. I'm going to read it because I don't want to mess it up. Public records show that our development service director, May Armstrong, previously represented ESP Associates in the city of Durham storm water procurement process in January 2024. I recognize that professional

[2:55:51]

relationships are common and do not stand alone. standing alone indicate there is a conflict but for transparency for our town. I would like to understand where would like the staff to explain to board how ESP was selected for Pittsboro and whether other firms were evaluated, what roles the director played and whether or not any applicable conflict of interest disclosures or reviews were completed. What have we done? Have we s other contractors out?

So, um, we issued an RFQ,

okay,

in call services for development services.

So, this is going to cover multiple areas. Then we when all those RFQS were submitted, staff um May Armstrong created a committee across departments to evaluate the submissions.

Then that did close that she worked for ESP.

Yes. Yeah. Good.

That was known. Yep. Um I don't know the complete list of um submitts but I think Ben Ben could answer that question but there were I don't know eight staff members evaluating the there I mean there was a there was a committee across departments Edna Kirkman our assistant finance director was part of that process and selecting them not just for the this on call service but for multiple different on call services then in different groups in storm water in um track transportation um so multiple different areas

process is what you're saying

pardon

it was a fair process yes

election process okay great

[2:57:52]

that's all I needed to hear thank you

so um embarking [clears throat] on studying planning to create a storm water utility is a really good thing. We're taking care of things that we need to take care of that we have not had the means or the wherewithal to take care of for a very long time. I imagine that there are entities perhaps in state government that recognize that and incentivize that somehow. Is there are there grant funds once we've established a storm water utility? Once we've done the good thing, do we get rewarded by

I I do not know of any specifically for a utility,

but [clears throat] using you can utilize a utility to um establish need and establish a a basis of effort that the town is putting into issues. So if you have the area of pipe that the council member

that's what I'm thinking

issue, you could you could use the utility as a basis of need. It's an establishment of of understanding your utility, having an issue, and then there are different um infrastructure grants that you could qualify for. I'm unaware of any specifically for the development of the utility.

Oh, right.

Yeah. I was just going to add in addition to identifying infrastructure that needs improvement that might be um able to get grant funding. um this would establish a department with people people uh who can then apply for grants. So that's a important part of it. Thank you.

Anyone else have any questions?

I do just one. Uh

what estimate of amount of fee is this going to be per monthly residential?

Thank you. it this is we're very

you don't know but

[2:59:52]

very very t estimate or something like this

it so this is where it's very very early um to to get an estimate of feet we have to have an idea of of the the amount of houses the amount [clears throat] of commercial buildings the total amount of buildings that could be that would be done but also why we need to establish the sample area and get an estimate of your need because what we do is then we then take your your the estimates of your needs or what or two three different possible ways of phasing that program of need and then you divide that number by the number of units you have and that gives you your sort of basis per per structure or or per rate. But without either of those these points of data, it's it's kind of hard to give an estimate of what you may or may not need at this point in time. But that's the purpose of what this this this will do.

We'll have that in January.

And this fee, I guess, is in consideration of our failing infrastructure.

[snorts]

Why do we need why do we need this fee? What uh why do we need this fee?

So the the purpose would be to establish the the initial basis of developing a a storm water utility staff to maintain your system whether it is failing yet or not before it is f it's to give you a basis and and if it's not failing yet it gives you the ability to start smaller

fail

and then progress as you go. Is it temporary?

The utility

the fee.

The fee.

No. No. The fees would be they would be they would they be depend on the method annually or monthly.

But a fee is different. A tax pay our taxes every year. A fee. I guess I'm asking in 10 years could it come off?

There's there's typically not a sunset

mostly. Yes.

But again the this this board decides what happens within the town. So, um I would say unlikely, but

[3:01:54]

so we do have uh uphill from downtown Pittsburgh. We're going to have significant development. Um will you apply the approved uh developments while you're making your recommendations to us? whatever information would be available then yes there is current design plans that are approved um that is something that we would look at if it is in concept it's something we can take but that would be within more than more than likely depending on what's ends being the final determination of the sample area that would be something we take that that input into the um extrapolation method it wouldn't necessarily be going through that particular plan and fully evaluating their entire calculations and we wouldn't do a full reverse engineering of their their their proposed methods. But we would if you have plans approved, you have projects going into development, then when we do the expansions, yes, we would say, "Okay, this is going to fall into this category or it's not going to fall."

We work with our department.

Yeah.

In that information. Okay.

Yes. We would not treat it as vacant land.

Okay. What about land that's no residential or commercial was on this in city limits? A flat lot, empty lot.

Is it grassed or paved?

Grass.

That would just be vacant land. It wouldn't have any um impervious surface on it. So, it wouldn't really it wouldn't

it would be excluded. It'd be exempt. Is that correct? Okay. Not that there's much left around here, but you know.

So, will will you work with us as the town grows? Uh let's say let's say we

[3:03:54]

have an ADU or some some addition to impervious surface on a lot.

How then do you integrate that into uh building? Does that our our department do that or planning department or is it something you guys work with us forever with? So in this current scope we are this scope is just for the feasibility the initial implementation and financial methods. Um ongoing would would be separate from that. It is something that could be done or is something that could be done internal to staff. Um and that also the need for that depends solely or heavily on which method you choose to bill at.

Okay. And that would be in a contractual agreement right between the town and you Okay. All right. Any additional questions? I

have a question.

All right.

Kind of the kicker for us to to start progressing with this. And as you saw, we do have a kind of tight schedule and a lot of things run concurrently is the sample area. So, we we we would like to solicit your guys' in your input on that. I'm actually going to flip back to that to see if you have any particular opinions, causes, concerns on this region or if you have areas that you may think are better. Um, as I said, it's it really depends. The goal is to get a a good mixture of your types of infrastructure and either in what would be kind of your median income, your median condition, or average condition. If you're if you have a good split between new and old, which is kind of sounds is more where you're at, I would lean more towards old. So the um I don't think I have a arrow on this. Do I

be able to move the balance?

There we go. So the what we had kind of looked at was to go Hillsboro over down and cover that region because you up in here you have a you have you got some um

[3:05:54]

from what I can tell in communications with your staff you have some um open curb and ditches and then further down you're starting to go back into curbs gutters and pipe net network that works more and then over here like I said we had that that kind of major cross-section. Is there any other input you all might have on that that we need to be aware of or you think

I have a question. If we gave you the pl the spots in town that are flooding most often and you go uphill from that, would would that be a recommendation you would like?

Uh you typically would not want to look at all of your flood issues because that's going to be your worst sections. We do not you don't usually want to develop your utility on solely on your worst sections because that's going to throw your numbers [clears throat] way high. If we look at everything just in what's really bad, then we extrapolate that across the city.

Yeah.

Your numbers are going to go instead of saying your your if your average usage is is here, but then we measure your worst, we're going to the numbers are going to skew your average to it's to here. Um, so we kind of want to be somewhere more, like I said, typically median, but if you don't have a sort of median number because you have a big disparity in age of systems, we're going to want to look at the older section, but not heavily on your worst section. It wouldn't be if we can, we'd like to look at maybe one, which I from what I understand, this section over by the elementary school, I believe, is has does have some consistent flooding issues. And I think there's a section further up where there's a new development coming in upstream and downstream I believe of a cross-section, but we would want to be somewhere in your your more standard condition.

This is very much a flooded area and I [clears throat] don't know anything about the infrastructure there. I I can't recall whether there's pipes or or ditches. Um

you're looking at the left one on the left. Yes. And uh obviously the the area between the Chattam Mill and Hank Street, Thompson

[3:07:55]

Street, uh is uh pretty dense um and mostly residential and and significantly older. I feel like I don't know enough about your discipline and your methodology to recommend which of those two would be the better.

That's my question. Are you looking to for feedback on these two?

These are these are two and um in some research we have done and some communication with your guys' staff and different departments. This is two we've kind of come to as potentials

I suppose. But you're gonna either or if you want. Yeah,

it would be both. Um, but we did want to solicit your guys' knowledge and feedback to see if you had anything that we may have missed, may not have been aware of that might be perfect.

If not, that's perfectly okay.

Staff would have the most knowledge around these areas. Just work with y'all. That's my opinion. You go around, buddy.

That's it. It It wasn't really to force you to say something. It was just to wanted to open that opportunities before we before we get moving because once we initiate survey this moves quick in that regard. So we just wanted to open that door.

Do both.

You going to do both?

That's the intention.

So yeah, well that represents some kind of some upland development and some lowland.

Yeah. I mean the age of the properties are older. Mhm. Good.

Any other questions? Are we

got one? Is there any benefit to studying an older subdivision? Is there a benefit to studying an older well let's say a 90s subdivision because you've got here this is pretty much the historic district

in an area that that floods quite frequently but is there any benefit to studying a potter stone or a chattam forest or

it would

[3:09:56]

so if I'm understanding you're the infrastructure here is either more in historic we're going to be 90s or we're somewhere in the past 20 years correct there's there's not a lot of

30

it's like the last 5 years.

Mhm.

Probably the last 20

20 to 30 20 to 30 and then a lot of stuff that was built,

you know, but the 30 year old properties have water storm water retention ponds. Most of them

if you're in

we don't you don't want that, right? If it's in the within like the 25 to 35 year old range, you're unless you're experiencing degradation that you know of, it would be in the in in in the interest of this of the town specifically with the with the level of historic you have, it would be better to focus on that since it represents a large percentage of your um of your area. And then within somewhere in the 30 to 25 to 35 year old, it'd be better to um interpolate that they're more of industry standard and expectation that can that can really be um extrapolated from from standard operation unless you're experiencing consistent problems.

Okay. Yeah.

Because these would be like the areas of greater need where newer development would kind of like subsidize that through the fee.

Yeah. If you're not in in the instance of from what I've understood of the town, it would probably be best. Yes. because anything within that 25 35 you probably don't have a lot of maintenance needs yet that would really focus on that yet. You can kind of um like I said extrapolate that and and that's going to be you're still a good ways out from probably having to do much with it outside of standard cleaning make sure things are up to keep an eye on it basically maintain the your general concepts. Um but as far as like pipe repairs and stuff you brought up and be within range of that yeah

okay thank you. Thank you guys. Thank you.

Thank you very much. Have a lovely evening. You too.

All right. Um I may we're going to take a approximately 10 minute recess and come back at 9:05.

[3:11:57]

Oh,

[3:25:54]

All right, we're back in business.

All right,

good evening again. Um, so we have our third town hall design update. Um, Daniel Jinx is here with HH Architecture to present the latest iterations. I do have a quick schedule update and then also we have the results of our community survey. So this is this is updated with the I'll just call it the light blue um added to the design line item. Um, we're still tracking a completion fully complete project by the end of 2028. Um, so all I did was changed our construction duration from 16 to 14 months, which I think is is still um reasonable

early conversation with our construction manager. they've indicated a 12-month um construction duration and then you know I think we are all uh confident that we have the other uh tasks covered including the LGC approvals the bidding and then uh giving us a couple months to move in. So here are the results. the community survey, the survey monkey survey, we had confirmed respondents. Um, you can see option four, which Daniel will uh present, was the favorite by a pretty wide margin. And then the survey asked, what is your second choice? And so those who may not have

[3:27:56]

chosen option four as the first choice more or less well 31% of them chose option four as their second. All right. Any any questions about the schedule or survey?

All right.

I'm sorry, Ben. Mr. Schmidi. Uh that that's 506 validated responses. That's great.

Yeah. Good. Thank you.

Okay. [clears throat]

Appreciate that extra work, too.

Communications and it that worked through that.

Catching it.

Well done.

We have 500 responses from one IP address in a matter of minutes.

I promise it wasn't us. [laughter]

That's me.

Well, thank you all for having me again. excited to share these design ideas though I know you've already had chance to see them. Um also really excited by the level of participation in that survey.

Yeah, it's great.

Um before we jump into the exteriors, I wanted to recap a couple of things I know I've mentioned in previous meetings, but you you all haven't had the chance to see directly. Um starting with the site plan. Um, I know we've talked about the plantings that aren't showing up in our renderings and in particular the the street trees along Thompson. So, um, here's a preliminary landscape plan that we developed before our very first uh, board meeting. Um, that gives you a sense of that full scope of the perimeter planting um, really on all four sides. that side that isn't specifically called out with trees is u your existing kind of wetland buffer at the low point of the site. Um, additionally, you'll see the PA plaza towards the south, the twotory portion that we've sort of indicated as a staff plaza and that those trees,

[3:29:57]

those three trees there have not shown up in our renderings thus far, but I did want to point those out because they are providing shade for that plaza. Um some other things we've added in response to the last couple of meetings we've had. Um first and foremost, we have monumental signage at the vehicular entrances both um on Salisbury and on Thompson Street. Um we've also added uh a pretty generous sidewalk from Thompson Street to the uh what we're calling the front side of the building and that was in response to greater pedestrian connection between Thompson Street and the building. I know ideally we would have drawn kind of a straight line from the northern wall of the lobby straight to Thompson Street and we did look at that. Um we're facing some pretty big obstacles as it comes uh in regards to grading. Um there's about a 3 to 4 foot difference between that uh building elevation and the street elevation. It makes it really challenging to weave a path in there that will remain accessible. Um and then uh adding to that obstacle, we are also relying on a swale between the building and the road to both protect the building from runoff, but then also direct um runoff from our own gutters to the proper spot on the site. Uh so not only do we kind of have that delta to deal with, we also sort of have to bridge a swale that we're counting on for the storm water management of the site. Um, a couple of items we've added as potential or future scope. Um, I know we've talked about rainwater collection in the past. We've identified a spot that we think would work well with the roof plane um, for a rainwater collection barrel and we've also included that in some of the renderings you'll see today. At the moment, we're expecting that rain barrel to happen in a separate project um dedicated to some storm water improvements on the site,

[3:31:58]

but flexible there. Um we're also indicating with those orange diamonds areas of opportunity for public art throughout the the campus. Um one other thing to point out is the potential rain garden kind of halfway through the main drive aisle of the site. Um, that's a spot where we may potentially pipe some storm water and would discharge at that area, making it a great opportunity to use that as a rain garden. Um, and we'll look at a a rough estimate there uh towards the end of the presentation. Um, additionally, I think I've spoken about some of these exterior changes having effects on the interior of the building and we've since worked through some of those. I think you'll find they're they're pretty minor adjustments, but um wanted to point them out. Uh first and foremost, we have added the commissioner only exit door behind the desk, and you'll see that in rendering as well. Um other changes are a little bit more about responding to the more regular window openings of the more recent schemes. So, some office that offices that may have had two windows now have one. some offices that may have had a window nice and centered in that space are now pushed to one side or the other. That's really responding to uh committing to the regularity outside of the building and then kind of making it work inside the building. Um, another big deviation from the previous scheme is we flipped the commissioner's office with the commissioner's restroom on the uh lower level um legislative wing, lower roof legislative wing um to make sure that we can get a window into that space. It makes much more sense to have a window in an office than a restroom. So, we thought that was an easy switch to make. Yeah. Is

the width of that lobby east to west? the primary lobby.

[3:33:59]

Um, believe it's around 16 ft. I would have to check that for you. You're talking about the yellow public access area.

Looks kind of greenish to my eye, but

Okay. Yeah.

Bright yellow. Oh, are you speaking about the lobby in the commissioner's wing?

Yes. Okay.

Um, that might be 12 12ish feet. Then looking on the second floor, the really the only plan changes here we made were where the windows are in relation to the offices. Moving to the exterior options. Um we have two options that were really true um aesthetic changes to the option we selected the last time we met. So different color brick, different color siding is really what we limited the changes to. And then two options that take that a a little bit of a step further to try to grab some of the traits that we liked about some of the other options. um which we'll we'll get to uh as we march through this um list of options here. So, option one was really trying to soften and lighten the color palette. I think some of the feedback we heard was that the color looked a little too dark, maybe a little too dreary. And um by just choosing a few different colors, I feel like we're able to to brighten the facade and kind of soften it. Um, so we're using a lighter colored brick and a lighter color green for the siding. We're also introducing uh contrasting window trim and corner trim

[3:35:59]

on the fiber cement portions of the building. Um, which also often offers a chance to kind of brighten the facade. [clears throat] Then what that looks like from Thompson Street. Here you're able to see an example of what that monumental sign might look like. That would be both at Thompson Street at and at the Salisbury Street entrance. And then just to the right of the bicyclist there, you're seeing um a PA version of that pedestrian sidewalk to the front side of the building. Something else I know um we've talked about previously is the lack of street trees in this view. Uh we went ahead and roughed that in just so you get a sense of what that might actually feel like. Um we did not model in the power lines, but uh those are also there at the moment. [clears throat] And one other thing I didn't mention, you're you're seeing that commissioner only exit door at the corner of the building facing the drive. Then you're also seeing a rough idea of what that rain barrel could look like sitting in that position. Option two, um, wanted to not only brighten the facade, but also reflect the vibrancy of your community. So, we chose brighter colors, more saturated brick, more saturated green for the fiber cement portion um, while maintaining that contrasting window trim of the original scheme. then what that would look like from Thompson with trees. Option three takes that step further. Um, and we're calling it legacy. The idea that it's um trying to take more cues from the downtown character, but in a way that still feels appropriate to the context of this building. The way we achieved that was um an all

[3:38:01]

brick facade and then also taking some of those cast stone elements um like the window heads, the columns at the porch um to draw from that sort of downtown civic feeling. Um, one big deviation on this option and the next is that we did pull the um, boardroom roof, which is the highest roof you're seeing on the left side of the building, off of the two-story portion of the building, which allowed us to raise that porch roof up and give it more of a sense of presence, a little grander in scale. Um, and both this option and the next make that move. So the scale of the people in this [clears throat] depiction accurate is is that

I think we're looking about

six foot person.

Yeah, I think we're looking at about 12 ft at that porch. 11 or 12 feet. So um assuming the man's around six feet. I think we're right about there in the Thompson Street side. with trees. Last option we called heritage. And um as we were looking through Pittsboro um for other opportunities to draw um draw out some inspiration, we kind of rediscovered the Pittsburgh Community House, which is doing a lot of the same things we want this building to do. It's a a civic use and a kind of residential form. Um, which fits very well as a precedent for our project. So, our goal with this scheme was to kind of take cues from that building. Um, certainly make it our own and and adapt it to the form that we settled on. Um, but celebrate that heritage and and bring it further down Thompson Street to

[3:40:02]

this site. Same massing as the previous version, higher porch roof. Um, but we have now a stone base and then a a brick top. I should mention the stone would be a manufactured stone which lays very much like a brick. So from an installation and construction standpoint, you can kind of think of both option three and four as a brick building.

Those are not panels. That would be individually laid stones.

Stones, but manufactured stones. So they'll they'll be rectalinear and they'll lay like a brick. Um but full depth stone not adhered to a surface. Yeah.

So there's a there's a thermal inertia benefit there.

Sure.

Yeah. Absolutely. We will have continuous rigid insulation from from ground to roof as well. Um, something that's nice about pairing this system with brick is the finish system just stacks right on top of each other and allows that continuity of the layers behind it. That's the Thompson Street elevation and then with the street trees. Any questions before I jump into some pricing? Okay. Um, we wanted to also come uh back to this meeting with some pricing of some of the things we've we've talked about previously. Um, categorized that one in solar ads and then one in site upgrades. Um, these were generated in partnership with our uh construction manager, Edifice Construction. So, a solar system, we're expecting to add around $300,000. If we introduce a battery energy storage

[3:42:03]

within the building, we can expect that number to climb to 525. [clears throat] Uh, rain barrel is a likely ad of about 35,000. And then the rain garden, just round numbers here, 50,000. On the side of site upgrades, we expect each monumental sign to be around $50 to $65,000. Um, and then the sidewalk connecting Thompson to the front courtyard as concrete is about $15,000. And then with pavers gets a little bit more expensive at 35.

So those are brick pavers. And would you use the same brick pavers for the last option with that? Can I still Okay, I guess it still works. Okay, thanks.

Any idea what the specs are on those PV and battery systems?

Not off [clears throat] hands. could maybe follow up with RCM and and get you that information.

One question on the monumental signs. Is is most of that cost like getting electric out there or is it the sign itself?

The electric I would expect to get a bigger amount of it. We're essentially digging a trench to this location. Um, but something that I think it's overlooked is the the monumental sign is basically its own little structure. So, it'll have its own footings, its own substructure, and then the veneer brick on top of it. So, those costs kind of stack up. But

I'm wondering if that might be a art opportunity as well for the local artist. And I think hopefully it's obvious enough that it's the town hall. Um, and we might have an opportunity to, you know, have some local artists

create a uh Pittsville town hall sign

[3:44:07]

that's less of a structure. do a competition, have it illuminated with PVs, uh, PV panel plus batteries, LEDs. [clears throat] Then, as far as the exterior options themselves, the option one and two is really just a change of paint and material. So, that we expect that to be the same ad we showed you previously. Um, we didn't do percentages this time. We gave you actual numbers here. So, uh, we're expecting that to be an ad of 250,000 over the original design. And then option three and four being full brick, introducing those cast details, we're expecting that to be closer to a $450 or $450,000 ad. Uh, so Jonathan or Heather, um, what does that do to our budget and financing overall for either of these just exterior options, not the other add-ons?

So, it just means that we have to then potentially we're either going to be yes, financing more or we would be taking a little more from fund balance. Um it also could mean depending on how much more we are financing you know we might we will have to look at our budget in terms of how much additional financing on top of that we would be able to handle for other projects comments on options [clears throat] I'll jump in Um, you know, first, uh, thank you for doing to for doing this. Um, it's great. I I

[3:46:07]

want to emphasize what I think is the most important lesson learned of this whole exercise was that town engagement is so important. It is cost-effective and timesaving to engage the community in the beginning. And we found a way that worked when we had 19 was it 19 people at the community house meeting or something. It was a very low number. This worked and this was great. And this is what I mean by thinking outside the box and reach people where they are. And I'm sorry that you guys had to do that extra work because somebody tried to be where they were a couple hundred times. Um but when participation is low, it doesn't always mean people don't care. It means we didn't get the message out. So this was this was great. Um, I for me I feel like I need to listen to what the people say on on this because we asked them for their feedback. I the questions I do have is were they aware of the price differential the that this is going to be $450,000 more. So I got away weigh sort of I kind of got away weigh our fiscal responsibility to the town as well as their design choice. What was the second choice after the community house inspired one?

Don't know. Sorry.

Yeah. Was it the number two?

The brick.

See option three.

Both high cost options.

Well, okay. Because here here

has taste. Yes. Here's kind of what I'm I'm thinking. And I I totally value uh what the the town's feedback was. And in hindsight, I would have liked them to know the cost and also maybe the surround because while the community house is a cool building, it's unique in the fact it is unique. Having another thing competing with it, I think takes away from the community house. I also look at the surrounding area which I was

[3:48:08]

all the time and there is a lot of brick almost across the way. We have where Eds used to be and even though part of it was painted white. We have the mill. Who knows if they're going to open that up and expand it but they probably will. I would assume it would be brick. We've got Main Street. We've got historic. So I don't know if we just looked at the oh this one's pretty as does this fit here? Um, so I personally go to the second option, which I know is a $250 increase. I think it fits more with the area. I think it fits more I I think it doesn't take away from the community house. That is a unique building. Um, and it also saves us $200,000 by going that route. Um, but that's just my feedback on it. But

the option two, darker brick color with green accents.

Yep. That is that's my personal opinion on that. But I also have to weigh out that was a quite a big majority. But again, was that majority based on does this fit in the area and the cost? Yeah, because so um that's just my two cents.

Other comments?

Just throw my vote in. Um I do appreciate the survey. Um I feel like in that area that it is and being a government building, I'm in more favor of option number three. I just feel like that that brick gives it a a not power but government centered building and I think it fits the neighborhood better than any other option too. I'm going to weigh in also. Uh I I believe that option two, option one are both really in style right now, but 20 years from

[3:50:08]

now it probably won't be. So that's that's my input. I I I really like option three because of that reason. I like option two and four. Um two because it's uh less expensive and four because it's I like the the raised roof on the um entrance. If I had to choose, I would say option four. I was really excited to see the reference of option four to our community house. Um, and uh, but I'll hasten to say that I I I don't feel like I've got a strong preference of option three versus option four. I do favor those two. I think it's really interesting that so many people did favor the stone uh exterior. Um and maybe we need a little bit more conversation to try and flesh this out because it seems like we're we're divided. But, um, I've got some other comments as well.

I mean, I could definitely go with option three because I think the brick just fits in the neighborhood better, especially I'm I don't know what they're going to end up doing with the mill, but I can envision that it's going to come down and probably meet towards the road and they're probably going to continue with brick. That that would be my guess when that's going to happen. I don't know.

Um, again, we have the brick of Main Street. We had the break and I think the community house is so special. It stands

[3:52:09]

out. Do you know I mean you drive by it stands out. I think this is going to take away rather than pay homage to the the the community house. I I like the community house being that so unique. So I could definitely go with um option three. Yeah, I'd be fine with that. But because I I I think that just fits And it is a second choice. I

I think that what [clears throat] um I think we had options one, two, and three at the work session, right? And then I think the board consensus was a either one or two from the work session.

Believe it was different iterations of option two.

So all of these are the same massing of option two in the work session.

Okay. Okay. So, um, I think, you know, that's a that's a data point, but I think it's it's a difficult position to put us in not to put us in we put ourselves in a difficult position of going out to a survey and then, you know, I think there's overwhelming support for number four in that survey. Um, if it's a cost decision, I think it makes a lot of sense to go back to a lower cost option. If it's a preference decision, I think it's it's difficult to, you know, we go against the survey, I guess, at at this point to choose a similar cost option that was not the result of the survey. Um, of course, we don't know who answered the survey, you know, about but I I think that's a, you know, as we get public input, I think there's a, you know, reason to use it. Um, or to choose a lower cost option like you mentioned. Um just my opinion.

Will this be financed over Will this be financed over 30 years?

No.

10

20

20.

So that number

[3:54:10]

the $200,000 is financed over 20 years.

Okay. kind of because we we have to do a principal [clears throat] flat. So if the your first payment is probably close to a million

principal

and it'll come down. That way you're paying the same principle each year. But I think as staff we're more concerned with you all picking an option that you like. I really wouldn't make a decision based on $200,000. So,

I think you pick the one that you like and we'll make it work.

Can we as a process, can we eliminate a couple?

What?

Eliminate one or two so that we can focus on two choices. I appreciate you asking that, Commissioner Foley, because yeah, I'm happy to say that I I don't care for option one or option two, but um I have more important uh principles and and input that I'd like to offer. But let's continue that. I think

from the feedback, option one is easy to eliminate. Yeah, I

think we're down to option three and option four. I feel like uh you know I certainly understand uh trepidation about the higher cost. Um I'm not eager to spend this money. However, I do think that it's important that when we're thinking about building a new town hall that we think about it for the long term. And that's how I'm contemplating this decision. And again, I'm happy with uh I'll go with the board majority on option three versus option four. I think um yeah,

[3:56:12]

other discussion.

Fine with option three. Commissioner Frell and I picked three, right? Yes. Sorry. So,

I think you made a very good point, uh, Commissioner Foley, that um I think you made it that that was going to be that that building does have a lot of longevity.

Yeah. in and a grandeur

and and I I do want to just say that my personal preference is not in any way more important of the wishes of the residents who responded in this but I think we are considering a few things that they may not have considered such as they looked at what it looks like. I think we're looking at a little bit of a bigger picture. Um so their input is extremely valuable and it's definitely being taken into consideration as a strong uh factor in what we consider but we do have other things to consider not just does it which is the prettiest.

Sounds like it's option three.

Okay. So on on that note, um I'll uh take us in a slightly different direction. Um focusing on on option three. Uh I'd like to strongly encourage the board to reconsider the darkness of the roof. Um that's going to be a an impact on uh cooling the building. Um, and it it also seems to be a little bit um I don't know, more of a modern trend than a a local tradition. I don't think that we can go with copper like the courthouse roof, but um do you do you have other ideas?

Um if emissivity is a concern, I I typically go for metal roof. I know a

[3:58:13]

white metal roof is slightly better performing. Um, but most of the data I've heard is a metal a dark metal roof is still better performing than most other systems you would come across. Um, I don't think we have the opportunity for like a white membrane here um, without totally transforming the look of the buildings. Um, I I I think you're correct that we could improve the performance slightly by switching to a a brighter metal roof, but I'm not sure if it's a um an improvement that would warrant a big change from the from the elevation. Um I think the bigger uh need here is that we uh invest in the future again. Um and I feel so strongly about this that I decided I needed to actually prepare my thoughts in writing. So if you'll bear with me, good design starts with the relationship between the building and the street. Buildings face the street. Front doors connect to sidewalks and walking is a natural and convenient way to arrive. Together, those choices create a welcoming public realm. Our new town hall should embody these principles and model the development we want others to build. Sending pedestrians around the building preserves a design organized around cars and parking, and it misses the opportunity to make the street itself an inviting civic place. So, we're building for generations of residents with this building. This is a new town hall. Uh, Commissioner Frell, you pointed out that it it has a a presence to it. The solid brick, uh, it's governmental. I would say it's grand. And, uh, I think that's right. I think that's the kind of investment that we need to make for the future. And um

[4:00:15]

since we're building for generations of residents, I think including the vision of inviting more people to walk into our town hall on foot is appropriate. Uh in future, transportation is going to be more expensive. People will choose to walk more and um perhaps some will choose to have a car-free life. A welcoming north side public entrance is fundamental part of that vision. Um the grade is a design challenge and I'm confident our staff and architects will find a cost effective effective way to fulfill that requirement. Um, so I move that we approve version three, option three, subject to u an emphasis on sustainable landscaping, shade trees, and a public entrance on the north side of the building with a direct accessible connection to the adjacent sidewalk and open during normal public business hours.

Is there discussion?

Is there a second?

I'll second it. discussion

discussion.

So, um I see where Commissioner Bonnets is coming from, but I differ in uh my view on this in one way. He sees that in the future we will go carless. I see that we're going to have a lot of cars for the duration. And what I see is right now East Street is already becoming a little problematic. Um, East Street is a road that um, I know we need to widen and the funds aren't there. And I think a lot of people are going to be using Thompson Street. And this is not a has not a design thing, but I think a lot of people are going to start using Thompson Street. They're going to come off 64. They'll come up the side. They probably will turn at Elizabeth, the very last turn you can left turn that you can make

[4:02:15]

before you hit downtown. That being said, I and I can't wait till we get our transportation uh person on and and uh have some a townwide TIA done, but I think we are going to eventually have to widen Thompson Street to accommodate traffic, which may be actually less expensive than and uh quicker than waiting for NC DOT to move on East Street. If that's the case, would and we do have to widen that area, would that handle some of the grading issues so that the entrance he's speaking of could be constructed? It

definitely offers you an opportunity to to look at it. Um, I'm not a civil engineer and I think they may have left, but um, I think to widen that street, you're probably looking at filling in a portion of this way that I'm talking about, which is certainly going to um, give you an opportunity to level up grade. I do still worry a tiny bit about um accessibility because now you're pushing that high point even closer to the building, giving you less amount of space to work um to make up the grade. Um but there there are solutions that we could look at. um

bridge or a

potentially

bridge structure that like a bridge

actual ramping which will introduce rails which I don't know if we would love the aesthetic of but would be an option to connect two points. Um, I think my my concern now is we need to I I appreciate the faith in the construction schedule, but um I think it's it's difficult and um I think we need to make make an informed decision tonight and

[4:04:17]

that's an option that has been reviewed and not I think found feasible easily. But I mean it would have additional cost. Um and I understand the significance of the structure over time and in its lifetime. Um but I think that that's a you know that would represent an additional cost. There's some site considerations maybe shifting the building that's going to set us back further in the in the construction and the and therefore the cost as well. Um that's my concern about that. appreciate the changes that that y'all made for this with the the brick sidewalk going off of there and connecting through. Um I think it's a good compromise for those options. If anything, I'd like to see the sidewalk on Thompson come in a little bit and get away from the road if we could move parking with the traffic [clears throat] calming device.

We have a motion. What can you repeat the motion because I don't remember exactly what you said.

Approve option three, [clears throat] solid brick subject to an emphasis on sustainable landscaping, shade trees, and a public entrance on the north side of the building.

Can you show us a map top down map?

You like the site plan?

That one's fine.

So, where are you proposing the walkway, Mr. Bonnets? ing to the glass. Okay. Or your

would be an entrance instead of just a glass wall. Right.

Right.

I don't think it's up to me to prescribe whether or not it's a 90 degree angle or a 45 degree angle or

switch back. Potentially have to do a switch back because of the gray change. Would you consider redoing your motion to approve the building um

[4:06:18]

with uh the option to look at that entrance? You know, like give you guys an opportunity to see what could possibly be feasible, what it would cost, and then we could revisit it. But that is not going to take up, you know, any more time and we can get moving on it. do a bid alternate for that.

We could well

assuming it's it's feasible.

Yeah.

I think a bid alternate situation from what I'm think I'm hearing is this is an option and then could get value engineered out and this is a point of principle that I'm asserting this is how we should build the building and find a way to make it happen. So, um, that's my mom, that's my intent with the motion. Um, don't want to entertain the idea of, uh, uh, anything that doesn't affect that.

So, there is no sidewalk there. Now, obviously, on in the drawing, is there a door that the sidewalk would lead to? Is it that black?

There's no door in the

There's no door. So, it's not just a sidewalk, it's a door also. Correct. That we'd have to be building in

the glass lobby would be where the door would be.

Okay. Where the glass vertical.

Mhm.

I

I would think it'd be less expensive than having glass on both sides. Maybe I'm wrong with that. Now, as you know, I I that was one of the things I wanted from the beginning, and I I brought up that I I wanted the entrance and everything. I still want that entrance, but I can't I don't know how I [clears throat] can say make it happen without us knowing how much it costs. I I think I I I really think we need to know what the cost is because even our though we have the

[4:08:18]

principles, we also have the principle of being fiscally responsible. And let's say it is another 500,000 to do it. I don't think it would be, but let's just say I can't I don't know how we do that. I think I think we instruct uh to go forward and and figure out how we can do it and then let us have all of the information on doing that entrance. If there's a way to do that entrance, I'd like to do that entrance, but I c I can't say cart blanch to to doing that entrance w without the numbers. But I I would love to see how we can make it happen.

I I want to I want to bring a point up. I'm just thinking about it right now, but there might be a point in our in our lifetimes where we're going to need a security

uh screening. We have two doors, then we would we lock one uh during town hall meetings. So I I envision a screening for weapons at the traditional door that would go into that is on this south side of this drawing

and then uh for town hall meetings but if we have another access on the other side we shut it down or how do how does that

metal detector at both doors?

Oh yeah

has something he would like to say. Yeah. Also, Mr. Listen, depending on what happens, we if we're have to look at it like I apologize, but if you have the receptionist up closer to this front thing, this front for coming in now,

you're going to have people coming in off of Thompson Street that now you don't know who's coming into this building. Um unless you somehow another you re rearrange that to where the receptionist or admin assistant whoever's out there is able to look both ways to see somebody coming

[4:10:19]

into the building and we don't know you know 10 years 5 years a year from now what kind of security issues are happening because and and you know there's y'all have put y'all put a door in and want a door in you know behind y'all's desk and and part of that will be for security. So I think we need to think about security for the the people that are working in this building. So that would be my that be my two.

My impression is that's a pretty significant change with the grading and then adding a vestibule to that face of the building. Um I think it's going to be a bigger change than we than we think. It's to just it's not just putting a door in. There'll be other

That's right. right ratio.

The easiest way to make the path work would be to raise the finished floor elevation of the building, but we would be looking at raising it 3 to 4 feet. And that's all import. What's dictating the finished floor of the building as designed is balancing the site. So, we're not bringing in or removing any soil from the site. We're cutting the high and using it to fill the low. Um, and so it's exactly balanced right now. I think that value was a um a six figure value um before we balanced the site. Just one comment I'd like to make real quick and I'll if we have a door on the front on the north side, all our parking's in the south side. I mean, if you're not walking in, you're not going to go to that front door to enter this building. You're parking in the south side. you're going in that entrance where the colums are. I think that's a large expense to have a front entrance when somebody can just walk down to these pavers and walk around. If they're walking, they're just going to get a few more steps exercise. That's that's a lot of expense to to go into to

[4:12:19]

put a door there that's going to be very useful or very usedless. That's all I got. What about just putting a walkway from that sidewalk around to the the end?

They added one.

Yeah, we added that as the compromise to get folks from Thompson Street down to the the entry.

They added

Oh, yeah. That's nice.

And we do have sidewalks coming down Ja Ferrell, right? And Would there be the opportunity to come down and also have another walkway curve around where the um stone patio, which is going to be the um

There is a walkway there.

There there is. It's so that there I can't I'm so sorry. I can't see very well. [laughter] Um there is I I just want to make sure that there was the sidewalk and then we'd have a walkway and a pathway up to the the thing as well so I could not have to walk all the way to Thompson and around

about a mechanical yard on on J.

I actually can't see either. I think they're probably trying. Yeah, we're putting sidewalks curb and gutter along Ja Ferrell.

Okay.

All the way down to the corner which will tie into the Salsbury Street sidewalk project that we currently have funded with uh CMAC money. Okay. [clears throat] Is there any other discussion on this motion? [snorts]

All right. All those in favor say I.

I.

Any opposed?

Nay.

You don't have to. The sidewalk satisfies me.

Nick.

Okay.

Sorry.

Motion fails. There another motion.

[4:14:23]

Like I'd like to make a motion to move forward option three with with the glass in the front.

Okay. Is there a second?

Which one is it?

Second.

Commissioner Huner.

Discussion. Option three is the brick. Oh, back.

You have a second.

Yes.

You got a second already?

Yes. Commissioner.

Any other discussion?

All those in favor say I.

I.

Any opposed? Motion carries. Thank you. [clears throat]

Thank you.

Up next is about the downtown Pittsboro logo. Teresa,

I just want to say congratulations that you all just picked a town hall for the town of Pittsburgh.

I know.

Exciting.

It's a big deal.

Excited.

Thank you for your help.

You're Thank you.

Good evening, mayor and commissioners. I'm going to run through the slides that the marketing consultant elsewhere they created. Um, so this is the presentation that was given to the downtown advisory board. And so the consultant began with having a workshop and interviewing stakeholders. Um, when they presented it to the downtown advisory board, they discussed a theme, a few themes that kept coming up, including downtown being welcoming, unique, and full of people that care for each other. Um, the conversations gave the consultant direction for the design, some of the the words that were included

[4:16:24]

in that. Um, which then brings us to the goal for the brand, which is to give downtown Pittsburgh a brand that looks and sounds like itself, so it stays distinct as everything around it grows and people consider it a place worth claiming as their own. Um, the framework included uh what helps downtown stand out. strategy was what was leaned into um basically being what people already love about downtown, especially its independent spirit. And um some of the stakeholders, uh the interviews, one stakeholder talked about how easy it is for towns to start to look alike and that a downtown can give a town a unique identity. Um, another interviewer mentioned how the locallyowned businesses helped downtown and the town of Pittsburgh feel more personal. Um, so all these ideas came together to help create the brand story, which is basically rough edges welcome. Um, that captures the idea that people can come as they are. It gave the consultant a way to translate the welcoming, slightly offbeat character into the logo design. And then looking at the proposed downtown Pittsburgh logo, here it is. Um, this is what was recommended by the downtown advisory board for approval. [clears throat] There's some variations of that design. um different shapes that could be, you know, a little more flexible depending on how it's utilized. The consultant also came up with uh a P burrow option.

[4:18:25]

Um the thought behind that was PBO is is used as a hashtag for lots of different organizations and such. So Puro would be a little more unique. And um here's how it can be used for merchandise and marketing of downtown Pittsburgh. And the tote bag has that cool traffic circle design which uh a lot of people really like that and how it can be used on the town's website as an example or the downtown website, excuse me. Other ways it can be used is the social district branding. Also, our volunteer t-shirts taking on the the pit being like pit crew for like events. And something else that they added was how it can be utilized to create like a identity for the program itself. So whenever we explain what the program is, we just say program. Um, and we got this idea when we visited Conway because Conway is called Conway Downtown Alive. Um, so if you go to their like Facebook page, that explains the group of people that create the the the downtown community. So that includes um staff, uh town board, downtown advisory board, all the volunteers, small businesses. Um so basically all the stakeholders that work together to help create a connected community. Um so two examples could be downtown Pittsburgh Thrive and then also downtown Pittsburgh the collective. Um, and with that, I also wanted to mention that uh, you know, with the advisory board speaking tonight and the

[4:20:26]

conversation being about parking that it was mentioned that we are doing a downtown master plan um, and a parking study update. So, just to give a little bit more context to that, the master plan is going to help us address a lot of the more comprehensive uh concerns that you see for downtown and how it's going to grow. Um, and the parking study is going to be an update to what was done a couple years ago. The original parking study was basically like a snapshot of what the needs were at that time. So, when we do the update, that's going to be looking at future growth uh concerns. So, assuming that downtown Pittsburgh is going to be 25,000 people in 10 years, which is where we're heading, um we can look at that and say, okay, well, that the parking concerns are going to be XYZ. And then not only what are they, how do we get there, how how do you fund that? Um so we do have a plan in place to also help you know next steps with that conversation. So with that um the request is to I think that's the last slide answer any questions you have and um recommend uh approval as uh recommended by the downtown advisory board.

Any questions for Teresa?

No, but I have comments. Um, first of all, I just want to start by saying that I respect um, Pab and the downtown advisory board and everything that y'all are doing. I think you're doing a fantastic job. However, I don't feel once again that there has been broader community input in this and I think that is just essential. Downtown Pittsburgh belongs to all of Pittsboro, not just downtown businesses or not just down, you know,

[4:22:28]

people on the advisory board. It's about the residents and I really really feel that they need input on this. Um, recently I had an article shared with me. It had to do with the logo and I think it was Farmville, Virginia or something and the logo was changed or taken down and people didn't have input in it. And I really think as we learned that lesson with the town hall, we need to have input from people because they need to be proud of this logo. Now, my personal opinion is not as important as broader community engagement. Personally, I do not like this. Uh the the font to me looks very Cartoon Network. I don't think it is very reflective of Pittsboro. To me, I see pits and I don't want people go, "Yeah, I live in the pits." Um, Pboro, I don't get I don't know why we changed from PBO, which was starting to gain traction. We have businesses that have t-shirts that say PBO on it. Currently, your Facebook page for downtown says downtown PBO. So does the other thing. We have PBO 101, which we had graduates from tonight. PBO is associated. So, I'm not sure why we changed it. Um, so I I kind of think we need to go back to the drawing board and get community engagement and and could you just give a little bit of background on why we we went from working with PBO to And I like Pick Crew. That's really cute. We still have that, but why we we did this. this I mean did we consider top t or just puro um I'm not sure exactly who came up with the initial idea I think it was the consultant on the P burrow top was never uh included in the conversations um I think that's more like town of Pittsboro

[4:24:28]

I'm sorry that's internal memos that we wants to use.

I don't think we would use that for like branding for downtown. But P Burrow, I mean that was I think that just came about from the consultant looking at trying to think of something a little more unique.

I just I hear people say I live in PBO. What's going on in PBO? Things are so I just I I just don't get the change. I really But again, that's my personal opinion. And if people in Pittsburgh love this and they like the pits and the burrow underneath and they want that, I 100% want it. But I think once again we need community engagement process.

Can you talk about the process a little bit of selecting the consultant and the the the [clears throat] recommendation from PTAB? How we how

a little more maybe?

Sure. Um it was a selection committee uh that looked at all the different uh uh proposals that we received. I think it was like 15 20

a lot.

It was a lot. Yeah. Um and committee was a lot or the amount of it was I'm sorry which was a lot. What was a lot? A lot of the proposals that was received. How many people were on the committee? Uh probably six. Who were those people? Um all staff and we had a downtown volunteer as well. Um so the selection committee uh went through this process like the workshop that I showed. [clears throat] So the consultants looked at the results from that and then also the stakeholder interviews. um came up with initially I want to say about 20 different concepts

[4:26:30]

that uh over a couple of um sessions brought it down to this selection uh which was then presented to the downtown advisory board. Um I think there was some questions about it someusion. So, uh, what we did at that point was the consultant created two additional, um, logos based on feedback that they received from the downtown advisory board. Um, so then this one, two others that they created and then two from the original 20. So five I think went to the promotion pros team, which if you're familiar with the program, that's kind of like the worker bees. Um, and so they're the group that was uh originally tasked with with looking at the marketing plan. Um so they looked at it and chose uh the the same one out of the five. Then it went to the committee, same recommendation for approval and then back to the advisory board for the same recommendation for approval.

No community engagement. the community represented in all of the advisory boards that we have and the different committees that approved it.

I was there the night that it was presented to PDAB and there was only one participant and that was that was Mr. Henry. He was the only one from the board that looked at the logo. So I don't feel like that's a really good representation from our community. And and one of the things that when we were talking about the advisory boards and again I

you aren't a great representation. You are a great representation

but one of the things that we asked when we were talking about the advisory board policies and and what their responsibilities were was to [clears throat] do more community

[4:28:30]

engagement. And people in PAT my god they've got the best circles they know everybody. they have the opportunity to really uh get the uh get ideas and feedback and that I it in an ideal way I would have loved to feedback for PDAB to do some stuff just like the survey maybe pull some ideas from people and then take those that feedback give it to the uh marketing company and say this is what we're getting and then work on it I just don't feel like the I don't feel there was enough community engagement for this. And I could be so wrong. You could put this up and you could get a 100% of people going, "Man, y'all nailed it. That's the case. I'm 100% going to vote for it." But I think there I I think anything like this, this is representing the town and everybody needs to be proud of this. And that again does not take away from PDAB representing or even parks and wreck. We've asked them to engage with the public more to find out what the public wants. It's again, it's just process and involving the community. [clears throat]

Am I did I understand correctly that this if if we don't approve a logo tonight that that's kind of getting in the way of um the wayinding signs that you're planning? I

think um ideally we would want the logo just because it's more representative of like the feel I think you know of the signs as well. So, we've had that conversation with the consultant. So, I I wouldn't I don't want to answer for them that we could not move forward with wayfinding and directional signage. Um, but that's the input that we received.

Can you talk a little bit about the consultants? What do they know Pittsburgh?

They're out of [clears throat] Raleigh, so far.

They interview community. They did

[4:30:34]

Correct. Yeah, that's when I when I mentioned the stakeholder interviews earlier and I quoted a couple of them.

They interviewed me, but I don't feel like um this is a good representation of what I said.

Like to make a motion that we turn down this logo. Not to say it can't be considered as one of the logos, but ask Pab to do some community engagement to revisit the um revisit using PBO um and uh give some once they engage with the community, get some uh feedback, go back to the branding company and then present uh some other logos and this can be included in it as well.

Sorry. answer.

All right. Um, neither.

Is there a second to the motion?

Second.

Okay. Any discussion?

I love the Go ahead.

Just one question. You talking about the way signage and all like that. Do we not have like the holly tree on our street signs?

You have the the town seal.

Right. Okay. We had started with the town logo like the the half uh moon if you will and knowing that that might change in the future and the seal is likely to change unlikely to change we we we started using the seal instead.

And this this logo still will not have anything to do with the town logo regarding the half arch with the holly tree. Right.

Well, the half the half arch kind of was being used as the town logo.

Yeah.

And we've since kind of remove the archway over it. So, it's more kind of a simple go.

A trend. Um, this original approach was our our aim was to, you know, downtown had been, you know, for quite a while

[4:32:34]

asking for marketing materials and asking the town to do more marketing for downtown. That was the whole goal. Lo, the logo wasn't even a thing that we wanted to do because logos are emotional and they're difficult to to put together in a community. any community really. But once the once the group got going, they felt like we needed to do a logo refresh so that way everything else they were doing kind of had a base point. [clears throat]

When I think of Pittsburgh, I think of PBO [clears throat] and it's everywhere. It's ubiquitous. It's on bumper stickers, on the backs of cars. People have them on the laptops, t-shirts, and the other iconic image I have of Pittsboro is the town the town hall, excuse me, the corn.

Yes.

And [clears throat] we need to explain what this doesn't represent Pittsburgh. This is this is to me this is not Pittsburgh. And that's why I asked who what selection committee you used. Um it's pretty cool graphics, but to me Pittsburgh is PBO and it's the um it's the um I drew a blank. It's a courthouse. Period. Why aren't we using that?

To interrupt you, but didn't we over the courthouse at the uh drone show have PBO go over it? just seems to me, you know,

should be considered and presented.

That's how our

moving forward. We had this conversation at the advisory board level that the promotions pro team is coming back into the conversation of the next steps, which would be the welcome to uh Pittsburgh billboard, the branding kit, our templates, wayfinding signage. So

[4:34:34]

that's going to go through the program um and [snorts] explaining like that the purpose of what the teams are being the worker bees. Anybody can be on that. So we open that to anybody, not just advisory board or committee members. It could be someone from the community um that would like to be a part of that. And uh that kind of gives everyone a chance to kind of pick and choose projects that fit their level of interest or expertise. Um so we already have a team in place. Um and if anyone else is interested in being a part of that conversation, let me know. But uh moving forward, the team would be working on these projects. They would also be communicating um up filtering up through the committees downtown advisory board so that by the time uh future products are submitted for approval there won't there wouldn't be any surprises. There'd be plenty of opportunities for feedback. So that was a lesson learned. You know I think what our intent was with uh the selection committee being mostly staff was trying to streamline it a little bit. Like Jonathan said we weren't even originally looking at a logo. um we thought that was lower on the priority list but at the same time talking to the consultants it seemed like we needed to start there.

I have a suggestion uh a built-in focus group we have is PBO 101. You'd be able to sit down and individually and say what do you think about this? What do you think about this? These are active people that are totally involved with Pittsburgh and it's it's a great resource and we could start using them as well. Just what do you think?

Five five years been going. And so

I I think if if the primary feedback is

[4:36:34]

PBO versus P burrow, then I could see how that could be changed [clears throat] easily to accommodate that. But I think it's a a unique logo. I think it's interesting and I think there's as many opinions about logos as there are logos for people probably as well. And I'm very sensitive especially all the downtown people that were here standing room only at the beginning of this evening. Um I I don't know what that feedback is and I have not been involved in in downtown um intentionally in many ways but um I'm concerned about getting all this feedback through all these committees and getting to this point and then asking to go back for feed feedback or or a survey or public input. And if we do that, I think we need to be very prescriptive about the factors that we're asking about in that survey. Um the additional cost to go back and make additional designs or whatever that might be because we just went down that road with a town hall with a survey and then didn't choose what what the public chose. So I think that to go back on multiple committee recommendations, not select those, ask them to go back for more input. I think this board would have to be extremely prescriptive about the way they want to see that input to to override all the the work that's already been done on this.

So your point is that we should move forward with these. I think they're fine and I think and I think they're pretty interesting like Pittsburgh is pretty interesting and pretty different but

we're gonna be the

pit let me finish

we are Pittsboro um but if the primary feedback is PBO which I don't disagree with I think these smaller logos could be changed to incorporate that um or there could be a desire to not use that square format of it or something as well But I think, you know,

discard it and to go back at this point

[4:38:36]

um is a lot of wasted

time and and effort and it's probably a lesson going forward about how prescriptive the board is about uh items like this in in the future, [clears throat and cough]

which is why I think that the the comments about process are are important. And um it seems that this uh came out of a process of not a whole lot of involvement. And um I I don't favor the square version. Um I'm sensitive to the u the isolation of the word pit. Um, I favor this version um of this bunch and I really wish my only other comment is I really wish that we could go with something other than orange. I would sooner prefer red but just doesn't seem like there's much about

there's other for a tradition or culture that has orange in it. There there's a template a color template so you can change the colors too.

Yeah. [clears throat]

Other discussion.

Everybody remember the motion?

You appreciate it. as as best I can and move to send this logo back to PDAB, ask them to have a little bit more community engagement, give new direction to the marketing company to incorporate PBO um and then bring back the design and they are more than welcome to submit this as well, but to have public feedback before

[4:40:36]

uh giving instruction and then get that public feedback and then come to back to us. Is there a second?

Second.

Any other discussion?

Second already.

Oh, Mr. Huninger. And then

sorry, that's right. Okay. Um,

discussion.

Yeah, discussion. Um, Teresa, do we know if there'd be cost associated with redesign and more work and how much that would be?

Not sure what the additional cost would be, but there would there would probably be additional costs at this point. Um, and uh, as I explained moving forward, what we typically do with with projects with uh, downtown projects is it goes through a process which is through the teams and then up. So, you know, the the advisory board, they only meet for one hour a month. Um, where the teams, you know, they meet as needed throughout the year based on what project we're working on. So I would recommend that if it is going to go back that it's it goes through the process um with the team and of course the team includes people from the advisory board and committees and then others as well um and they can work with the advisory board get direction from them but to kind of start over and have it be that group doing it I think is going to ask a lot from them when they have so much on the agenda already each month. How how about if I rephrase it that um we move to have PDAB revisit the logo for PBO and come back to us after getting community engagement on the other option and this option and then

[4:42:38]

what's the other option you're saying?

Well, whatever they come up with with PBO. So just the PVO versus designs.

Let's keep I I I just don't know how to say I mean get some new designs to show us. Um, I really want community buyin on these things and I'm sorry if that um is like the town hall and we did take into consider consideration we went with their number two pick on the town hall [clears throat] but we do have other things to consider not just just the aesthetics. I would like to have community engagement. This represents everybody in um Pittsboro and I want them to love it. So,

and I don't think anyone would disagree about doing a survey. I would say, you know, not leaving it to that the survey results for sure. You know, letting the downtown advisory board have more discretion. Um, but just to be clear on what your recommendation is and the process, uh, my only input would be if if we can go through it, our typical process is that

work very well and all the groups work really well together. um that communicate and it's you know it's just something that has been what we've done for several years now.

So I make the motion that we revisit the logo using PBO according to uh your normal process of doing it but add in community engagement before bringing the logos back to us and you can also include this logo in the community engagement. understand that

we just a bit of clarification because the firm created what 20 logos. It was a bunch. So we could potentially Theresa could have them whittle that down again. Maybe put five

potentially. Yeah. The promotion pros team never saw the 20. They only saw the

[4:44:39]

five. So we could go 20 again that the firm's already created. Whittle that down to five. Put the five out for a survey. And then is there a particular number that you all would like to see back like a top two, a top three?

You can rank them

defer to

pick out the bottom one and then bring the top or just bring four.

But but do those designs that exist are any of those PBLO? I would again if we're going to go back I think it just needs to the 20 can be looked at by the team for sure but I think it needs to go through that process.

I wouldn't want to say that it has to be one of those 20

because then you know they weren't included in that original conversation and they haven't seen them. No one has seen them. So

I want to say enough.

So I think your motion probably still works.

My motion then still works. Can we be any more prescriptive about how we want them to get that public input? Is it a survey or we want them to consider it? Because I'm I'm trying to avoid where we ask you

you guys have just a second. Um [clears throat]

we have you guys go ahead.

No, no, no, no.

Um apologize.

So went through the survey. We we did a survey and then we went back and had other considerations. Are there any other considerations we can think of at this point or do we not want them to do a survey? Do we want them to do a certain form of community engagement? Because I want to make sure that if we're asking them to go back and redo it that they bring us back what

I think there's enough people on PDAB um for the community to have a voice outside of um doing a survey online. I think there's we're represented. Um there are a lot How many members are there and how many people show up to

[4:46:39]

those meetings? Typically 15 to 16. We have a couple of um open seats right now from a a couple organizations on exeicio. But um yeah, and again we can we can do a survey and just get input. Um, just not saying that that's going to be the fin based based on what the decision, excuse me, the decision is not going to be based on just the survey. Of course, what I would hate to have happen is that we invest money in this hat and these bags and we have a whole bunch of them and everybody hates it and nobody buys them and we're sitting on all these bags. So, I do think we need some community. I think Pab and the 16, 15, 16 people should come up with what they like, put it out to the community. the survey was very very effective and then let the PDAB interpret that and bring it back to us. Okay. Can that's the motion.

That's a long motion.

A second.

Can we

or I guess John is in

the motion changed so it doesn't need to uh

looks like she has something she wants to say. use incorporated in the first motion.

What he said two minutes ago.

Yeah, I felt like it was I felt like it was fine.

I think we just let Teresa do her thing and she'll bring something back in a couple of months

or longer. You good with that?

Does everyone agree with that?

Yes. Okay.

Do we need a motion or idea motion and a second. I

appreciate a formal motion, please. Okay. Formal vote.

A formal vote.

All right. All those in favor of the most recent motion,

I opposed.

All right.

[4:48:40]

Understood. That's lots of back. Thank you.

Don't worry about it. We're not going to bring you any more logos. Okay. Next. All right. Up next, we have a review of alleged code of ethics conduct violations. As we begin, I want to clarify why this item is before us in the process we're following. First, this is not an item that I brought forward on my own initiative. It arises from concerns raised by board members, multiple staff members, including information received through exit interviews, the former employees, and members of the public. Our adopted code of ethics and conduct establishes a specific process. Complaints are submitted in writing to the mayor or the town clerk, and the town attorney and the presiding officer determine whether the allegations, if true, would constitute a violation. That's the process we followed. My role in bringing this item forward is a responsibility assigned to me under the policy, not a personal decision to pursue the matter. North Carolina law generally requires governing boards to conduct their business publicly except where a specific exemption permits a close session. As elected officials, we are accountable to the public for our conduct and actions. My role tonight is to facilitate the process. The responsibility for determining the outcome rests with the board as a whole. appreciate Commissioner [clears throat] Bonis's remarks and apology earlier this meeting and I'll let him start off with an opportunity to speak. Um well I feel that I've spoken. I have a request for evidentiary proof that this is an issue. What facts do you have, Mr. Mayor, to present to us?

[4:50:41]

uh what we have is what was presented in the packet that that we can share publicly based on employee privacy and things like that in the recorded meetings. Well, I've heard two apologies from the commissioner. We are in a profound growth spurt right now when it comes to town of Pittsboro. so many changes and uh I I see one commissioner especially that sometimes I do not agree with but his minority voice needs to be heard. Uh what he says helps the board in directions that some of us don't ever even see. Commissioner Bonnets has that in his favor. He's been he has spent the entire evening apologizing. He apologized last committee uh commissioner meeting. I feel I feel it's really important that we as a board stick together and that the the daunting tasks and responsibilities that we have coming up, the town, the people of Pittsburgh and the the news stations, whoever is going to be picking this up have to understand that we are a group and we're a united group and I for one do not want him apologizing any longer. He is my brother on this board and uh I value his opinions. He made a mistake

[4:52:41]

and I would love to hear some from some other commissioners regarding that. I would like to start by saying um mayorship when I spoke to you um and shared my concern about that night it was not to um cause an ethics review. It was asking for help from the leader of our pack and asking for you to show leadership and to help the situation and fix it. not to do this. That's what I have to say.

So, um I'll begin by making it clear that I support our town staff and I believe everybody deserves to be treated with dignity and respect and if somebody's delivery is inappropriate, it should be addressed. But I think there needs to be a real important distinction between poor communication and an actual violation of our code of ethics. Um, and and I'm not dismissing anybody's concerns. I just think we need to be very careful about equating discomfort or disagreement or perceived offense with unethical behavior. Um, and I am sorry I'm reading some of this because I don't want to leave anything out. Um, Commissioner Bonnets has acknowledged that his delivery could have been better. He has sincerely apologized and I really believe that matters. Um, people should be encouraged to recognize when their approach could be improved and give them the opportunity to demonstrate that improvement. Um, I also worry about the precedent that we are setting. Commissioners have a responsibility to ask difficult questions, challenge recommendations, and engage in vigorous debate. And we will not always agree, and we will not always express ourselves perfectly. And if we treat, you know, every uncomfortable exchange or passionate

[4:54:42]

disagreement as a potential ethics violation, we risk discouraging the very oversight and open discussion that this board is supposed to provide. And um I am not in any way suggesting that genuinely abusive or harassing behavior should be tolerated. I'm just asking that um or I'm basically saying that we can support our staff, consist on respectful conduct, and still protect the right of commissioners to question disagree and advocate and advocate passionately for what they believe in. Um we are five commissioners and we have different views on things. We have different personalities, communication styles, perspectives and level of passion and some will always be a chance that any one of us could deliver something that is less than ideal and disagreement is not misconduct. Um, again, I appreciate the fact that you as publicly as you made the uh what is being considered an offense. You made a public apology. That takes, and I'm not reading this part, that takes humility. That takes integrity. And that takes character. And that those are not uh those are not characteristics of somebody who acts unethically. And uh the last part of this is to kind of speak on what Commissioner Thurber just said and and mayorship when we talked about this I said that we kind of all bear a little bit of responsibility for it getting this far. You have that gavvel. That gavl is not just to open a meeting. You've heard me say that probably or can finish my sentence. It is not to open and close a meeting. It is to call a meeting to order. It is to keep the meeting in order. Um I think we

[4:56:45]

can all do better. And like Commissioner Foley said, we can support ourselves and say, "Hey, do we need to take a break? Do we need to uh you know, take a minute to you know, cool the temperature down?" Um, we all bear some responsibility for it getting this far, but I do not believe that any of the allegations reach the level to this public humiliation and this uh just this level. So, um, with that being said, I I don't believe that these should be considered epic violations.

I don't thousand% agree with everything we just said. I'll just make a little short comment. U Commissioner Bonnets, thank you for the last two meetings for your verbal apology. That was very humbling and uh I thank you again. My uh my concern is staff. um staff that's not with us anymore and staff that has not been here to receive the verbal apology. I'll leave it at that. I want [clears throat] this I want this to finish tonight, be done with and move forward. I'm going to take I'm going to present my recommendation and we can go from there. I'm not going to make a motion unless it's necessary, but I would like a written apology to the staff and then I would like our complete board here to have ethics training in January during our retreat. That includes all our board members and mayor. Okay. H

[4:58:52]

we can continue this conversation. Uh but I I do have a motion and uh we can incorporate what you you've asked for a written apology. Mayor uh Commissioner Frell mayor prom written apology and what was the second thing? the uh ethics training during our January retreat for all board members and mayor.

Before you make that motion, um earlier you said that uh you did were not interested in hearing Commissioner Bonnets make any more apologies. I think he has made enough apologies also and and I'm please do not take this as a criticism, but the words that you just read were the same words that I received as a motion. basically earlier today. Um so with the um us taking the ethics training which I think we all should take

I have no problem with that but

h

it's a great place.

I think we should um but you did say that you were not interested. I I don't know if a written apology is is necessary. He's made two public apologies already. And you you said you were not

any other discussions before be

before before we get to a motion a procedural item is we need to excuse Commissioner Bonds from voting on matters concerning his official conduct.

Okay.

That's a state law. That's just

I'm happy to make that motion. Um, I move that Commissioner Bonnets be excused from voting on matters concerning the allegations involving his official conduct pursuant to NCGS uh 16A-75A.

Thank you. Is there a second?

A second.

Thank you, Commissioner Thurber. And just for information, that does not stop discussion by Commissioner Bonnets. Um,

[5:00:53]

and that is just related to our duty to vote that we have to be formally excused by the board to not vote.

So, I do have some questions about the process. Nobody asked me how I felt. Like I don't feel like anyone anyone was asked if this could happen if we could move forward with this. And I'm not sure how the board got bypassed with that decision. Maybe you could explain that to me.

Placing it on the agenda.

Yeah.

Okay. Yeah, I'd love to know that also. You said it was required.

Yes. by the by the code of ethics um that we that we have as a board when complaints are brought forward then they need to be addressed by the town attorney and the mayor or if it's about me then then it would be the mayor pro tip. So that's the process that we we've obviously had other uh conflicts that we've resolved in other ways, but in this case it was the totality of the complaints from um public board members and staff primarily um that that drove this process. And we can't talk about commissioner performance in a close session because we're elected officials and so there's no opportunity to do that by state law.

So did the five emails come at the exact same time or were they overtime?

Uh they did not. No.

Okay. So maybe we could have talked about it like during the first email or something or we could have gotten a phone call from Jonathan that there was an email and five accumulate and it and it ends like this.

Why do we wait till now?

Let me thber is correct.

I'm upset.

I'm upset too.

So

this could be any one of us.

Yeah. And it will be

and that's not fair. Mhm.

[5:02:54]

You know, I would also say that um when speaking with Commissioner Bonnets, again, it came from passion and it came from frustration. And one of the issues that he was frustrated about were that his concerns, his opinion, and and he's still out of speak, so he can correct me if I'm putting words in his mouth, were that um he still does not have answers to some of the questions that he asked for and raised. And I think that is just as serious a a charge, if you will, as uh speaking uh to somebody in a way that could be interpreted as disrespectful. Um as of yet, Commissioner Bonnets, have you received the closure on the things that have caused you the frustration that has led us to this? Thank you very much for asking it and I will assert no I have not received closure.

Mr. Messi, can you speak on this?

The notice that was served upon Commissioner Bonnets lists four separate incidents where there are alleged violations of the ethics code and there are references to the public meetings, five different ones that are in the notice. That's the specificity I think he's asking for.

No, I'm talking about what what Oh, I'm sorry. I didn't mean to cut you off. I'm so sorry. I meant the things that frustrated him in session that caused him to verbalize his frustration in such a manner. And I think some of those things were uh asking for uh what staff responsibility was to um two advisory boards which has now been turned into a violation.

I don't want to put words in your mouth and I apologize. So please

[5:04:57]

that's that's that's a response from Commissioner Bonnets and we I have no idea what his motivation or what it you know what the cause of of the interactions were asked for the same kind of policy that the county board of commissioners put into place for advisory board policies visa be the responsibilities of staff two advisory boards and my request has been rebuffed repeatedly uh by the mayor and the town manager and it does not seem reasonable to me and the reasons uh opposing it do not seem reasonable. Can we talk about the emails that you received as as evidence?

Yes.

Those are public, are they not?

I'll let you answer that.

I don't know what you mean by evidence. The evidence is in the notice that was served upon Commissioner Bonds. There are four incidents. They refer to staff members in the first two. The third uh item refers to treatment of the other board members. And the fourth is uh uh discussion of the duties and responsibilities of the board with respect to the town manager. That's the allegations.

Okay. So no emails were were discussed. Is that correct?

Offered as evidence.

This is not a question of evidence. is our own policy requires evidence. Providing citations uh to meetings and time marks not timestamps in those meetings is not evidence.

How about exit interviews? Are they private?

Yes, sir.

Letters submitted as complaints could be

[5:06:59]

redacted and could have been delivered to me as evidence.

Yeah. I mean, this is the first time we've had this. There's a learning process here. I understand that. But honestly, uh, you have five board members here that really want this this matter to be addressed way before it comes out on an agenda. And I don't think that happened. So, I I point to the town manager. He should be protecting his staff. If there is a a point where the staff says to him, "Hey, I'm getting a I'm getting uncomfortable with the commissioner," then it's up to the town manager to protect his staff. It's also up to the commissioner to calm down and make sure that his his uh arguments are persuasive but not offensive. there's there's always a two-way street there. So, uh to have it lay on our laps before, uh [clears throat] we haven't just just covered all the bases. Where was the town manager? Where uh why did he intercede? Has Mr. Bonnets, Commissioner Bonnets, were you did the town manager talk to you about these issues? Okay, this is a staff issue.

The last instance that's mentioned in the notice is what happened at your September meeting. This notice dated October 9th. You only meet once a month in order to afford Mr. Bonnets an ample opportunity to respond to the notice. That's why it's here in November. There was not time for him to respond in for your October meeting. That's why it's taken so long.

Yeah, I I I understand where you're

[5:08:59]

coming from. I'm I am also addressing a little bit of common sense and common courtesy and I as a I as a commissioner refute when I saw this on the agenda. I just went, "What the heck is this?" And I know you have responsibility. He said that uh you know stat should say any ethics complaints but this is like way it's like jumping way ahead. We should slow down and and be civil and we should be able to to communicate as the mayor. You should be able to communicate with m commissioner bonnets and say we have a problem. Was that done Mr. Bonnets? Not until your conversation with me in which you told me that this was forthcoming.

We can cite uh these instances. But I I guess my objection is more common sense. It's more country. It's more home value based. And that is why aren't we speaking to to each other with civility first? And that's us to our to our our staff, us to our the town manager, and us to the mayor. But I really feel that we had some compelling arguments brought forward to us by citizens tonight. And I felt like, yeah, this should never have gotten this far.

I agree with you. It never should have gotten this far. could have been prevented very easily. Um, and I I just want to just kind of draw a correlation. Um, I had a meeting with staff that was extremely spirited. [clears throat] It was very passionate. Um, and by the time I got home, I got an apology from the

[5:10:59]

town manager for staff's p disrespect towards me. I had absolutely no idea what was what he was talking about. And I I called and I said, I I don't what are you talking about disrespect? I wasn't disrespected. This was a great exchange. I then further got an apology from staff members and again which I said there this was one of the best meetings I've ever had. This was it was spirited. It was great. It was wonderful. There was no disrespect. But staff was given an opportunity when it was perceived that disrespect was presented to a commissioner to apologize. There was none. But why would a commissioner not be afforded the same opportunity? And at at this point, I know we don't have an actual motion on the floor, do we?

We do not have nothing was do we?

We have the motion on the floor to um excuse Commissioner Bonds from

Oh, that's the only one.

Excuse recuse. Which one is it? It's recused, right?

It was excuse.

It's excuse.

It should be recess.

Right. I didn't hear the question. Um, well, I don't know what the motion was, but he was wondering if it was recuse him from voting or excuse him from voting.

Excuse him.

Yeah. I I move that Commissioner Bonnets be excused from voting on matters concerning the allegations involving his official conduct pursuant to NCGs 168-75A.

And we have a second me.

Okay. Any other discussion on that?

I would like to know what we're going to do differently next time. Yeah,

because that just wasn't fair. It didn't feel fair, John. Or

I'm happy to talk. Can we vote on the motion?

It just excuses.

Excuse.

Yeah.

And then Okay. Any other discussion on that motion?

Okay. All those in favor say I.

I.

Opposed. Okay. Thank you.

In that case, I'd like to make a motion. Having reviewed the record and the

[5:13:00]

materials presented, I move that pursuant to section 15.5.1 of the Town of Pittsburgh Code of Ethics and Conduct that the board accept Commissioner Bonnets's sincere apology regarding the concerns raised about civility and decorum in the second violation and find that no further action is warranted. Dismiss all remaining allegations without findings of violation and consider this matter regarding allegations Lebanon Commissioner Bonnets closed. I further commit the entire board to training on ethics, governance, and board staff relationships during our upcoming board retreat and reaffirm the board's collective commitment to professional conduct, mutual respect, and adherence to the code of ethics.

Second. [laughter]

Thank you, Commissioner Hicker. Second, Commissioner Foley. Discussion on that motion.

I'll just mention that um I want this to finish. Uh, Commissioner Bonnets, like I said, I appreciate your verbal apology. I really think that the apology the folks that are not here and the staff that's left before us, I I think they deserve a written apology and that's a a very simple request and move forward. That's Any other discussion? [clears throat]

No question.

Any other discussion?

Okay. All those in favor say I.

I.

Any [clears throat] opposed?

Motion passes. Um, thank you and thank you for I think this is a place that we don't we all agree we don't want to get to again. Um I'm looking forward

process

forward to the retreat and I've appreciate your grace that you gave me in in this process in my prescribed role in it. U so

[5:15:03]

thank you.

Thank you Mr. Mayor.

All right. Up next is Chattam Park South Village [clears throat] section design plans 212224 and D2 Dean. Uh once again, thank you. Um so I'm going to provide a quick update from our last meeting uh and then we'll talk about the proposal in a little bit of detail. So going back to last month, we presented the section design plan for sections 2.1, 2.2, 2.4, and D2. Um, at that meeting, uh, it was, uh, it's required through the small area plan that a twoe public comment period be open to allow residents the opportunity to review the plans and provide their comments. That public comment period ended on December or, excuse me, October 27th. We received 20 responses in total. A majority of those comments expressed concern over the proposed design, the proposed development overall and environmental [clears throat] and uh tra transportation impacts. The full comments are listed in the staff report as well. Um returning to the proposal itself, uh nothing has changed since it was presented to y'all last month. The planning board at their September 21st meeting recommended approval by 4 to2 vote. As a reminder, the section design plan is uh 1300 acres in size. It proposes about 1,700 residential units and a private golf course. Um and there are a few conditions that staff and applicant have agreed to for uh mainly surrounding transportation issues. Those being the trans

[5:17:04]

transportation impact analysis, the timing of that, um the update to the tra travel demand model, um and the delivery of a cost share agreement for off-site trans transportation improvements. Again, none of that has changed since the previous pro uh presentation. I'm happy to answer any questions about those items or the proposal itself. Uh but tonight you have the option you may uh choose to approve the section design plan uh deny the section design plan or uh request additional information and modifications.

Can you reate what you said about the TIA and the proportionality agreement and the updated traffic demand? Did you say that was they were I'm sorry I didn't understand what you said.

Yes. So the uh staff recommended conditions um are aimed to address those those conditions are an agreement between town staff and the applicant the developer um to address some of those big picture items that we haven't gotten clarity on yet but we're continuing to work through uh with those.

Okay. And when will those be finished? So the transportation impact analysis we had held a kickoff meeting uh last week with the developer. So that process has already started. They're working on developing the transportation impact analysis for the entire 1300 acre 1700 unit development. That would be u the staff recommended condition stay that would be delivered before the first preliminary plat for the entire development. So even if that preliminary plat is 10 lots, the TIA submitted before that would be for the entire 1,700 lot proposal. U the travel demand model also is being updated. Um we are getting a 2025 base no bill travel

[5:19:08]

demand model to show what the current conditions are. We have a future no build transportation demand model and uh a future build transportation demand model as well. So we'll be able to compare the current conditions are what the future conditions are if if the development is not built and the future conditions with the development and all of the traffic impacts. So they're working on that currently as well.

Okay. And is it possible to have that before we um have to vote on it be approved?

Yes. I believe the 2025 no build model should be ready in a couple of weeks before the next uh commissioner's meeting. Um and we'll need to check with the um engineering firm working on overall uh the TDMs to to figure out the exact timing on delivery of everything

and can the proportionality agreement be finished?

Uh, so our engineering firm or our consulting firm RK is currently working on that as well. Um, so again I don't have a timeline for you right now. The recommended conditions say that that would be delivered with again prior to the preliminary plat. But we can um try to find out more on where they are with that.

For me, um first I I want to say thank you to you and uh Ben and the staff and uh for Chattam Park for meeting with me last Monday. uh it was very informative especially with the roads and um what those triggers are going to be and so on and uh addressing a lot of the environmental concerns that I have uh with the golf course. Um

[5:21:08]

also um I know we had 19 responses. Um, and as you know from that meeting, I also went through and scrubbed social media and the chat list and everywhere I could to find out what additional genuine concerns were. And I apologize for not getting that list back to Chattam Park to be able to answer some of those further questions. I I did have a surgery on the eye and I'm sorry I've not been able to do that. I will do it as soon as I can look at a screen for more than five minutes. And when I have those, I I think I can have more information to go forward. But that was an incredibly informative um meeting, especially getting to see that the map with [clears throat] the uh the unfunded roads removed and so on. Um but I really do look forward to seeing the proportionality agreement and then the additional questions. Um just one thing on the recommendation recommended conditions right here A through E they are the uh contract I mean the developer has agreed to these

correct.

Okay. Okay. And um has all of our requirements been met regarding this and all our standards?

Yes. So um when you read through the staff report, we have the required elements listed out. What's required with the section design plan? I would say for the most part um a lot of the requirements have been met. There are some details that still need a little bit more information and fine-tuning. Uh but we feel as staff that uh the place that the section design plan is in is consistent with the small area plan recommendations. Um and any outstanding information um can be addressed on the final plat um when or preliminary plat

[5:23:09]

um which is not a unreasonable u ask.

Thank you for uh filling in for me. I do appreciate that. Can you give me an example or can you give the board an example just about a hurdle we haven't addressed yet? The reason I want to know that is I'd like to know the significance of it, the level of significance. So perhaps you can give us Yeah. So that you can uh help us make our decision tonight. Well, so um is there a specific item?

Well, you said you you there are some items that haven't been agreed upon. Can you give us a flavor of those?

Yes. So I there was some background there, so I just want to make sure I heard you correctly. Um so for instance, uh transit accommodations. Um the small area plan identifies um the intersection of Chattam Parkway and South Village Way as uh having future transit accommodations. Um the section design plan does not uh show or provide any additional information on that. Um but as we work with um Chad and Transit and the developer on refining you know what the plan looks like and

I understand. Okay.

I'll just say I appreciate the thoroughess of the of the staff report and the the remaining items and and suggested conditions and things like that. It's it's very thorough and and easy to understand for for what it is. So, [clears throat]

[5:25:13]

any other discussion?

I'd like to make a motion recommend adoption to resolution approval of the section design plan with the staff and planning board's recommended conditions. I second.

Motion by Commissioner Frell, second by Commissioner Foley. discussion. I can't unfortunately support it. I think that we need to uh have clarity on the proportionality agreement and have the TDM completed and understood um before before we can uh reasonably approve this section design plan. I agree.

More specific.

Yes. The questions of of triggers for infrastructure expenditures. How are we going to mitigate those costs? Um that's that's what the proportion proportionality agreement will about be about, I hope. Um, what happens if DOT has a funding shortfall and doesn't fix them? How are we going to get East Street fixed? You know, the failing levels of service is for instance, Grant Grant, there's a bridge that's cracking. Uh, [clears throat] does the staff have any comments regarding those issues? Um, sure. I will say that the staff recommended conditions um were aimed at

[5:27:16]

trying to come to an agreement with the developer on these items. So, proportionality agreement isn't necessarily required in the small area plan or the UDO. um having them agree to work with us on figuring out what that looks like down the road and within you know before the first preliminary plat um I think was viewed from a staff perspective as a step in the right direction working with the developer. Um again the TIA having that for the entire section design plan or the small area plan itself says it may be submitted at SDP or preliminary plat. um that may um leaves the door wide open and um having them agree that the entire TIA for the entire section design plan comes with the first preliminary plat gives us a lot more certainty on when we're going to see that because it could be argued that the preliminary plat you know that if it's 20 lots the TIA would only look at that 20 lot preliminary plat right?

Then we're, you know, doing a peace meal and not having a really clear picture. So that's kind of the thought behind what those conditions are.

And one at preliminary plat, we can turn anything down at that time too also. Right.

It doesn't meet UDO requirements.

Right. So by delaying this vote tonight, what are the costs involved in that if if if we push this down a month and we wait for all of the answers? What is it that uh what are the repercussions of that pro and con?

[5:29:18]

Um, so by waiting and uh waiting for the TIA and the agreement and everything else, you would have more of that information before making a final decision on the preliminary plat. Um, a con would be that it would delay the development of the preliminary plat potentially um because they wouldn't have approval to move from section design plan to preliminary plat and start moving down that process with CDs and starting construction.

Okay, I get it. For me, I think it's just really unfortunate that we did not have a proportionality agreement in place when we originally got this and we didn't have that the updated maps and so on and so forth because at the at the end of the day, I have to answer to people of Pittsboro and they're going to want the answers to these questions and want to know why did we vote on this before we had the answers. I I can't say that the answers would change the vote in any way, but I think we need to have the answers. Um, and I think that the people of Pittsburgh deserve us to have all the information in place before we make a vote. So, I can't can't support it at this time.

Any other discussion? This is a big and complex project and we're learning a lot of lessons along the way and um I really appreciate staff's diligence and determination in trying to get uh the answers. Um and uh at this point it's just it's um year ago we didn't even know that we needed a proportionality agreement, right? So we have to give ourselves some grace. Um

[5:31:18]

but uh the fiscal impacts of these questions are profound and um they need to be addressed and we need to pause to get them addressed.

I would like to make a motion.

We have a any other discussion on that motion.

[clears throat]

All right. All those in favor say I.

I. I.

Any opposed?

Nay.

Okay. Motion fails.

Okay. I would like to make a motion. First, I want to say I understand that the staff is working on this. Um, and I appreciate all of your efforts. Um, I would like to formally reiterate my request through a motion that these items be completed prior to SDP approval. I would like a comprehensive TIA covering the entire SDP, a proportionality agreement addressing the development's fair share of off-site transportation improvements, and an updated traffic demand model reflecting current projections and uh, impacts. Okay.

I think we need all of these three things um before I can make a decision of this magnitude.

You need to find updated.

Just a second. Just a second. There's a motion. Is there a second?

Second.

Thank you, Commissioner Huner. Uh discussion.

You need to find that updated transportation plan.

We were just talking about all of that.

So, uh she need more specific for me. It's the TDM that

is being worked on right now. Other discussion?

Okay. All those in favor say I.

[5:33:19]

I.

Any opposed?

Say n passes. Any other action on this item? Up next, Chattam Park PDD amended and restated master storm water agreement. Mayor and members of the board, um in your agenda packet, you have a copy of the master stormwater agreement that was adopted by the town um seven years ago and a proposed first amendment to that stormwater agreement u and as well as a restated master agreement. Uh the purpose of the um first amendment to the stormwater agreement is to reconcile a difference between the element of Chadam Park and the original master stormwater agreement with respect to when a contribution uh for the maintenance of the u stormwater devices after they've been certified uh as permanent storm water devices as opposed to erosion control devices occurs. And the amendment is an attempt to make it the same and to make it uh consistent and to allow the contribution to be made at the time that the the units are converted into the permanent structure. Have any questions? Hunter Freeman who is the guru of storm water for Chattam Park and is here to explain if you have any specific questions about it. As stated, I'm Hunter Freeman. I'm the small administrator for Chatt

Guru, too.

I'm a guru. He he did say that made it official. It's in it's in the record.

Yes. So, happy to discuss this or answer any questions or

[5:35:19]

major changes. Can you talk about why why we're here? Why are [clears throat] we addressing this?

Uh so, as as stated by Mr. Mexicates to to clarify and just clear up confusion about when the uh supplemental agreement would need to be filed. The supplemental agreement is well the master agreement is the agreement between the town and the residential association. The residential association is the responsible party for long-term maintenance of all permanent storm water control structures in Jaden Park. The supplemental agreement is the individual details for each storm water control measure as they are designed and approved and then built. We provide additional detail at that point that uh we have about the the size and type and drainage area and costs of construction and and maintenance and that plays into the cost of the escro contribution. So those five items are part of the supplemental agreement and what we're uh amending in this text change is to require those five items to be finalized at the time of certification of the SCM. So when it is converted or constructed to be a permanent structure in contrast to an erosion control structure which would be used during construction. So original control structures are generally well they're maintained by the applicant or the developer or property owner site not the residential association but when it switches over to become residential association that's when the supplemental agreement is finalized. So we're writing into the master agreement that the those five elements including that escrow contribution would happen prior to or at the same time as certification of the device.

Okay. rather than anytime earlier in the in the process.

Do we have staff input?

[5:37:20]

Yeah, we reviewed it. Um the town acts as the storm water administrator in the agreement and none of the authority of that role has been taken out with this. Uh it is to me it's more of Chattam Parks dealings with the the HOAs Paul described.

Okay.

Right. all all compliant with general statutes when it comes to storm water. Right. Right. [clears throat] they again they have uh their processes in place and so they use some of their own definitions but it's uh in general yes um consistent with the state

agree that they use state's definition for what is a storm water control measure

any other questions or discussion All right. Uh, I'll take a motion to approve the first amendment and the revised master agreement.

Moved.

Thank you, Commissioner Huner.

Second.

Commissioner Frell. All those in favor say I.

I.

Any opposed? Thank you. All right. Four more from the consent. Up next, we have the minutes. Uh, Commissioner Foley,

just real quick, uh, this is this is a quick one. Uh, the minutes, uh, I thought this was the best place to bring this up, but we do have some close session minutes that we've received. Do we have a process to release close session minutes as they become uh, not needed to be uh, close session qualified?

Yes, sir. We do.

[5:39:20]

We do. That's it. There is a process for that.

There is a process and it's done. Uh how is it reviewed then? Help me with the process.

The board [clears throat] board would have to determine that the closed minute uh closed meeting minutes are no longer necessary to be closed.

Okay. That's my question. Thank you.

In closed session, correct?

Yes.

Okay. Um anything else about the minutes?

That's it. I don't feel comfortable voting on minutes that I wasn't there.

Let's do that in close session. Okay.

Okay. Um the sorry the minutes that were on the agenda to approve.

Any other questions on those?

I make a motion to approve minutes.

Thank you. Uh is there a second?

Commissioner Huner. All those in favor say I.

I. I.

I.

Any opposed? All right. Up next is the board of commissioners meeting scheduled. Uh I will a couple of y'all wanted to pull this. I'll comment briefly that there has been some discussion about going to a meeting and a work session. Um been working with staff on that. The in December we have the budget scoping session as a second meeting already and January we're planning the um retreat on the 21st and 22nd. That correct? Okay. And then the plan is so that would be January. The plan is for February to be a workshop updating the strategic plan continuation from the retreat. Um, and then start other workshops after that. And we could include presentations and things in in February. Um, the reason it's not here is because we're still working out what that is, what day that might be. Um, and we potentially need to shift other advisory board meetings as well. Um, the reason that we have these on the November meeting is I think I don't know how many years ago it was, but we had them on the December meeting previously and then there's a snowstorm and we canceled the meeting. We didn't have a a

[5:41:20]

schedule to start the new year. Um, so my recommendation we approve this with the understanding that it'll probably be back in December. Um, potentially multiple revisions. So, any other questions on that? All right. Uh, can we get a motion to approve the current meeting?

Thank you. Second.

Second.

Commissioner Foley. All those in favor say I.

I. I.

Any opposed? All right. Up next is WCK specialist. Mr. Foley.

Rec specialist. Um, can can you describe [clears throat] the addition of this? Um, Mr. Franklin, can you describe the uh the position how it's going to be paid for or it's not going to be paid for?

Yeah, we um

it will [clears throat] be paid for.

No, it's not an internship coordinator.

What is her?

Yeah, our recreation [clears throat] coordinator um resigned. Had to move to New York uh for other work opportunities. And so we are kind of repurposing that salary that's left over uh for an engagement specialist. Um obviously we've been hearing the feedback about engaging the public more. So we wanted to kind of tweak that position a bit um to focus more on those aspects and then hopefully one day when we have the the salary budget we can bring back that um other position at a later date.

Thank you. So I move uh that position recreation and engagement specialist be approved.

Thank you. Is there a second?

Second.

Thank you, Commissioner Thurber. All those in favor say I.

I.

Any opposed? All right. And last but not quite last is the volunteer program and that was both. So whichever one

um uh some of the think comments that I

[5:43:22]

have on this is um it references the um volunteer program manual and um I understand that that is um administratively approved by or changed by the town manager and I just would like that if there are any major changes that um those go through the board. And then um also um uh I wanted to understand um the uh the background checks or whatever if it is a same day cleanup type of thing. Is that still something that we are that we are having them do or uh how how would that work exactly? And I I kind of want a little clarification on the background checks. I I I know we've discussed it that it is not feasible to do a criminal background check on on every single person. Um uh but we will do it on the ones that are working with minors. Um but what type of screening can we do and can it be put on the uh applications? I would I I'm sure there's got to be a volunteer application where they disclose anything that we might need to know. There is a volunteer application that they do have to fill out. Um that comes directly to me through the online portal. Um the background checks and anybody the state has passed a law that anybody working with children now has to have fingerprinting done.

So background checks and fingerprinting will be for anybody that works specifically with children like in recreation programs like you know wreck soccer, wreck baseball, anything like that. Currently, we do not have any programs like that. Um, we were doing background checks for all the volunteers, but we have so many. It's so cumbersome and it's such a cost to the town. Um, since, you know, most of them are volunteering in downtown or anything like that, then we kind of reserved it

[5:45:24]

to just do background checks as we people would come working with children. Do we um do we have a d like a a volunteer database of any sort?

I have a spreadsheet database. [laughter]

Yeah.

Do we ask the question um when somebody does want to volunteer? Have you let's just say I want to volunteer um and help Heather with finances but um I have a felony embezzlement. Do we ask people to disclose any uh felonies or something or anything like that or any pending uh

No, we ask that on job applications, but

if they've been convicted of a felony, but we do not ask that of volunteers.

We ask that of volunteers.

Why not? It's not I'm sorry, but they

I'm asking the manager actually.

Why why why don't we do that? Why don't we ask uh any any board advisory board if they're convicted of a felony?

Great question. I don't know.

Jennifer as our HR expert. So, it's not typically something that you do to ask the volunteers that just volunteer like in advisory capacity or anything like that. It's not usually the case.

That's not an answer. I'm I'm curious because of my respectfully I'm I apologize. I said something out loud I shouldn't. But, uh, I'm I'm concerned about Pittsburgh and whether or not, uh, somebody that is convicted of a felony is an advisory board member and something happens. So, uh, it's a matter of just asking. So, I'm wondering if we could add that. I'll give you an

[5:47:24]

example. Have you ever been convicted of a felony, had a professional or occupational license revoked, or suspended for misconduct, fraud, ethical violations, or been formally removed from a public board or professional organization or other position of trust with misconduct or violation of ethical standards. I think uh that's our theme tonight. But I I I really think that we should be adding that to a the town board advisory boards.

Uh we put information out on the listerve a lot of times from HR listerve through the school of government and I don't know anybody that deals with volunteers in a general capacity that does that

advisory board volunteers you're talking about?

Yes. I would just say I would hate for a situation to arise that there was somebody that is volunteering on an advisory board who may have a a former felony for assault who gets angry and harm somebody where a simple question could I I don't think I unless there's a legal reason for us not asking background checks then how would we know that whether they're telling the truth or not? That was my one. If we're if it's a question and we're not backing up with a background check, then it's

um

But just also clarify this volunteer policy does not apply to the advisory boards. It is for volunteers that are not on our advisory boards that are volunteering for the most part for the downtown.

Yeah. Downtown.

Oh, it's a separate. I'm talking about downtown who's interacting with the public as a Pittsburgh volunteer who might have a violent history or something like that. It's not necessarily that a a a felony conviction would disqualify you, but I would like to know. And that also if we do find out

[5:49:25]

for some reason because somebody goes, I can't believe you have so and so working here. Did you not know what he did in the last town? that lie on that by saying no, there isn't one would be a rem a reason to prohibit them from coming in. Um, I'm not saying that it it's enforceable. I'm not saying that everybody's going to be honest, but it is a kind of a cover back kind of thing. It's something I would think. I would love to see it on the advisory boards also because uh [clears throat] I'm thinking about Pittsburgh. I'm not thinking about anything but Pittsburgh, protecting the town of Pittsburgh. Love to hear any other opinions or comments.

Yeah, this is mainly for volunteers. They usually sign up to do oneoff event like the Christmas tree lighting or something like that. Um, we don't have any volunteer positions within town departments as far as like human resources or finance or anything like that. So, they're not, you know, working directly in the departments themselves, but a lot of times they're doing just one else. We just have that record of them that they volunteer. So if they try to, you know, throw a claim against the town or something like that, then we've got that advisory pol or not advisory, I'm sorry, volunteer policy and um, you know, that spells out all of the things that they have to follow. So it absolves of any um liability Okay.

I think I'm okay with it's the state law covers children and that's what we're

Yes.

complying with

and that that's the main reason that this policy was changed is because the

[5:51:26]

doing a background check on every volunteer was very cumbersome and c cost the town a lot of money. But anybody that if we had any um youth programs, anything like that, all those people would have to be background checked and fingerprinted. So they wouldn't even be able to volunteer for like 6 weeks or more because that's how long it takes to get fingerprinting.

With the background checks we did previously outside of children, was there any offenses that we did or did not exclude people from volunteering for or did

Yeah, there was no issues with anybody that we did background checks for already. Ziggs, did you make note of the other requests from Commissioner Huner

about adding that to the application?

Sorry,

what were those other details in in the policy that you were

asking if they had been convicted of a felony or

Yeah, it's just part of their application. And the other one that I asked for, gosh, I don't even remember now. You're talking about advisory board members applications or just volunteer applica applicants.

I think it should be on I I don't I think it's a fine question to ask, but I do I don't want to disqualify anybody who may have made a mistake in their life at at some point. I I want that to be very clear. In no way do I want to discourage somebody who is who served their time and whatever. But I think we should be aware of it on any type of policy, any type of volunteer of any sort. I mean, we can ask it, but whether they the truth or not, we we can't we won't know.

So,

is is there any reason why could this be paused while we do some research and check the legality of asking those questions or is there a batch of volunteers coming through that we're trying to

Not that I'm aware of. I mean, I've gotten two in the past month. So, no.

[5:53:27]

Can we approve these modifications and come back?

Yes.

Say, let's go do some research. Okay,

great. Make sure that we're not asking a question that we can't ask per general statute.

I move to table this discussion.

I think it was

Is there a move?

Approve it as is.

Approve it as is. Right.

We'll come back um if we want to change it to add that.

You want to make a motion then?

Sure. I make a move a motion to approve the revisions to the volunteer policy.

Thank you. Is there a second?

Second, Mr.

Foley. All those in favor say I.

I. I.

Any opposed? And for clarity, we're looking at volunteers and advisory boards or

Yes, please. Is that Can I get a nod from everybody?

Yes.

Thank you. I hear you.

Early night.

All right.

Really?

Can I get a motion to enter into close session pursuant to NCGs 143318? A one to prevent the disclosure of information that is privileged or confidential pursuant to the law. A3 to consider and give instructions concerning a judicial action titled Goodwin Land Holdings LLC LLC versus town of Pittsburgh A6 to investigate agreements and to discuss personnel.

So moved.

You can Mr. Thurber second.

Second Mr. Foley. All those in favor I medical pilot and there Um getting stats.

[7:29:42]

All right, we're back in open session. I'll take a motion to adjurnn.

Thank you, Commissioner Bonnets. Second, Commissioner Huner. All those in favor say I. What about

Speaking at this meeting

Town of Pittsboro's own rules for public comment — check them before you rely on anything here.

3 items were added after the agenda first went up

A late addition is how the public gets surprised: somebody reads the agenda, decides nothing on it concerns them, and the thing that does is added afterwards. They are marked in the list below.

The day counts are an upper bound. Governments publish what is on an agenda, not when each item was put there, so these are measured from when this site first saw the item — which can be later than when the clerk added it, never earlier.

Jump to an item (30 on this agenda)
  1. 2.IRequest: Town of Pittsboro 2027 Holiday Schedule
  2. 2.IIRequest: Pittsboro Downtown Advisory Board (PDAB) 2027 Meeting Schedu…
  3. 2.IIIRequest: Parks and Recreation Advisory Board (PARAB) 2027 Meeting Sch…
  4. 2.IVRequest: Planning Board 2027 Meeting Schedule
  5. 2.VRequest: Christmas Parade Road Closure 2026
  6. 2.VIRequest: 205 JA Farrell Street-Budget Amendment, Project Design Servi…
  7. 2.VIIBudget Amendment: Water and Sewer Grant Funds
  8. 2.VIIIAnnexation Petition: Pittsboro Baptist Church, Inc. A-2026-02, PB-26-…
  9. 2.IXPosition Request: Transportation Engineer (Added 11.9.2026)
  10. 3.IReport: Pittsboro Downtown Advisory Board - 1st Quarter FY 2026-2027
  11. 3.IIReport: Boys & Girls Club Quarterly Report Fall 2026
  12. 3.IIIReport: Town of Pittsboro Financials as of September 30, 2026
  13. 4.IResolution: Recognizing The Graduates of the Fall 2026 PBO-101 Citize…
  14. 4.IIResolution: Veterans Day 2026
  15. 5.IManager Updates
  16. 5.IIMayor & Commissioner Committee Liaison Reports
  17. 5.IIIPublic Comment
  18. 6.IPresentation: Transportation On Demand (TOD)
  19. 6.IIUpdate: Response to Unified Development Ordinance (UDO) Policy & Regu…
  20. 6.IIIUpdate: Stormwater Fee Study
  21. 8.IPresentation: New Town Hall Project Update 3 (Revised 11.9.2026)
  22. 8.IIRequest: Downtown Pittsboro Logo
  23. 8.IIIDiscussion: Review of Alleged Code of Ethics and Conduct Violations
  24. 8.IVPB-26-243 Chatham Park South Village Section Design Plans (SDP) - 2.1…
  25. 8.VRequest: Chatham Park PDD-Amended and Restated Master Stormwater Agre…
  26. 8.VIMinutes: October 12, 2026 Regular Meeting of The Board of Commissione…
  27. 8.VIIRequest: Town of Pittsboro Board of Commissioners 2027 Regular Meetin…
  28. 8.VIIIPosition Request: Recreation and Engagement Specialist
  29. 8.IXRequest: Volunteer Program Policy Revisions
  30. 9CLOSED SESSION (Revised 11.9.2026)

Agenda items (30)

Consent agenda · 5Staff or committee report · 5Presentation · 3Other · 3Budget action · 2Resolution · 2Personnel · 2Proclamation or recognition · 2Discussion item · 2Procedural · 1Contract or award · 1Minutes approval · 1Closed session · 1
  1. 2.VI Request: 205 JA Farrell Street-Budget Amendment, Project Design Services, Asbestos Abatement, and Demolition
    A $128,300 budget amendment from fund balance would pay EMR Services, Inc. to design the work, remove about 5,800 square feet of asbestos-containing popcorn ceiling and demolish the building at 205 JA Farrell St., clearing the site for the new Town Hall. EMR's turnkey bid of $128,299.45 was the lowest of three; DARI and DH Griffin bid $147,429 and Abatemasters with Kingdom Demolition bid $163,050 before a survey.
    Approved on the consent agenda
    • 205 Ja Farrell St · no matching parcel on file
  2. 2.VII Budget Amendment: Water and Sewer Grant Funds
    Passes $188,437.65 through to the City of Sanford. The money is the fifth NCDEQ reimbursement for the Find-It Fix-It water and sewer project, which moved to Sanford with the utility merger.
    Approved on the consent agenda
  3. 2.VIII Annexation Petition: Pittsboro Baptist Church, Inc. A-2026-02, PB-26-400
    Pittsboro Baptist Church, Inc. petitions for voluntary noncontiguous annexation of 41.613 acres on the south side of Highway 902, west of Highway 87/902, now in residential and agricultural use. The resolution directs the clerk and planning staff to check whether the petition is sufficient.
    Approved on the consent agenda
    • NC Hwy 902 · Pittsboro Baptist Church, · 28 acres · assessed $280,098
    • NC Hwy 902 · Pittsboro Baptist Church, · 13 acres · assessed $176,823
  4. 2.IX Position Request: Transportation Engineer (Added 11.9.2026)
    Personnel Added the day of the meeting Appointments and personnelRoads and transportation
    Creates a Transportation Engineer position at pay grade 35 in Development Services, paid for by reallocating money from the vacant GIS Project Manager and Connectivity Project Manager posts. It was added to the agenda on November 9.
    Approved on the consent agenda
  5. 3.I Report: Pittsboro Downtown Advisory Board - 1st Quarter FY 2026-2027
    Staff or committee report
    The Pittsboro Downtown Advisory Board's report for the first quarter of FY 2026-27.
  6. 3.II Report: Boys & Girls Club Quarterly Report Fall 2026
    Staff or committee report
    The Boys & Girls Club's fall 2026 quarterly report.
  7. 3.III Report: Town of Pittsboro Financials as of September 30, 2026
    Staff or committee report Budget and appropriations
    The town's financial statements as of September 30, 2026.
  8. 4.I Resolution: Recognizing The Graduates of the Fall 2026 PBO-101 Citizen's Academy
    Proclamation or recognition
    Suggested Motion: "a motion to adopt the resolution recognizing the graduates of the Fall 2026 PBO-101 Citizen's Academy"
    Adopted
  9. 4.II Resolution: Veterans Day 2026
    Proclamation or recognition
    Suggested Motion: "a motion to adopt the resolution recognizing Veteran's Day 2026"
    Adopted
  10. 5.I Manager Updates
    Staff or committee report
  11. 5.II Mayor & Commissioner Committee Liaison Reports
    Mayor Shipp -Central Pines Rural Planning Organization (CPRPO) and EPA's Small Communities Advisory Subcommittee (SCAS) of the Local Government Advisory Committee (LGAC) Mayor Pro Tem Farrell -Town of Pittsboro Alcohol Beverage Control Board (ABC) Liaison Commissioner Bonitz -Chatham County Climate Change Advisory Committee (CCAC) and Central Pines Regional Council Commissioner Foley -Chatham County Economic Development Corporation (EDC) and Chatham County Affordable Housing Committee (AHAC) Commissioner Hunziker -Town of Pittsboro Parks and Recreation Advisory Board (PARAB) Liaison Commissioner Thurber- Chatham Chamber of Commerce and Pittsboro Downtown Advisory Board (PDAB) Liaison
  12. 5.III Public Comment
    Procedural
    Speakers should sign up with the Town Clerk before the start of the meeting. Speakers are limited to three (3) minutes – a timer will be on the screen. Each speaker should state their name and address at the beginning of their comments. While the Board is interested in hearing your comments and concerns, speakers should not expect any board action or deliberation on the remarks made. Please direct your comments to the Board as a whole. Comments or concerns requiring further investigation will be referred to the appropriate town official. We thank you for being considerate of the Town Board, Staff, and other speakers. Any speaker handouts shall be given to the Town Clerk and will be distribu…
  13. 6.I Presentation: Transportation On Demand (TOD)
    Presentation Transit
    Presented by Anna Testerman, Executive Director of Chatham Transit Network.
  14. 6.II Update: Response to Unified Development Ordinance (UDO) Policy & Regulatory Request from Board of Commissioners
    Staff Recommendation: Update transportation provisions, including TIA requirements and parking guidelines; prepare a fiscal impact analysis model for development applications; and draft a Watershed and Natural Resources Management Plan and Permit System. Coordinate these work items with the comprehensive UDO rewrite. Suggested Motion: N/A
    Board voted to keep all parking in the West Salisbury Street lot until it approves the parking study and master plan, and asked for alternative streetscape designs
  15. 6.III Update: Stormwater Fee Study
    Advisory Board Recommendation: N/A Staff Recommendation: No action required, information and discussion item only.
  16. 8.I Presentation: New Town Hall Project Update 3 (Revised 11.9.2026)
    Presentation Added the day of the meeting Public facilities
    Staff give the third update on the new Town Hall project; the item was revised on November 9.
    Option three, all brick, approved; a motion adding a north-side public entrance failed
  17. 8.II Request: Downtown Pittsboro Logo
    Other
    Advisory Board Recommendation: At its regular meeting on October 1, 2026, the Pittsboro Downtown Advisory Board recommended approval of the proposed Downtown Pittsboro logo. Staff Recommendation: Consideration of the proposed Downtown Pittsboro logo as presented in the attachment. Suggested Motion: “motion to approve the Downtown Pittsboro logo as presented.”
    Sent back to the downtown advisory board for public input and a PBO version
  18. 8.III Discussion: Review of Alleged Code of Ethics and Conduct Violations
    Discussion item Ethics and transparency
    Recommended Board Actions: The following actions are recommended for the Board's consideration, in sequence: 1. Excuse Commissioner Bonitz from Voting Consider and vote on a motion to excuse Commissioner Bonitz from voting on matters concerning the allegations involving his official conduct, pursuant to N.C.G.S. § 160A-75(a). 2. Determine Whether a Violation Occurred Review the notice of allegations, Commissioner Bonitz's response, and any supporting information. Determine whether a violation of the Town's Code of Ethics and Conduct occurred, whether no violation occurred, or whether additional information or review is necessary before reaching a determination. 3. Determine Appropriate Acti…
    Bonitz excused from voting; board accepted his apology, dismissed the remaining allegations without findings and closed the matter
  19. 8.IV PB-26-243 Chatham Park South Village Section Design Plans (SDP) - 2.1, 2.2, 2.4, D2
    Advisory Board Recommendation: At its regularly scheduled meeting on September 21, 2026, the Planning Board recommended approval, with conditions, of the Chatham Park South Village Section Design Plans for Sections 2.1, 2.2, 2.4, and D2. Staff Recommendation: Staff recommends adoption of the Resolution and approval of the Section Design Plans for Sections 2.1, 2.2, 2.4, and D2 with the Staff and Planning Board recommended conditions. Suggested Motion: “…a motion adopt the attached Resolution and to approve the subject Section Design Plan with the recommended conditions."
    Motion to approve failed; board asked for a full traffic study, proportionality agreement and travel demand model before approval
  20. 8.V Request: Chatham Park PDD-Amended and Restated Master Stormwater Agreement
    Suggested Motion: "a motion to approve the First Amendment and the revised Master Agreement"
    Approved
  21. 8.VI Minutes: October 12, 2026 Regular Meeting of The Board of Commissioners
    Minutes approval
    Approved
  22. 8.VII Request: Town of Pittsboro Board of Commissioners 2027 Regular Meeting Schedule
    Other
    Sets the board's 2027 regular meeting schedule.
    Approved; the mayor expects revisions in December
  23. 8.VIII Position Request: Recreation and Engagement Specialist
    Creates a Recreation & Engagement Specialist post at pay grade 20 in Parks and Recreation, funded from the vacant Recreation Coordinator position. It would take on administrative and customer service work now split among several employees.
    Approved
  24. 8.IX Request: Volunteer Program Policy Revisions
    Other
    Revisions to the town's volunteer program policy.
    Approved as presented; staff to check whether a felony-disclosure question can be added
  25. 9 CLOSED SESSION (Revised 11.9.2026)
    Closed session Added the day of the meeting Litigation and settlements
    The Board of Commissioners wish to hold a Closed Session pursuant to N.C.G.S.: 1. § 143-318.11 (a)(1) to prevent the disclosure of information that is privileged or confidential pursuant to the law of this State or of the United States, or not considered a public record within the meaning of Chapter 132 of the General Statutes, 2. § 143-318.11 (a)(3) to consider and give instructions concerning a judicial action titled Goodwin Land Holdings, LLC, and Congruus LLC, vs. Town of Pittsboro, 3. § 143-318.11 (a)(6) to investigate a grievance and discuss personnel. Suggested motion : "motion to enter into closed session pursuant to N.C.G.S. §143-318.11 (a)(1) to prevent the disclosure of informati…

Agenda changes

What moved between published versions of this agenda. Item numbers shift constantly as things are inserted, so only genuine additions and removals are listed.

Other recent meetings of this board